W DOC AIRBUS | AMM A320F

Installation of the Toilet Shroud and the Seat


TASK 25-45-22-400-001-A
Installation of the Toilet Shroud and the Seat


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Consumable Materials
REFERENCE
DESIGNATION
(Material No.11AAA2)
Disinfectant-Aircraft General - -
(Material No.11CAA1)
Disinfectant and cleaner-Aircraft interior - -
(Material No.14SBA1)
Textile-Lint free Cotton -
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 11-00-00-400-007-A
Installation of the ESSO (Scotchcal Labels)
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
3. Job Set-up
Subtask 25-45-22-860-050-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001).
4. Procedure
Subtask 25-45-22-210-050-A
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
WARNING: ALWAYS USE RUBBER GLOVES WHEN YOU DO WORK:
  • ON THE TOILET WASTE SYSTEM, OR
  • ON PARTS THAT HAVE CONTAMINATION FROM THE WASTE SYSTEM.
WHEN YOU COMPLETE THE WORK PROCEDURE, CLEAN YOUR HANDS WITH SOAP AND WATER. THIS WILL PREVENT INFECTION (TOILET WASTE IS DANGEROUS FOR HEALTH).
CAUTION: USE ONLY THE SPECIFIED MATERIALS AND OBEY THE INSTRUCTIONS FROM THE MATERIAL MANUFACTURERS. OTHER MATERIALS CAN CAUSE DAMAGE TO THE SURFACE PROTECTION OF THE COMPONENTS AND THE RELATED AREA.
     (a) Clean the areas with Disinfectant-Aircraft General - - (Material No.11AAA2) or Disinfectant and cleaner-Aircraft interior - - (Material No.11CAA1) and the Textile-Lint free Cotton - (Material No.14SBA1) .
   (2) Make sure that the parts retained from the removed component are clean and in the correct condition.
NOTE: Replace cadmium treated screws NAS1102-08-12 with corrosion-resistant steel screws MS24693C52.
   (3) Do an inspection of the component interfaces and the adjacent area.
Subtask 25-45-22-420-052-B
B. Installation of the Toilet Seat and the Seat Cover
   (1) Engage the seat cover (3) and the seat (4) and install the pivot fittings (7).
   (2) Put the seat (4) and the seat cover (3) in position on the shroud (1) and install the washers (5) and nuts (6).
Subtask 25-45-22-420-050-B
C. Installation of the Toilet Shroud for the Vacuum Toilet
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Put the toilet shroud (1) in position and install the screws (2).
NOTE: Make sure you install corrosion resistant steel screws MS24693C52.
   (3) Make sure that all of the placards of the retained/new components are in the correct position and in a good condition.
     (a) If necessary install new placards (Ref. AMM TASK 11-00-00-400-007) and (Ref. AMM D/O 11-32-25-00).
5. Close-up
Subtask 25-45-22-862-050-A
A. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:36:24 UTC