W DOC AIRBUS | AMM A320F

De-energize the Ground Service Network Supplied from the External Power


TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
121AL
3. Job Set-up
Subtask 24-42-00-869-058-A
A. Not Applicable
4. Procedure
Subtask 24-42-00-862-054-A
A. De-energize the ground service network
   (1) On the front circuit breaker panel 2000VU which is in the middle of the cabin ceiling at the level of the FWD passenger/crew door, put the MAINT BUS switch in the OFF position.
   (2) On the panel 108VU, the EXT PWR/NOT IN USE indicator light comes on. This shows that the ground service network is de-energized correctly.
5. Close-up
Subtask 24-42-00-080-050-A
A. Obey the instructions given with the ground power and stop the ground power unit:
  • on the panel 35VU, the legends of all the pushbutton switches are off,
  • on the panel 108VU, all the lights are off.
Subtask 24-42-00-020-050-A
B. Put the aircraft back to its initial configuration.
WARNING: DE-ENERGIZE THE ELECTRICAL POWER SUPPLY BEFORE YOU DISCONNECT THE CONNECTOR OF THE GROUND POWER UNIT. IF NOT DANGEROUS ARCING CAN OCCUR.
   (1) Disconnect the connector of the ground power unit and release the snap hook from the support.
   (2) Disconnect all the ground (earth) cables, if necessary.
Subtask 24-42-00-410-052-A
C. Close Access
   (1) Close the access door 121AL.
[Rev.10 from 2021] 2026.04.01 03:47:56 UTC