W DOC AIRBUS | AMM A320F

Functional Test of an Air Extraction Point


TASK 21-23-00-720-002-A
Functional Test of an Air Extraction Point


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 21-23-00-861-052-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 21-23-00-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VUAIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL5HUU21
122VUAIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY6HUU19
4. Procedure
Subtask 21-23-00-720-051-A
A. Functional Test of a Air Extraction Point
   (1) At the relevant air extraction point make sure that there is a good flow of air through the grid or grill.
5. Close-up
Subtask 21-23-00-862-052-A
A. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.03.31 23:01:20 UTC