Installation of the Non-Textile Floor Covering (NTF)


TASK 25-28-42-400-001-A
Installation of the Non-Textile Floor Covering (NTF)


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
HOT AIR BLOWER MAX OPERATING 370 DEG C (700 DEG F)
No specific
AR
ROLLER - RUBBER
No specific
AR
SCRAPER - NON METALLIC
No specific
AR
SCRAPER - TRIANGLE SHAPE
No specific
AR
SPATULA - NON METALLIC
No specific
AR
VACUUM CLEANER
No specific
Torque wrench: range to between 27.5 and 22.5 lbf.in (0.31 and 0.25 m.daN ) T
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.05JBB9)
Contact Adhesive-Rubber & Plastic Bonding Nitrile base -
(Material No.05NCA2)
Adhesive Transfer Tape-Non Textile Floor - -
(Material No.05RDA1)
Adhesive Film Tape-Masking - -
(Material No.06BQD1)
Silicone Sealant-Non Textile Floor Jointing One part -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
(Material No.06PBG1)
Adhesion Promoter-For Silicone Sealant - -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14RCB1)
Cord-Welding PVC -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
5
LAMINATE
AIPC 25-28-09-20-015
5
LAMINATE
AIPC 25-28-09-20-020
5
LAMINATE
AIPC 25-28-09-22-020
5
LAMINATE
AIPC 25-28-09-22-030
5
LAMINATE
AIPC 25-28-09-22-050
5
LAMINATE
AIPC 25-28-09-23-030
5
LAMINATE
AIPC 25-28-09-23-035
5
LAMINATE
AIPC 25-28-09-24-020
5
LAMINATE
AIPC 25-28-09-25-030
5
LAMINATE
AIPC 25-28-09-26-020
5
LAMINATE
AIPC 25-28-09-28-020
5
LAMINATE
AIPC 25-28-09-36-020
5
LAMINATE
AIPC 25-28-09-40-020
5
LAMINATE
AIPC 25-28-09-42-030
5
LAMINATE
AIPC 25-28-09-43-020
5
LAMINATE
AIPC 25-28-09-44-020
5
LAMINATE
AIPC 25-28-09-78-020
 D. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-28-43-000-001-A
Removal of the Moisture Barrier Foil (MYLAR)
TASK 25-28-43-400-001-A
Installation of the Moisture Barrier Foil (MYLAR)
TASK 33-51-00-00
CABIN EMERGENCY LIGHTING - DESCRIPTION AND OPERATION
3. Job Set-up
Subtask 25-28-42-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized (Ref. AMM TASK 24-41-00-861-002)
   (2) Make sure that the moisture barrier foil is installed (Ref. AMM TASK 25-28-43-400-001).
   (3) Make sure that the NTF area is free of equipment and furnishings.
   (4) Make sure that the emergency-escape path marking is removed as necessary. Refer to (Ref. AMM D/O 33-51-00-00) to know which emergency lights are installed.
4. Procedure
Subtask 25-28-42-160-053-A
A. Preparation for Installation
   (1) Make sure that the work area is free from dust and other particles. If necessary use a VACUUM CLEANER.
   (2) Clean the the component interface and the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) . Use a SCRAPER - NON METALLIC if necessary.
CAUTION: DO NOT CAUSE DAMAGE TO THE SURFACES. THE COMPONENTS ARE MADE OF CARBONFIBER REINFORCED PLASTIC.
   (3) Do a detailed visual inspection of the moisture barrier foil. Make sure that the foil has no damage, scratches or holes. If necessary, replace the damaged moisture barrier foil (Ref. AMM TASK 25-28-43-000-001) and (Ref. AMM TASK 25-28-43-400-001).
   (4) Make sure that the lighting in the work area is bright.
   (5) Make sure that the ambient temperature is between 18 deg.C (64.40 deg.F) and 30 deg.C (86.00 deg.F).
   (6) Make sure that the ambient humidity is not more than 75 %.
   (7) Monitor the ambient temperature and the ambient humidity with applicable instruments.
Subtask 25-28-42-560-052-A
B. Installation of the NTF Top Layer on the Laminate (e.g. Glass-Fiber-Reinforced-Plastic) (If Installed)
NOTE: This procedure is only applicable for conventional NTF which has two parts.
   (1) Do a visual inspection of the component interfaces and the adjacent area.
   (2) Clean the top surface of new AIPC 25-28-09-20-020 LAMINATE (5) or AIPC 25-28-09-20-015 LAMINATE (5) or AIPC 25-28-09-22-020 LAMINATE (5) or AIPC 25-28-09-23-035 LAMINATE (5) or AIPC 25-28-09-22-030 LAMINATE (5) or AIPC 25-28-09-22-050 LAMINATE (5) or AIPC 25-28-09-23-030 LAMINATE (5) or AIPC 25-28-09-24-020 LAMINATE (5) or AIPC 25-28-09-25-030 LAMINATE (5) or AIPC 25-28-09-26-020 LAMINATE (5) or AIPC 25-28-09-28-020 LAMINATE (5) or AIPC 25-28-09-36-020 LAMINATE (5) or AIPC 25-28-09-40-020 LAMINATE (5) or AIPC 25-28-09-42-030 LAMINATE (5) or AIPC 25-28-09-43-020 LAMINATE (5) or AIPC 25-28-09-44-020 LAMINATE (5) or AIPC 25-28-09-78-020 LAMINATE (5) with a Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (3) Unwind the Adhesive Transfer Tape-Non Textile Floor - - (Material No.05NCA2) (2).
   (4) Align the self-adhesive layer (2) together with the laminate (5).
   (5) Install the NTF (1) together with a Textile-Lint free Cotton - (Material No.14SBA1) with a light pressure of your hand.
   (6) Make sure that you install the NTF (1) from the middle to the edges to prevent wrinkles and air pockets.
   (7) Use the ROLLER - RUBBER and push down the self-adhesive layer (2).
   (8) Cut the self-adhesive layer (2) to the same dimension of the laminate (5).
   (9) Clean the bottom surface of the NTF (1) with a Non Aqueous Cleaner-General - - (Material No.08BAA9) .
   (10) If necessary, apply Contact Adhesive-Rubber & Plastic Bonding Nitrile base - (Material No.05JBB9) to the lower side of the NTF (1) together with a Textile-Lint free Cotton - (Material No.14SBA1) .
   (11) Remove the protective paper from the self-adhesive layer (2).
   (12) Align the NTF (1) together with the laminate (5).
   (13) Use the ROLLER - RUBBER and install the NTF (1) on the floor panels.
Subtask 25-28-42-560-053-A
C. Installation of the Self-Adhesive Film on the NTF (If Installed)
   (1) Clean the component interface and/or the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
   (2) Do a visual inspection of the component interface and/or the adjacent area.
   (3) Make sure that the NTF (3) has the correct size. If necessary cut the NTF (3) to the required size.
   (4) Apply Contact Adhesive-Rubber & Plastic Bonding Nitrile base - (Material No.05JBB9) to the bottom surface of the NTF (3) with a Textile-Lint free Cotton - (Material No.14SBA1) .
   (5) Unwind the Adhesive Transfer Tape-Non Textile Floor - - (Material No.05NCA2) (7).
   (6) Align the self-adhesive film (7) with the NTF (3). Install it with a Textile-Lint free Cotton - (Material No.14SBA1) and a light pressure of your hand.
   (7) Work from the middle to the edges to prevent wrinkles and air pockets.
   (8) Push the self-adhesive film (7) down with a ROLLER - RUBBER.
   (9) Cut the self-adhesive film (7) to the same size as the NTF (3).
Subtask 25-28-42-420-055-A
D. Installation of the NTF on the Floor Panels
   (1) Make sure that the component is free from dust and particles. If necessary, use a VACUUM CLEANER.
   (2) Install the NTF (3):
     (a) Clean the component interface and/or the adjacent area with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
     (b) Do a visual inspection of the component interface and/or the adjacent area.
     (c) Make sure that the moisture barrier foil and the NTF (3) have the same size in the entrance area.
     (d) Carefully put the NTF (3) in position and make the cutouts for the furnishing location points as necessary.
     (e) Make sure that the clearance between the NTF (3) and the furnishing (toilet, galley etc.) is 5.0 +2.0 mm or -2.0 mm (0.1969 +0.0787 in. or -0.0787 in.).
     (f) Make sure that the clearance "X" between to pieces of the NTF is:
  • for welding: 1.5 +1.0 mm or -1.5 mm (0.0591 +0.0394 in. or -0.0591 in.)
  • for sealing: 3.0 +1.0 mm or -0.5 mm (0.1181 +0.0394 in. or -0.0197 in.)
     (g) Remove the protective paper from the self-adhesive film (7) on the NTF (3).
     (h) Install the NTF (3) on the moisture barrier foil with a Textile-Lint free Cotton - (Material No.14SBA1) and a light pressure of your hand. Work from the middle of the edges to prevent wrinkles and air pockets.
     (i) Push the NTF (3) down with a ROLLER - RUBBER. Work from the middle to the sides, backwards and forwards and around the edges for a better bond.
NOTE: For the installation of NTF type AerFusion Eco it is not allowed to weld the clearance between two pieces of the NTF. It is approved to seal the NTF with Silicone Sealant-Non Textile Floor Jointing One part - (Material No.06BQD1) .
   (3) Weld the clearance between two pieces of the NTF (3):
NOTE: This procedure is only applicable for PUR or PVC NTF. It is not applicable for silicone NTF.
     (a) Chamfer the edges of the NTF at the joints with a SCRAPER - TRIANGLE SHAPE.
CAUTION: DO NOT CAUSE DAMAGE TO THE MOISTURE BARRIER FOIL (MYLAR).
     (b) Make a groove in the shape of a "V" with an angle of approximately 30 deg. on the NTF edges.
NOTE: A stainless steel or aluminum flexible ruler helps to make a straight groove.
     (c) Make sure that the groove is not deeper than 2/3 of the NTF thickness.
     (d) Remove loose particles with a VACUUM CLEANER.
WARNING: WHEN YOU PUT THE HOT AIR BLOWER DOWN, MAKE SURE THAT YOU PUT IT ON A HEAT-RESISTANT SURFACE. THE HOT PARTS OF THE BLOWER CAN CAUSE A FIRE.
WARNING: MAKE SURE THAT THERE IS A GOOD FLOW OF AIR THROUGH THE WORK AREA. FUMES FROM WELDING ARE POISONOUS.
WARNING: DO NOT TOUCH HOT PARTS WITHOUT APPLICABLE GLOVES. HOT PARTS CAN CAUSE AN INJURY.
     (e) Obey the manufacturer's instructions when you use the hot air blower.
     (f) Set the working temperature on the HOT AIR BLOWER MAX OPERATING 370 DEG C (700 DEG F) between 160 deg.C (320.00 deg.F) and 200 deg.C (392.00 deg.F).
     (g) Cut the welding rod Cord-Welding PVC - (Material No.14RCB1) some centimeters / inches longer than the necessary length.
CAUTION: MAKE SURE THAT:
  • THE TEMPERATURE OF THE HOT AIR BLOWER IS NOT TOO HIGH
  • THE BLOWER DOES NOT MOVE TOO SLOWLY ALONG THE WELD.
HIGH TEMPERATURES OR SLOW MOVEMENT OF THE HOT AIR BLOWER CAN BURN THE MATERIAL.
     (h) Put the welding rod into the inlet of the speed welding nozzle.
     (i) Move the speed welding nozzle with light pressure and constant speed along the groove.
     (j) Make the welded joint smooth.
   (4) Apply sealant:
     (a) Make sure that the NTF surface is dry, dust and oil free. If necessary clean it with Non Aqueous Cleaner-General - - (Material No.08BAA9) and a Textile-Lint free Cotton - (Material No.14SBA1) .
     (b) Install Adhesive Film Tape-Masking - - (Material No.05RDA1) around the edges and cutouts of the NTF, where the primer will be applied.
     (c) Apply primer:
NOTE: The primer is not necessary for sealant in clearances between silicone NTF.
     (d) Apply Adhesion Promoter-For Silicone Sealant - - (Material No.06PBG1) (4) with a Textile-Lint free Cotton - (Material No.14SBA1) :
  • Into all clearances between the NTF (3) and the furnishing (toilet, galley, etc)
  • Around all NTF contours
  • Around all cutouts.
     (e) Apply a bead of Silicone Sealant-Non Textile Floor Jointing One part - (Material No.06BQD1) (4) to:
  • All NTF contours.
  • All clearances between two pieces of NTF (3) which are not welded
  • All clearances between the NTF (3) and the furnishing (toilet, galley, etc)
  • All cutouts.
     (f) Remove the unwanted sealant with a SPATULA - NON METALLIC immediately.
     (g) Remove the masking tape.
NOTE: The curing time for the sealant, for 2 mm (0.0787 in.) to 3 mm (0.1181 in.) thickness, is 24 hours.
   (5) Install the joint strip (2):
     (a) Apply Silicone Sealant-Non Textile Floor Jointing One part - (Material No.06BQD1) into the clearance between the textile floor covering and the NTF (3).
     (b) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the thread of the screws (1).
     (c) Put the joint strip (2) in position and install the screws (1).
     (d) TORQUE the screws (1) to between 27.5 and 22.5 lbf.in (0.31 and 0.25 m.daN ) T.
   (6) Install the door sills (6):
     (a) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.
06LCG9) to the screws (5).
     (b) Install the door sills (6) with the screws (5).
     (c) Apply a bead of Silicone Sealant-Non Textile Floor Jointing One part - (Material No.06BQD1) (4) around the door sills (6).
NOTE: The curing time for the sealant, for 2 mm (0.0787 in.) to 3 mm (0.1181 in.) thickness, is 24 hours.
5. Close-up
Subtask 25-28-42-410-050-A
A. Close Access
   (1) Refer to chapter 25 for installation instructions for the equipment/furnishings that you removed during the removal procedure. Then install these items.
   (2) Install the emergency-escape path markings as necessary. Refer to (Ref. AMM D/O 33-51-00-00) to know which emergency lights are installed.
   (3) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-28-42-862-050-A
B. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001)