Installation of Lavatory E
TASK 25-43-42-400-001-A
Installation of Lavatory E
Self Explanatory
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 25-43-42-860-053-L ** ON A/C NOT FOR ALL
Subtask 25-43-42-420-071-B ** ON A/C NOT FOR ALL
Subtask 25-43-42-410-073-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:35:24 UTC
Installation of Lavatory E
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
BE CAREFUL WHEN YOU REMOVE OR INSTALL THIS EQUIPMENT. THIS EQUIPMENT IS HEAVY (MORE THAN 12 KG (26.5 lb)) AND CAN CAUSE INJURY AND/OR DAMAGE.
1. Reason for the JobSelf Explanatory
NOTE: More than one person is necessary for this procedure.
2. Job Set-up InformationA. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03GBB1) | Synthetic Oil base Grease-General Purpose Clay Thickened - |
| (Material No.05RAC1) | Adhesive Film Tape-- Aluminium Foil - Sound damping - |
| (Material No.06AAB1) | Polysulfide Sealant-General Purpose Fillet - |
| (Material No.06AEA1) | Polysulfide Sealant-Low Adhesion Brushable - |
| (Material No.06CMD9) | Silicone Adhesive Sealant-General Purpose One part legacy |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| (Material No.08BBD1) | Non Aqueous Cleaner-- Isopropyl Alcohol - |
| (Material No.12ACC1) | Corrosion Preventive Compound-Heavy Duty Soft Film - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| No specific | packings NAS 1611-209 |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| 162CW, 162DW | |
| 251JC, 252AX, 252BX, 262BC, 262TW, 262UW, 262VW | |
| 252CX |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 5 | PACKINGS | AIPC 25-43-04-25-240 |
| 5 | PACKINGS | AIPC 25-43-04-26-240 |
| 6 | PACKING | AIPC 25-43-04-26-240 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 11-00-00-400-007-A | Installation of the ESSO (Scotchcal Labels) |
| TASK 12-24-38-680-001-A | Draining of the Potable Water System (with Electrical Power) |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 21-21-00-710-002-A | Operational Test of the Individual Air Outlet |
| TASK 21-23-00-720-002-A | Functional Test of an Air Extraction Point |
| TASK 23-73-00-710-005-A | Operational Test of the Passenger Address (PA) system |
| TASK 23-73-00-710-007-A | Operational Test of the Passenger Call System |
| TASK 23-73-00-710-022-A | Operational Test of the Passenger Address (PA) system |
| TASK 23-73-00-710-024-A | Operational Test of the Passenger Call System |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 25-20-00-350-003-A | Repair of the Non-Textile Floor Covering (NTF) |
| TASK 25-21-41-000-001-A | Removal of the Passenger Seats |
| TASK 25-21-41-400-001-A | Installation of the Passenger Seats |
| TASK 25-22-41-000-001-A | Removal of the Wall-Mounted Cabin-Attendant Seats |
| TASK 25-22-41-400-001-A | Installation of the Wall-Mounted Cabin-Attendant Seats |
| TASK 25-22-43-000-001-A | Removal of the Cabin Attendant Swivel-Seat |
| TASK 25-22-43-400-001-A | Installation of the Cabin Attendant Swivel-Seat |
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-42-000-002-A | Removal of the Ceiling Panels - Aft Utility Area |
| TASK 25-23-42-400-002-A | Installation of the Ceiling Panels - Aft Utility Area |
| TASK 25-23-43-000-001-A | Removal of the Upper Sidewall Panel |
| TASK 25-23-43-400-001-A | Installation of the Upper Sidewall Panel |
| TASK 25-23-44-000-001-A | Removal of the Lower Sidewall Panels (Dado Panels) |
| TASK 25-23-44-400-001-A | Installation of the Lower Sidewall Panels (Dado Panels) |
| TASK 25-23-45-000-004-A | Removal of the Door Frame Linings from the Right Aft Passenger/Crew Door |
| TASK 25-23-45-400-005-A | Installation of the Door Frame Linings on the Right Aft Passenger/Crew Door |
| TASK 25-23-48-000-001-A | Removal of the Cove Light Panel |
| TASK 25-23-48-400-001-A | Installation of the Cove Light Panel |
| TASK 25-26-41-000-003-A | Removal of the Aft Curtain Rail |
| TASK 25-26-41-400-003-A | Installation of the Aft Curtain Rail |
| TASK 25-27-44-000-007-A | Removal of the Stowage AFT RH |
| TASK 25-27-44-400-007-A | Installation of the Stowage AFT RH |
| TASK 25-27-46-000-001-A | Removal of the Forward Doghouse |
| TASK 25-27-46-400-001-A | Installation of the Forward Doghouse |
| TASK 25-28-42-000-001-A | Removal of the Non-Textile Floor Covering (NTF) |
| TASK 25-28-42-400-001-A | Installation of the Non-Textile Floor Covering (NTF) |
| TASK 25-45-19-000-001-A | Removal of the Lavatory Door |
| TASK 25-45-19-400-001-A | Installation of the Lavatory Door |
| TASK 25-45-22-000-001-A | Removal of the Toilet Shroud and the Seat |
| TASK 25-45-22-400-001-A | Installation of the Toilet Shroud and the Seat |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 26-17-00-710-001-A | Operational Test of the Lavatory Smoke-Detection System |
| TASK 33-24-00-710-001-A | Operational Test of the Lavatory Lighting LQ |
| TASK 33-26-00-710-001-A | Operational Test of the Lavatory Lighted Signs WJ |
| TASK 33-51-00-710-007-A | Operational Test of the Emergency Lighting in the Cabin with the 'LIGHT EMER' Pushbutton Switch |
| TASK 35-21-41-000-001-A | Removal of the Emergency Oxygen Containers |
| TASK 35-21-41-400-001-A | Installation of the Emergency Oxygen Containers |
| TASK 35-23-00-710-001-A | Operational Check of Manual Mask Release |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
| TASK 38-12-00-710-002-A | Operational Test of the Potable Water-Distribution System (with a Ground Air-Supply Cart) |
| TASK 38-12-00-710-004-A | Operational Test of a Potable Water Heater |
| TASK 38-30-00-010-002-A | Removal of the Toilet Drain Lines |
| TASK 38-30-00-410-002-A | Installation of the Toilet Drain Lines |
| TASK 38-31-00-710-009-A | Operational Test of the Toilet Unit |
| TASK 38-31-41-000-001-A | Removal of a Toilet Assembly |
| TASK 38-31-41-400-001-A | Installation of a Toilet Assembly |
| TASK 38-32-00-710-002-A | Operational Test of the Waste/Water Drain System |
Subtask 25-43-42-860-053-L ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons not to do the servicing of the potable water system.
(4) Make sure that the curtain and curtain rail are removed (Ref. AMM TASK 25-26-41-000-003).
Subtask 25-43-42-860-053-AB ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons not to do the servicing of the potable water system.
(4) Make sure that the curtain and curtain rail are removed (Ref. AMM TASK 25-26-41-000-003).
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons not to do the servicing of the potable water system.
(4) Make sure that the cabin attendant swivel-seat is removed (Ref. AMM TASK 25-22-43-000-001).
(5) Make sure that the stowage forward of the lavatory is removed (Ref. AMM TASK 25-27-44-000-007).
(6) Make sure that the curtain(s) and the curtain rail(s) are removed (Ref. AMM TASK 25-26-41-000-003).
Subtask 25-43-42-860-053-AG ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons not to do the servicing of the potable water system.
(4) Make sure that the cabin attendant swivel-seat is removed (Ref. AMM TASK 25-22-43-000-001).
(5) Make sure that the stowage forward of the lavatory is removed (Ref. AMM TASK 25-27-44-000-007).
(6) Make sure that the curtain(s) and the curtain rail(s) are removed (Ref. AMM TASK 25-26-41-000-003).
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(3) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to do the servicing of the potable water system.
(5) Make sure that the cabin attendant swivel-seat is removed (Ref. AMM TASK 25-22-43-000-001).
(6) Make sure that each wall-mounted Cabin Attendant Seat(s) (CAS) is (are) removed (Ref. AMM TASK 25-22-41-000-001).
(7) Make sure that the curtain(s) and the curtain rail(s) are removed (Ref. AMM TASK 25-26-41-000-003).
(8) Make sure that the passenger seat(s) adjacent to the lavatory is (are) removed (Ref. AMM TASK 25-21-41-000-001).
Subtask 25-43-42-860-053-BL ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
WARNING:
MAKE SURE THAT THE POTABLE WATER SYSTEM IS DEPRESSURIZED. A PRESSURIZED SYSTEM CAN CAUSE INJURY TO PERSONS WHEN THEY DO WORK ON IT.
(2) Make sure that the potable water system is depressurized (Ref. AMM TASK 38-10-00-614-002). (3) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to do the servicing of the potable water system.
(5) Make sure that the cabin attendant swivel-seat is removed (Ref. AMM TASK 25-22-43-000-001).
(6) Make sure that each wall-mounted Cabin Attendant Seat(s) (CAS) is (are) removed (Ref. AMM TASK 25-22-41-000-001).
(7) Make sure that the curtain(s) and the curtain rail(s) are removed (Ref. AMM TASK 25-26-41-000-003).
(8) Make sure that the passenger seat(s) adjacent to the lavatory is (are) removed (Ref. AMM TASK 25-21-41-000-001).
A. Aircraft Maintenance Configuration
(1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons not to do the servicing of the potable water system.
(4) Make sure that the wall-mounted cabin-attendant seat is removed (Ref. AMM TASK 25-22-41-000-001).
(5) Make sure that the curtain(s) and the curtain rail(s) are removed (Ref. AMM TASK 25-26-41-000-003).
(6) Make sure that the passenger seat adjacent to the lavatory is removed (Ref. AMM TASK 25-21-41-000-001).
(7) Make sure that the doghouse is removed (Ref. AMM TASK 25-27-46-000-001).
Subtask 25-43-42-860-054-A ** ON A/C NOT FOR ALL (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-42-00-861-001).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Make sure that the WARNING NOTICE(S) is in position to tell persons not to do the servicing of the potable water system.
(4) Make sure that the wall-mounted cabin-attendant seat is removed (Ref. AMM TASK 25-22-41-000-001).
(5) Make sure that the curtain(s) and the curtain rail(s) are removed (Ref. AMM TASK 25-26-41-000-003).
(6) Make sure that the passenger seat adjacent to the lavatory is removed (Ref. AMM TASK 25-21-41-000-001).
(7) Make sure that the doghouse is removed (Ref. AMM TASK 25-27-46-000-001).
B. Aircraft Maintenance Configuration
utility area are removed.
(1) Make sure that ceiling panel 262BC and the trim panel in the aft utility area are removed (Ref. AMM TASK 25-23-42-000-002).
(2) Make sure that ceiling panel 251JC is removed (Ref. AMM TASK 25-23-41-000-001).
(3) Make sure that cove light panel 252CX is removed (Ref. AMM TASK 25-23-48-000-001).
(4) Make sure that upper sidewall panel 252BX is removed (Ref. AMM TASK 25-23-43-000-001).
(5) Make sure that lower sidewall panel 252AX is removed (Ref. AMM TASK 25-23-44-000-001).
Subtask 25-43-42-860-054-D ** ON A/C NOT FOR ALL utility area are removed.
(1) Make sure that ceiling panel 262BC and the trim panel in the aft utility area are removed (Ref. AMM TASK 25-23-42-000-002).
(2) Make sure that ceiling panel 251JC is removed (Ref. AMM TASK 25-23-41-000-001).
(3) Make sure that cove light panel 252CX is removed (Ref. AMM TASK 25-23-48-000-001).
(4) Make sure that upper sidewall panel 252BX is removed (Ref. AMM TASK 25-23-43-000-001).
(5) Make sure that lower sidewall panel 252AX is removed (Ref. AMM TASK 25-23-44-000-001).
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable ceiling panel and the trim panel in the aft utility area are removed (Ref. AMM TASK 25-23-42-000-002).
(2) Make sure that the applicable ceiling panel(s) is (are) removed (Ref. AMM TASK 25-23-41-000-001).
(3) Make sure that the applicable cove light panel(s) is (are) removed (Ref. AMM TASK 25-23-48-000-001).
(4) Make sure that the applicable upper sidewall panel(s) is removed (Ref. AMM TASK 25-23-43-000-001).
(5) Make sure that the applicable lower sidewall panel(s) is removed (Ref. AMM TASK 25-23-44-000-001).
Subtask 25-43-42-860-054-V ** ON A/C NOT FOR ALL (1) Make sure that the applicable ceiling panel and the trim panel in the aft utility area are removed (Ref. AMM TASK 25-23-42-000-002).
(2) Make sure that the applicable ceiling panel(s) is (are) removed (Ref. AMM TASK 25-23-41-000-001).
(3) Make sure that the applicable cove light panel(s) is (are) removed (Ref. AMM TASK 25-23-48-000-001).
(4) Make sure that the applicable upper sidewall panel(s) is removed (Ref. AMM TASK 25-23-43-000-001).
(5) Make sure that the applicable lower sidewall panel(s) is removed (Ref. AMM TASK 25-23-44-000-001).
B. Aircraft Maintenance Configuration
(1) Make sure that the ceiling panel 262BC and the trim panel (Ref. AMM TASK 25-23-42-000-002) in the aft utility area are removed.
(2) Make sure that the ceiling panel 251JC is removed (Ref. AMM TASK 25-23-41-000-001).
(3) Make sure that the upper sidewall panel 252BX is removed (Ref. AMM TASK 25-23-43-000-001).
(4) Make sure that the lower sidewall panel 252AX is removed (Ref. AMM TASK 25-23-44-000-001).
Subtask 25-43-42-860-055-B ** ON A/C NOT FOR ALL (1) Make sure that the ceiling panel 262BC and the trim panel (Ref. AMM TASK 25-23-42-000-002) in the aft utility area are removed.
(2) Make sure that the ceiling panel 251JC is removed (Ref. AMM TASK 25-23-41-000-001).
(3) Make sure that the upper sidewall panel 252BX is removed (Ref. AMM TASK 25-23-43-000-001).
(4) Make sure that the lower sidewall panel 252AX is removed (Ref. AMM TASK 25-23-44-000-001).
C. Aircraft Maintenance Configuration
(1) Make sure that door frame lining-panels 262VW 262UW and 262TW are removed (Ref. AMM TASK 25-23-45-000-004).
Subtask 25-43-42-860-055-E ** ON A/C NOT FOR ALL (1) Make sure that door frame lining-panels 262VW 262UW and 262TW are removed (Ref. AMM TASK 25-23-45-000-004).
C. Aircraft Maintenance Configuration
(1) Make sure that the door-frame lining panels are removed (Ref. AMM TASK 25-23-45-000-004).
Subtask 25-43-42-860-056-A ** ON A/C NOT FOR ALL (1) Make sure that the door-frame lining panels are removed (Ref. AMM TASK 25-23-45-000-004).
D. Aircraft Maintenance Configuration
(1) Make sure that the lavatory door is removed (Ref. AMM TASK 25-45-19-000-001).
(2) Make sure that emergency oxygen container 34WR is removed (Ref. AMM TASK 35-21-41-000-001).
(3) Make sure that the toilet assembly is removed (Ref. AMM TASK 38-31-41-000-001).
(4) Make sure that the toilet drain line from behind the lavatory is removed (Ref. AMM TASK 38-30-00-010-002).
Subtask 25-43-42-860-057-A ** ON A/C NOT FOR ALL (1) Make sure that the lavatory door is removed (Ref. AMM TASK 25-45-19-000-001).
(2) Make sure that emergency oxygen container 34WR is removed (Ref. AMM TASK 35-21-41-000-001).
(3) Make sure that the toilet assembly is removed (Ref. AMM TASK 38-31-41-000-001).
(4) Make sure that the toilet drain line from behind the lavatory is removed (Ref. AMM TASK 38-30-00-010-002).
E. Aircraft Maintenance Configuration
(1) In the aft cargo compartment:
(a) Make sure that partition 162DW is removed (Ref. AMM TASK 25-55-12-000-001).
(b) Make sure that sidewall panel 162CW is removed (Ref. AMM TASK 25-55-12-000-003).
(2) Make sure that the toilet shroud is removed (Ref. AMM TASK 25-45-22-000-001).
Subtask 25-43-42-860-057-B ** ON A/C NOT FOR ALL (1) In the aft cargo compartment:
(a) Make sure that partition 162DW is removed (Ref. AMM TASK 25-55-12-000-001).
(b) Make sure that sidewall panel 162CW is removed (Ref. AMM TASK 25-55-12-000-003).
(2) Make sure that the toilet shroud is removed (Ref. AMM TASK 25-45-22-000-001).
E. Aircraft Maintenance Configuration
(1) Make sure that the toilet shroud is removed (Ref. AMM TASK 25-45-22-000-001).
Subtask 25-43-42-860-052-A ** ON A/C NOT FOR ALL (1) Make sure that the toilet shroud is removed (Ref. AMM TASK 25-45-22-000-001).
F. Aircraft Maintenance Configuration
(1) If necessary, examine the Non-Textile Floor covering (NTF).
(a) If the condition of the NTF is not satisfactory, repair it (Ref. AMM TASK 25-20-00-350-003).
(b) If you cannot repair the NTF, replace it (Ref. AMM TASK 25-28-42-000-001) and (Ref. AMM TASK 25-28-42-400-001).
Subtask 25-43-42-865-051-A ** ON A/C NOT FOR ALL (1) If necessary, examine the Non-Textile Floor covering (NTF).
(a) If the condition of the NTF is not satisfactory, repair it (Ref. AMM TASK 25-20-00-350-003).
(b) If you cannot repair the NTF, replace it (Ref. AMM TASK 25-28-42-000-001) and (Ref. AMM TASK 25-28-42-400-001).
G. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 25-43-42-210-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/SDCU/CHAN1 | 11WQ | C06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CABIN | 79WL | H07 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R AFT | 168RH | M14 |
| 121VU | COM NAV/CIDS/DEU A NORM/L AFT | 167RH | M13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R AFT | 168RH | M12 |
| 121VU | COM NAV/CIDS/DEU A NORM/L AFT | 167RH | M11 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/SDCU/CHAN2 | 12WQ | T18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | POT/WASTE WIP-HEATER-CTL | 2DW | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LIGHT-LAV | 1LQ | J01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | POT WIP-HEATER-CTL | 2DW | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAVATORY AFT-OCCUPIED | 11WJ | B04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAV AFT-HOT WATER-E | 9MB | B03 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAV SHAVER SOCKET | 1MT | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAV AFT-HOT WATER-E/L | 9MB | B03 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAV AFT-HOT WATER-L | 9MB | C04 |
H. Preparation for Installation
(1) If necessary, remove the SAFETY BARRIER(S).
(2) Clean the component interfaces and the adjacent area.
(3) Remove the sealant from the floor panel and the attached components with the SCRAPER - NON METALLIC.
(4) Clean the area with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Isopropyl Alcohol - (Material No.08BBD1) .
(5) Do an inspection of the component interfaces and the adjacent area.
(6) Make sure that the parts retained from the removed component are clean and in the correct condition.
(7) Make sure that the placards of the retained/new components are in the correct position and in good condition.
(8) If necessary, install the new placards:
(9) Prepare the bonding (Ref. AMM TASK 20-28-00-912-802).
4. Procedure(1) If necessary, remove the SAFETY BARRIER(S).
(2) Clean the component interfaces and the adjacent area.
(3) Remove the sealant from the floor panel and the attached components with the SCRAPER - NON METALLIC.
(4) Clean the area with Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Isopropyl Alcohol - (Material No.08BBD1) .
(5) Do an inspection of the component interfaces and the adjacent area.
(6) Make sure that the parts retained from the removed component are clean and in the correct condition.
(7) Make sure that the placards of the retained/new components are in the correct position and in good condition.
(8) If necessary, install the new placards:
(9) Prepare the bonding (Ref. AMM TASK 20-28-00-912-802).
Subtask 25-43-42-420-071-B ** ON A/C NOT FOR ALL
A. Installation of the Floor Pan Assembly
(1) If the rubber strips (18), (19) and (21) from the floor panel (20) are removed, install them.
(2) If the screws (16) from the floor angle brackets (17) are removed, install them.
(4) Apply the special materials Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (5).
(5) Put the door sill (6) in position and install the screws (5).
(6) TORQUE the screws (5) to between 0.42 and 0.37 m.daN (37.17 and 32.74 lbf.in )
.
(7) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to the floor pan and the floor panel at the lavatory door opening.
(8) Cut the rubber strip (4) to length and put it in position.
(9) Put the rear partition panel (1) in position and install the washers (2) and the screws (3).
(10) Make sure that the work area is clean and clear of tools and other items.
(11) Put the floor pan (9) in position and install the washers (8) and the screws (7).
(12) Put the front-shroud panel (10) in position and install the washers (11) and the screws (12).
(14) Make sure that the work area is clean and clear of tools and other items.
(15) Put the floor panel (13) in position and install the screws (22), the washers (14) and the screws (15).
(16) TORQUE the screws (22) to between 0.46 and 0.38 m.daN (40.71 and 33.63 lbf.in )
.
(19) Fill the floor panel joints with Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) .
(20) When the sealant is dry, cut the Adhesive Film Tape-- Aluminium Foil - Sound damping - (Material No.05RAC1) to length, and put it on the floor panel joints.
Subtask 25-43-42-420-071-E ** ON A/C NOT FOR ALL (1) If the rubber strips (18), (19) and (21) from the floor panel (20) are removed, install them.
(2) If the screws (16) from the floor angle brackets (17) are removed, install them.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(3) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to the floor pan inside the lavatory. (4) Apply the special materials Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (5).
(5) Put the door sill (6) in position and install the screws (5).
(6) TORQUE the screws (5) to between 0.42 and 0.37 m.daN (37.17 and 32.74 lbf.in )
. (7) Apply the Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to the floor pan and the floor panel at the lavatory door opening.
(8) Cut the rubber strip (4) to length and put it in position.
(9) Put the rear partition panel (1) in position and install the washers (2) and the screws (3).
(10) Make sure that the work area is clean and clear of tools and other items.
(11) Put the floor pan (9) in position and install the washers (8) and the screws (7).
(12) Put the front-shroud panel (10) in position and install the washers (11) and the screws (12).
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(13) Apply the Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) to the floor pan and the floor panel at the lavatory door area. (14) Make sure that the work area is clean and clear of tools and other items.
(15) Put the floor panel (13) in position and install the screws (22), the washers (14) and the screws (15).
(16) TORQUE the screws (22) to between 0.46 and 0.38 m.daN (40.71 and 33.63 lbf.in )
. WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(17) Cut the new SYNTHETIC FIBRE CORD (NYLON) 2.5MM DIA to length and put the cord in the floor panel joints. NOTE: Cut the synthetic fiber cord longer than the necessary length to make an overlap of approximately 200 mm (8.0 in.) at each end.
(18) After application of the sealant, turn the ends back to make a loop and press the loop into the sealant. This helps the next removal procedure. (19) Fill the floor panel joints with Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) .
(20) When the sealant is dry, cut the Adhesive Film Tape-- Aluminium Foil - Sound damping - (Material No.05RAC1) to length, and put it on the floor panel joints.
A. Installation of the Floor Pan Assembly
(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Install the rubber strips (6), (8) and (9) on the floor panel (7).
(3) Put the floor angle brackets (5) in position on the floor panel (7) and install the screws (4).
(5) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (1).
(6) Install the door sill (2) and the screws (3) on the floor pan assembly (1).
(7) Tighten the screws (3).
(8) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to the floor pan assembly (1) and the floor panel (7) at the lavatory door opening.
(9) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-43-42-420-070-B ** ON A/C NOT FOR ALL (1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Install the rubber strips (6), (8) and (9) on the floor panel (7).
(3) Put the floor angle brackets (5) in position on the floor panel (7) and install the screws (4).
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(4) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to the floor pan in the inner side the lavatory. (5) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the screws (1).
(6) Install the door sill (2) and the screws (3) on the floor pan assembly (1).
(7) Tighten the screws (3).
(8) Apply Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) to the floor pan assembly (1) and the floor panel (7) at the lavatory door opening.
(9) Make sure that the work area is clean and clear of tools and other items.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(10) Apply Polysulfide Sealant-Low Adhesion Brushable - (Material No.06AEA1) to the floor pan assembly (1) and the floor panel (7) at the lavatory door area. B. Assembly of the Lavatory
(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Put the lavatory assemblies (12) and (11) in the center of the aircraft aisle.
(3) Put the lavatory assemblies (12) and (11) in position and install the washers (15) and (14) and the screws (16) and (13).
(4) Tighten the screws (16) and (13).
(5) Install the screw (10) in the door side frame.
(6) Tighten the screw (10).
(7) Install the washers (8), screws (9) and (7) and ceiling panel (6).
(8) Tighten the screws (9) and (7).
(9) Put the lavatory assemblies (12) and (11) in position on the floor pan assembly (1).
(10) Put the washers (3) in position and install the screws (2).
(11) Tighten the screws (2).
(12) Put the washers (4) in position and install the screws (5).
(13) Tighten the screws (5).
(14) Apply a bead of Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) around the floor pan assembly (1) in the inner side of the lavatory assembly.
Subtask 25-43-42-420-069-A ** ON A/C NOT FOR ALL (1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Put the lavatory assemblies (12) and (11) in the center of the aircraft aisle.
(3) Put the lavatory assemblies (12) and (11) in position and install the washers (15) and (14) and the screws (16) and (13).
(4) Tighten the screws (16) and (13).
(5) Install the screw (10) in the door side frame.
(6) Tighten the screw (10).
(7) Install the washers (8), screws (9) and (7) and ceiling panel (6).
(8) Tighten the screws (9) and (7).
(9) Put the lavatory assemblies (12) and (11) in position on the floor pan assembly (1).
(10) Put the washers (3) in position and install the screws (2).
(11) Tighten the screws (2).
(12) Put the washers (4) in position and install the screws (5).
(13) Tighten the screws (5).
(14) Apply a bead of Polysulfide Sealant-General Purpose Fillet - (Material No.06AAB1) around the floor pan assembly (1) in the inner side of the lavatory assembly.
C. Installation of the Lower Attachments
(2) Put the packings (3) in position at the lavatory lower attach-points.
(3) Put the lavatory assembly in position and install the bolts (2) in the wall fitting (1).
(a) TORQUE the bolts (2) to between 0.55 and 0.45 m.daN (48.67 and 39.82 lbf.in )
.
(b) Apply the Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) to the bolts (2).
(4) Install the covers (4).
Subtask 25-43-42-420-069-H ** ON A/C NOT FOR ALL WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(1) Apply the Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the new packings NAS 1611-209 (3) and the bolts (2). (2) Put the packings (3) in position at the lavatory lower attach-points.
(3) Put the lavatory assembly in position and install the bolts (2) in the wall fitting (1).
(a) TORQUE the bolts (2) to between 0.55 and 0.45 m.daN (48.67 and 39.82 lbf.in )
. (b) Apply the Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) to the bolts (2).
(4) Install the covers (4).
C. Installation of the Lower Attachments
(1) Apply Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the bushes (6), the new AIPC 25-43-04-26-240 PACKINGS (5) and the bolts (1).
(2) Put the new packings (5) and the bushes (6) in position at the attachment point locations.
(3) Put the lavatory assembly in position.
(4) Put the eccentric bushes (3) and (2) in position.
(a) If necessary, turn the eccentric bushes (3) and (2) until it is possible to install the bolts (1).
(5) Tighten the bolts (1).
(7) Install the covers (4).
Subtask 25-43-42-420-069-M ** ON A/C NOT FOR ALL (1) Apply Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the bushes (6), the new AIPC 25-43-04-26-240 PACKINGS (5) and the bolts (1).
(2) Put the new packings (5) and the bushes (6) in position at the attachment point locations.
(3) Put the lavatory assembly in position.
(4) Put the eccentric bushes (3) and (2) in position.
(a) If necessary, turn the eccentric bushes (3) and (2) until it is possible to install the bolts (1).
(5) Tighten the bolts (1).
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(6) Apply the Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) to the bolts (1). (7) Install the covers (4).
C. Installation of the Lower Attachments
(1) Apply Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the bushes (7), the new AIPC 25-43-04-26-240 PACKING (6) and the bolts (2).
(2) Put the new packings (6) and the bushes (7) in position at the attachment point locations.
(3) Put the lavatory assembly in position.
(4) Put the eccentric bushes (4) and (3) in position.
(a) If necessary, turn the eccentric bushes (4) and (3) until it is possible to install the bolts (2).
(5) Tighten the bolts (2).
(7) Put the cover (11) in position and install the screws (10).
(8) Put the cover plate (9) in position and install the screws (8).
(9) Install the covers (5).
Subtask 25-43-42-420-069-AE ** ON A/C NOT FOR ALL (1) Apply Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the bushes (7), the new AIPC 25-43-04-26-240 PACKING (6) and the bolts (2).
(2) Put the new packings (6) and the bushes (7) in position at the attachment point locations.
(3) Put the lavatory assembly in position.
(4) Put the eccentric bushes (4) and (3) in position.
(a) If necessary, turn the eccentric bushes (4) and (3) until it is possible to install the bolts (2).
(5) Tighten the bolts (2).
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(6) Apply the Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) to the bolts (2). (7) Put the cover (11) in position and install the screws (10).
(8) Put the cover plate (9) in position and install the screws (8).
(9) Install the covers (5).
C. Installation of the Lower Attachments
(1) Apply Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the bushes (6), the new
(3) Put the lavatory assembly in position.
(4) Put the eccentric bushes (3) and (2) in position.
(a) If necessary, turn the eccentric bushes (3) and (2) until it is possible to install the bolts (1).
(5) Tighten the bolts (1).
(7) Install the covers (4).
Subtask 25-43-42-420-068-A ** ON A/C NOT FOR ALL (1) Apply Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) to the bushes (6), the new
- AIPC 25-43-04-25-240 PACKINGS (5)
- AIPC 25-43-04-26-240 PACKINGS (5)
and the bolts (1).
(3) Put the lavatory assembly in position.
(4) Put the eccentric bushes (3) and (2) in position.
(a) If necessary, turn the eccentric bushes (3) and (2) until it is possible to install the bolts (1).
(5) Tighten the bolts (1).
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(6) Apply the Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) to the bolts (1). (7) Install the covers (4).
D. Installation of the Upper Attachment(s)
(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Connect the tie-rod (2) to the aircraft structure and install the quick-release pin (1).
(3) If necessary, adjust the tie-rod (2) as follows:
(b) Adjust the tie-rod (2) until you can install the quick-release pin (1).
(c) Make sure that the tie-rod ends are safetied.
(d) Tighten each locknut and safety it with new lockwire14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
(4) If the tie-rod (4) is removed, install the quick-release pin (3) to the aircraft structure.
(5) If necessary, adjust the tie-rod (4) as follows:
(b) Adjust the tie-rod (4) until you can install the quick-release pin (3).
(c) Make sure that the tie-rod ends are safetied.
(d) Tighten each locknut and safety it with new lockwire14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
Subtask 25-43-42-930-051-A ** ON A/C NOT FOR ALL (1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Connect the tie-rod (2) to the aircraft structure and install the quick-release pin (1).
(3) If necessary, adjust the tie-rod (2) as follows:
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(a) Cut and discard the lockwire and loosen the locknuts. (b) Adjust the tie-rod (2) until you can install the quick-release pin (1).
(c) Make sure that the tie-rod ends are safetied.
(d) Tighten each locknut and safety it with new lockwire
(4) If the tie-rod (4) is removed, install the quick-release pin (3) to the aircraft structure.
(5) If necessary, adjust the tie-rod (4) as follows:
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(a) Cut and discard the lockwire and loosen the locknuts. (b) Adjust the tie-rod (4) until you can install the quick-release pin (3).
(c) Make sure that the tie-rod ends are safetied.
(d) Tighten each locknut and safety it with new lockwire
E. Markings on the Ventilation Connections, the Potable Water Connections and the Waste-Water Drain Connections
(1) When you connect/install the components, refer to the match marks made during the removal procedure.
Subtask 25-43-42-420-067-C ** ON A/C NOT FOR ALL (1) When you connect/install the components, refer to the match marks made during the removal procedure.
F. Installation of the Water Connections
(b) Put the potable water tube (3) and the hose (8) in position on the fittings (7) and tighten the nuts (2).
(c) TORQUE the nuts (2) to between 6.19 and 5.61 m.daN (45.65 and 41.37 lbf.ft )
.
(d) Make sure that the hose (8) is not twisted.
(e) Put the bonding straps (4) in position and install the washer (6) and the nut (5). Do the bonding (Ref. AMM TASK 20-28-00-912-802).
(f) Tighten the nut (5).
(2) Connect the waste-water drain connection as follows:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Put the drain tube (10) in position and install the clamp (9).
(c) Tighten the clamp (9).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Close the sanitary-cabinet access door (1).
Subtask 25-43-42-420-067-E ** ON A/C NOT FOR ALL WARNING:
DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
(1) Connect the potable water connections as follows: WARNING:
MAKE SURE THAT THE EQUIPMENT YOU USE FOR THIS PROCEDURE IS CLEAN AND APPROVED FOR THE POTABLE WATER SYSTEM. IF NOT IT CAN CAUSE CONTAMINATION OF THE POTABLE WATER SYSTEM.
WARNING:
BEFORE YOU DO WORK ON THE POTABLE WATER SYSTEM, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION. (CONTAMINATION FROM TOILET WASTE IS DANGEROUS TO HEALTH).
(a) Remove the PLUG-BLANKING from each disconnected line end.(b) Put the potable water tube (3) and the hose (8) in position on the fittings (7) and tighten the nuts (2).
(c) TORQUE the nuts (2) to between 6.19 and 5.61 m.daN (45.65 and 41.37 lbf.ft )
. (d) Make sure that the hose (8) is not twisted.
(e) Put the bonding straps (4) in position and install the washer (6) and the nut (5). Do the bonding (Ref. AMM TASK 20-28-00-912-802).
(f) Tighten the nut (5).
(2) Connect the waste-water drain connection as follows:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Put the drain tube (10) in position and install the clamp (9).
(c) Tighten the clamp (9).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Close the sanitary-cabinet access door (1).
F. Installation of the Water Connections
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Put the potable water tube (3) and the potable water hose (8) in position and connect the nuts (2) to the fittings (7).
(c) TORQUE all the nuts to between 5.9 and 5.4 m.daN (43.51 and 39.82 lbf.ft )
.
(d) Make sure that the potable water hose (8) is not twisted.
(e) Put the bonding straps (4) in position and install the washer (6) and the nut (5) (Ref. AMM TASK 20-28-00-912-802).
(2) Connect the waste-water drain connection:
(a) When you connect/install the components, refer to the match marks made during the removal procedure.
(b) Remove the PLUG-BLANKING from each disconnected line end.
(c) Put the drain tube (10) in position and install the clamp (9).
(d) Tighten the clamp (9).
(3) Close the sanitary-cabinet access door (1).
Subtask 25-43-42-420-067-H ** ON A/C NOT FOR ALL WARNING:
DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING:
MAKE SURE THAT THE EQUIPMENT YOU USE FOR THIS PROCEDURE IS CLEAN AND APPROVED FOR THE POTABLE WATER SYSTEM. IF NOT IT CAN CAUSE CONTAMINATION OF THE POTABLE WATER SYSTEM.
WARNING:
BEFORE YOU DO WORK ON THE POTABLE WATER SYSTEM, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION. (CONTAMINATION FROM TOILET WASTE IS DANGEROUS TO HEALTH).
(1) Connect the potable water connections: (a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Put the potable water tube (3) and the potable water hose (8) in position and connect the nuts (2) to the fittings (7).
(c) TORQUE all the nuts to between 5.9 and 5.4 m.daN (43.51 and 39.82 lbf.ft )
. (d) Make sure that the potable water hose (8) is not twisted.
(e) Put the bonding straps (4) in position and install the washer (6) and the nut (5) (Ref. AMM TASK 20-28-00-912-802).
(2) Connect the waste-water drain connection:
(a) When you connect/install the components, refer to the match marks made during the removal procedure.
(b) Remove the PLUG-BLANKING from each disconnected line end.
(c) Put the drain tube (10) in position and install the clamp (9).
(d) Tighten the clamp (9).
(3) Close the sanitary-cabinet access door (1).
F. Installation of the Water Connections
(2) Connect the potable water connections as follows:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Put the potable water tube (2) and the potable water hose (8) in position and connect the nuts (1) to the fittings (7).
(c) TORQUE the nuts (1) to between 5.9 and 5.4 m.daN (43.51 and 39.82 lbf.ft )
.
(d) Make sure that the potable water hose (8) is not twisted.
(e) Put the bonding straps (4) in position and install the washer (6) and the nut (5) (Ref. AMM TASK 20-28-00-912-802). Do the bonding.
(f) Tighten the nut (5).
(3) Connect the waste-water drain connection as follows:
(a) When you connect/install the components, refer to the match marks made during the removal procedure.
(b) Remove the PLUG-BLANKING from each disconnected line end.
(c) Put the sleeve (10) and the clamps (9) in position on the drain tube (11).
(d) Tighten the clamps (9).
(e) Make sure that the end of the sleeve (10) is aligned with the painted mark on the drain tube (11).
(4) If necessary, put the insulation (3) in its correct position.
(5) Close the sanitary-cabinet access door .
Subtask 25-43-42-420-066-A ** ON A/C NOT FOR ALL WARNING:
DO NOT DO WORK ON THE TOILET WASTE SYSTEM AND THE POTABLE WATER SYSTEM AT THE SAME TIME. THIS WILL PREVENT CONTAMINATION OF THE POTABLE WATER SYSTEM. SUCH CONTAMINATION CAN BE DANGEROUS TO HEALTH.
WARNING:
MAKE SURE THAT THE EQUIPMENT YOU USE FOR THIS PROCEDURE IS CLEAN AND APPROVED FOR THE POTABLE WATER SYSTEM. IF NOT IT CAN CAUSE CONTAMINATION OF THE POTABLE WATER SYSTEM.
WARNING:
BEFORE YOU DO WORK ON THE POTABLE WATER SYSTEM, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION. (CONTAMINATION FROM TOILET WASTE IS DANGEROUS TO HEALTH).
(1) Open the sanitary-cabinet access door. (2) Connect the potable water connections as follows:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Put the potable water tube (2) and the potable water hose (8) in position and connect the nuts (1) to the fittings (7).
(c) TORQUE the nuts (1) to between 5.9 and 5.4 m.daN (43.51 and 39.82 lbf.ft )
. (d) Make sure that the potable water hose (8) is not twisted.
(e) Put the bonding straps (4) in position and install the washer (6) and the nut (5) (Ref. AMM TASK 20-28-00-912-802). Do the bonding.
(f) Tighten the nut (5).
(3) Connect the waste-water drain connection as follows:
(a) When you connect/install the components, refer to the match marks made during the removal procedure.
(b) Remove the PLUG-BLANKING from each disconnected line end.
(c) Put the sleeve (10) and the clamps (9) in position on the drain tube (11).
(d) Tighten the clamps (9).
(e) Make sure that the end of the sleeve (10) is aligned with the painted mark on the drain tube (11).
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
(f) Apply Silicone Adhesive Sealant-General Purpose One part legacy (Material No.06CMD9) to the mating surface of the sleeve (10). (4) If necessary, put the insulation (3) in its correct position.
(5) Close the sanitary-cabinet access door .
G. Installation of the Air Connections
(1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Connect the air-extraction hose as follows:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Make sure that the sleeve (1) and the tube assembly (5) are clean and in good condition.
(c) Put the sleeve (1) and the clamp (2) in position on the tube assembly (5).
(d) Tighten the clamp (2).
(e) If removed, put the tube (4) and the clamp (3) in position on the tube assembly (5).
(f) Tighten the clamp (3).
(3) Connect the ventilation hoses (13) and (16) as follows:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Put the clamp (15) in position on the tube assembly (14) and connect the ventilation hose (16).
(c) Tighten the clamp (15).
(d) Put the clamp (10) in position on the ventilation tube (9) and connect the ventilation hose (13).
(e) Tighten the clamp (10).
(f) Put the clamps (6) in position on the ventilation hose (13).
(g) Install the spacers (7) and (8), washers (12) and screws (11).
(h) Tighten the screws (11).
Subtask 25-43-42-420-065-A ** ON A/C NOT FOR ALL (1) Make sure that the parts retained from the removed component are clean and in the correct condition.
(2) Connect the air-extraction hose as follows:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Make sure that the sleeve (1) and the tube assembly (5) are clean and in good condition.
(c) Put the sleeve (1) and the clamp (2) in position on the tube assembly (5).
(d) Tighten the clamp (2).
(e) If removed, put the tube (4) and the clamp (3) in position on the tube assembly (5).
(f) Tighten the clamp (3).
(3) Connect the ventilation hoses (13) and (16) as follows:
(a) Remove the PLUG-BLANKING from each disconnected line end.
(b) Put the clamp (15) in position on the tube assembly (14) and connect the ventilation hose (16).
(c) Tighten the clamp (15).
(d) Put the clamp (10) in position on the ventilation tube (9) and connect the ventilation hose (13).
(e) Tighten the clamp (10).
(f) Put the clamps (6) in position on the ventilation hose (13).
(g) Install the spacers (7) and (8), washers (12) and screws (11).
(h) Tighten the screws (11).
H. Installation of the Electrical Connections
(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) If the cable assembly (9) is removed, install it as follows:
(a) Remove the temporary attachment from the cable assembly (9).
(b) Put the cable assembly (9) in position on the mounts (11) and install new cable ties (10).
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the cable assembly (9) to the flush switch (2).
(6) Open the sanitary-cabinet access door (3).
(7) Put the bracket (5) in position and install the washers (8) and the screws (6).
(8) Tighten the screws (6).
(9) Connect the electrical connector (4).
(10) If the cable ties (13) are removed, attach the cable assembly (14) to the cable assembly (7) with new cable ties (13).
(11) Connect the cable assemblies (7) and (14) to the mounts (15) with new cable ties (12).
(12) On the lavatory ceiling, connect electrical connector 7216VC-A (16).
(13) Close the sanitary-cabinet access door (3).
Subtask 25-43-42-410-072-A ** ON A/C NOT FOR ALL (1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) If the cable assembly (9) is removed, install it as follows:
(a) Remove the temporary attachment from the cable assembly (9).
(b) Put the cable assembly (9) in position on the mounts (11) and install new cable ties (10).
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Connect the cable assembly (9) to the flush switch (2).
(6) Open the sanitary-cabinet access door (3).
(7) Put the bracket (5) in position and install the washers (8) and the screws (6).
(8) Tighten the screws (6).
(9) Connect the electrical connector (4).
(10) If the cable ties (13) are removed, attach the cable assembly (14) to the cable assembly (7) with new cable ties (13).
(11) Connect the cable assemblies (7) and (14) to the mounts (15) with new cable ties (12).
(12) On the lavatory ceiling, connect electrical connector 7216VC-A (16).
(13) Close the sanitary-cabinet access door (3).
I. Install the Miscellaneous Lavatory Equipment
(1) Install the toilet assembly (Ref. AMM TASK 38-31-41-400-001).
(2) Do not install the toilet shroud at this time.
(3) Install emergency oxygen container 34WR (Ref. AMM TASK 35-21-41-400-001).
(4) Install the lavatory door (Ref. AMM TASK 25-45-19-400-001).
Subtask 25-43-42-865-052-A ** ON A/C NOT FOR ALL (1) Install the toilet assembly (Ref. AMM TASK 38-31-41-400-001).
(2) Do not install the toilet shroud at this time.
(3) Install emergency oxygen container 34WR (Ref. AMM TASK 35-21-41-400-001).
(4) Install the lavatory door (Ref. AMM TASK 25-45-19-400-001).
J. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-43-42-710-056-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR COND/SDCU/CHAN1 | 11WQ | C06 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | LIGHTING/EMER LT/CABIN | 79WL | H07 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R AFT | 168RH | M14 |
| 121VU | COM NAV/CIDS/DEU A NORM/L AFT | 167RH | M13 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU A NORM/R AFT | 168RH | M12 |
| 121VU | COM NAV/CIDS/DEU A NORM/L AFT | 167RH | M11 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/SDCU/CHAN2 | 12WQ | T18 |
| ** ON A/C NOT FOR ALL | |||
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | POT/WASTE WIP-HEATER-CTL | 2DW | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | LIGHT-LAV | 1LQ | J01 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | POT WIP-HEATER-CTL | 2DW | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAVATORY AFT-OCCUPIED | 11WJ | B04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAV AFT-HOT WATER-E | 9MB | B03 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAV SHAVER SOCKET | 1MT | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAV AFT-HOT WATER-E/L | 9MB | B03 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | LAV AFT-HOT WATER-L | 9MB | C04 |
K. Operational Test of the Lavatory Systems
(1) Do the operational test of these water/waste systems:
(3) Do the operational test of the individual-air outlet system (Ref. AMM TASK 21-21-00-710-002).
(4) Do the operational test of these electrical systems:
Subtask 25-43-42-710-056-B ** ON A/C NOT FOR ALL (1) Do the operational test of these water/waste systems:
- The potable water system (Ref. AMM TASK 38-12-00-710-002)
- The waste/water drain system (Ref. AMM TASK 38-32-00-710-002)
- The toilet unit (Ref. AMM TASK 38-31-00-710-009).
NOTE: Leaks are not permitted.
(2) Do the functional test of the air-extraction point (Ref. AMM TASK 21-23-00-720-002). (3) Do the operational test of the individual-air outlet system (Ref. AMM TASK 21-21-00-710-002).
(4) Do the operational test of these electrical systems:
- The lavatory water heater (Ref. AMM TASK 38-12-00-710-004)
- The passenger address (PA) system (Ref. AMM TASK 23-73-00-710-005)
- The passenger emergency-oxygen system (Ref. AMM TASK 35-23-00-710-001)
- The lavatory lighting (Ref. AMM TASK 33-24-00-710-001)
- The lavatory emergency lighting (Ref. AMM TASK 33-51-00-710-007)
- The lavatory lighted signs (Ref. AMM TASK 33-26-00-710-001)
- The lavatory smoke detection (Ref. AMM TASK 26-17-00-710-001)
- The passenger call system (Ref. AMM TASK 23-73-00-710-007).
K. Operational Test of the Lavatory Systems
(1) Do an operational test of these water/waste systems:
(3) Do the operational test of the individual air outlet system (Ref. AMM TASK 21-21-00-710-002).
(4) Do an operational test of these electrical systems:
Subtask 25-43-42-420-064-A ** ON A/C NOT FOR ALL (1) Do an operational test of these water/waste systems:
- The potable water system (Ref. AMM TASK 38-12-00-710-002)
- The waste/water drain system (Ref. AMM TASK 38-32-00-710-002)
- The toilet unit (Ref. AMM TASK 38-31-00-710-009).
NOTE: Leaks are not permitted.
(2) Do a functional test of an air extraction point (Ref. AMM TASK 21-23-00-720-002). (3) Do the operational test of the individual air outlet system (Ref. AMM TASK 21-21-00-710-002).
(4) Do an operational test of these electrical systems:
- The lavatory water heater (Ref. AMM TASK 38-12-00-710-004)
- The passenger address system (Ref. AMM TASK 23-73-00-710-022)
- The passenger emergency-oxygen system (Ref. AMM TASK 35-23-00-710-001)
- The lavatory lighting (Ref. AMM TASK 33-24-00-710-001)
- The lavatory emergency lighting (Ref. AMM TASK 33-51-00-710-007)
- The lavatory lighted signs (Ref. AMM TASK 33-26-00-710-001)
- The lavatory smoke detection (Ref. AMM TASK 26-17-00-710-001)
- The passenger call system (Ref. AMM TASK 23-73-00-710-024).
L. Installation of the Pelmets
(1) Put the side pelmet (3) in position and install the washers (4) and the screws (5).
(2) Put the pelmet assembly (1) in position and install the screws (2).
Subtask 25-43-42-420-064-H ** ON A/C NOT FOR ALL (1) Put the side pelmet (3) in position and install the washers (4) and the screws (5).
(2) Put the pelmet assembly (1) in position and install the screws (2).
L. Installation of the Pelmet
(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Put the pelmet (10) in position and install the washer (12) and the screws (11).
(3) Make sure that the washer (12) is in the correct position on the pelmet (10) before you tighten the screws (11).
(4) Tighten the screws (11).
5. Close-up(1) When you connect/install the components, refer to the match marks made during the removal procedure.
(2) Put the pelmet (10) in position and install the washer (12) and the screws (11).
(3) Make sure that the washer (12) is in the correct position on the pelmet (10) before you tighten the screws (11).
(4) Tighten the screws (11).
Subtask 25-43-42-410-073-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Install the toilet shroud (Ref. AMM TASK 25-45-22-400-001).
(2) Install lower sidewall panel 252AX (Ref. AMM TASK 25-23-44-400-001).
(3) Install upper sidewall panel 252BX (Ref. AMM TASK 25-23-43-400-001).
(4) Install cove light panel 252CX (Ref. AMM TASK 25-23-48-400-001).
(5) Install ceiling panel 251JC (Ref. AMM TASK 25-23-41-400-001).
(6) Install ceiling panel 262BC in the aft utility area (Ref. AMM TASK 25-23-42-400-002).
Subtask 25-43-42-410-073-D ** ON A/C NOT FOR ALL (1) Install the toilet shroud (Ref. AMM TASK 25-45-22-400-001).
(2) Install lower sidewall panel 252AX (Ref. AMM TASK 25-23-44-400-001).
(3) Install upper sidewall panel 252BX (Ref. AMM TASK 25-23-43-400-001).
(4) Install cove light panel 252CX (Ref. AMM TASK 25-23-48-400-001).
(5) Install ceiling panel 251JC (Ref. AMM TASK 25-23-41-400-001).
(6) Install ceiling panel 262BC in the aft utility area (Ref. AMM TASK 25-23-42-400-002).
A. Close Access
(1) Install the toilet shroud (Ref. AMM TASK 25-45-22-400-001).
(2) Install the applicable lower sidewall panel (Ref. AMM TASK 25-23-44-400-001).
(3) Install the applicable upper sidewall panel (Ref. AMM TASK 25-23-43-400-001).
(4) Install the applicable cove light panel (Ref. AMM TASK 25-23-48-400-001).
(5) Install the applicable ceiling panel (Ref. AMM TASK 25-23-41-400-001).
(6) Install the applicable ceiling panel and the trim panel in the aft utility area (Ref. AMM TASK 25-23-42-400-002).
Subtask 25-43-42-410-073-U ** ON A/C NOT FOR ALL (1) Install the toilet shroud (Ref. AMM TASK 25-45-22-400-001).
(2) Install the applicable lower sidewall panel (Ref. AMM TASK 25-23-44-400-001).
(3) Install the applicable upper sidewall panel (Ref. AMM TASK 25-23-43-400-001).
(4) Install the applicable cove light panel (Ref. AMM TASK 25-23-48-400-001).
(5) Install the applicable ceiling panel (Ref. AMM TASK 25-23-41-400-001).
(6) Install the applicable ceiling panel and the trim panel in the aft utility area (Ref. AMM TASK 25-23-42-400-002).
A. Close Access
(1) Install the toilet shroud (Ref. AMM TASK 25-45-22-400-001).
(2) Install the lower sidewall panel 252AX (Ref. AMM TASK 25-23-44-400-001).
(3) Install the upper sidewall panel 252BX (Ref. AMM TASK 25-23-43-400-001).
(4) Install the ceiling panel 251JC (Ref. AMM TASK 25-23-41-400-001).
(5) Install the ceiling panel 262BC in the aft utility area (Ref. AMM TASK 25-23-42-400-002).
Subtask 25-43-42-410-074-M ** ON A/C NOT FOR ALL (1) Install the toilet shroud (Ref. AMM TASK 25-45-22-400-001).
(2) Install the lower sidewall panel 252AX (Ref. AMM TASK 25-23-44-400-001).
(3) Install the upper sidewall panel 252BX (Ref. AMM TASK 25-23-43-400-001).
(4) Install the ceiling panel 251JC (Ref. AMM TASK 25-23-41-400-001).
(5) Install the ceiling panel 262BC in the aft utility area (Ref. AMM TASK 25-23-42-400-002).
B. Close Access
(1) Install the door frame lining-panels 262TW 262UW 262VW (Ref. AMM TASK 25-23-45-400-005).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
Subtask 25-43-42-410-074-AI ** ON A/C NOT FOR ALL (1) Install the door frame lining-panels 262TW 262UW 262VW (Ref. AMM TASK 25-23-45-400-005).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
B. Close Access
(1) Install the door frame lining-panels 262TW 262UW 262VW (Ref. AMM TASK 25-23-45-400-005).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
(4) Install the passenger seat (Ref. AMM TASK 25-21-41-400-001).
(5) Install the curtain rail and the curtain (Ref. AMM TASK 25-26-41-400-003).
(6) Install the wall-mounted cabin-attendant seat (Ref. AMM TASK 25-22-41-400-001).
Subtask 25-43-42-410-074-AL ** ON A/C NOT FOR ALL (1) Install the door frame lining-panels 262TW 262UW 262VW (Ref. AMM TASK 25-23-45-400-005).
(2) Make sure that the potable water system is drained (Ref. AMM TASK 12-24-38-680-001).
(3) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
(4) Install the passenger seat (Ref. AMM TASK 25-21-41-400-001).
(5) Install the curtain rail and the curtain (Ref. AMM TASK 25-26-41-400-003).
(6) Install the wall-mounted cabin-attendant seat (Ref. AMM TASK 25-22-41-400-001).
B. Close Access
(1) Install the door frame lining-panels (Ref. AMM TASK 25-23-45-400-005).
(2) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
(3) Install the passenger seat(s) adjacent to the lavatory (Ref. AMM TASK 25-21-41-400-001).
(4) Install the curtain rail(s) and the curtain(s) (Ref. AMM TASK 25-26-41-400-003).
(5) Install the cabin attendant swivel-seat (Ref. AMM TASK 25-22-43-400-001).
(6) Install the wall-mounted CAS (Ref. AMM TASK 25-22-41-400-001).
(7) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-43-42-410-074-BJ ** ON A/C NOT FOR ALL (1) Install the door frame lining-panels (Ref. AMM TASK 25-23-45-400-005).
(2) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
(3) Install the passenger seat(s) adjacent to the lavatory (Ref. AMM TASK 25-21-41-400-001).
(4) Install the curtain rail(s) and the curtain(s) (Ref. AMM TASK 25-26-41-400-003).
(5) Install the cabin attendant swivel-seat (Ref. AMM TASK 25-22-43-400-001).
(6) Install the wall-mounted CAS (Ref. AMM TASK 25-22-41-400-001).
(7) Make sure that the work area is clean and clear of tools and other items.
B. Close Access
(1) Install the door frame lining-panels (Ref. AMM TASK 25-23-45-400-005).
(2) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
(3) Install the curtain rail(s) and the curtain(s) (Ref. AMM TASK 25-26-41-400-003).
(4) Install the stowage forward of the lavatory E (Ref. AMM TASK 25-27-44-400-007).
(5) Install the cabin attendant swivel-seat (Ref. AMM TASK 25-22-43-400-001).
Subtask 25-43-42-410-074-BN ** ON A/C NOT FOR ALL (1) Install the door frame lining-panels (Ref. AMM TASK 25-23-45-400-005).
(2) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
(3) Install the curtain rail(s) and the curtain(s) (Ref. AMM TASK 25-26-41-400-003).
(4) Install the stowage forward of the lavatory E (Ref. AMM TASK 25-27-44-400-007).
(5) Install the cabin attendant swivel-seat (Ref. AMM TASK 25-22-43-400-001).
B. Close Access
(1) Install the door frame lining-panels (Ref. AMM TASK 25-23-45-400-005).
(2) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
(3) Install the doghouse (Ref. AMM TASK 25-27-46-400-001).
(4) Install the passenger seat adjacent to the lavatory (Ref. AMM TASK 25-21-41-400-001).
(5) Install the curtain rail(s) and the curtain(s) (Ref. AMM TASK 25-26-41-400-003).
(6) Install the wall-mounted cabin-attendant seat (Ref. AMM TASK 25-22-41-400-001).
Subtask 25-43-42-410-075-AH ** ON A/C NOT FOR ALL (1) Install the door frame lining-panels (Ref. AMM TASK 25-23-45-400-005).
(2) Install the toilet drain line (Ref. AMM TASK 38-30-00-410-002).
(3) Install the doghouse (Ref. AMM TASK 25-27-46-400-001).
(4) Install the passenger seat adjacent to the lavatory (Ref. AMM TASK 25-21-41-400-001).
(5) Install the curtain rail(s) and the curtain(s) (Ref. AMM TASK 25-26-41-400-003).
(6) Install the wall-mounted cabin-attendant seat (Ref. AMM TASK 25-22-41-400-001).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the warning notice(s).
Subtask 25-43-42-410-075-FP ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the warning notice(s).
C. Close Access
(1) In the aft cargo compartment:
(a) Install partition 162DW (Ref. AMM TASK 25-55-12-400-001).
(b) Install sidewall panel 162CW (Ref. AMM TASK 25-55-12-400-003).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Remove the WARNING NOTICE(S).
Subtask 25-43-42-862-051-A ** ON A/C NOT FOR ALL (1) In the aft cargo compartment:
(a) Install partition 162DW (Ref. AMM TASK 25-55-12-400-001).
(b) Install sidewall panel 162CW (Ref. AMM TASK 25-55-12-400-003).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Remove the WARNING NOTICE(S).
Floor Pan Assembly