W DOC AIRBUS | AMM A320F

De-energize the Aircraft Electrical Circuits Supplied from the APU


TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 31-60-00-860-002-A
EIS Stop Procedure
TASK 49-00-00-860-006-A
APU Shutdown by External Power
TASK 49-00-00-860-006-A-01
APU Shutdown by Batteries
TASK 49-00-00-860-009-A
APU Shutdown by External Power (131-9(A))
TASK 49-00-00-860-009-A-01
APU Shutdown by Batteries (131-9(A))
3. Job Set-up
Subtask 24-41-00-869-068-A
A. Aircraft Maintenance Configuration
   (1) On the panel 35VU, make sure that the APU GEN pushbutton switch is pushed (OFF legend is off).
4. Procedure
Subtask 24-41-00-862-052-A
A. De-energize the aircraft electrical circuits from the APU
   (1) On the ELEC panel 35VU, release the APU GEN pushbutton switch.
5. Close-up
Subtask 24-41-00-860-053-A
A. Put the aircraft back to its initial configuration.
   (1) Stop the APU:
   (2) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
   (3) Disconnect all the ground (earth) cables if necessary.
[Rev.10 from 2021] 2026.03.31 23:24:09 UTC