Draining of the Potable Water System (with Electrical Power)
TASK 12-24-38-680-001-A
Draining of the Potable Water System (with Electrical Power)
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 12-24-38-680-050-A ** ON A/C NOT FOR ALL
Subtask 12-24-38-680-051-B ** ON A/C NOT FOR ALL
Subtask 12-24-38-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 03:56:43 UTC
Draining of the Potable Water System (with Electrical Power)
1. Reason for the Job
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) |
| No specific | 1 | HOSE - DRAIN |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 133AL, 171AL | |
| 192NB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-31-38-660-001-A | Cold Weather Maintenance - Water/Waste |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 12-24-38-680-050-A ** ON A/C NOT FOR ALL
A. Draining of the Potable water System
Subtask 12-24-38-680-050-B ** ON A/C NOT FOR ALL CAUTION:
MAKE SURE THAT THE DRAIN VALVES STAY IN THE DRAIN POSITION AFTER YOU DRAIN THE POTABLE WATER SYSTEM IF:
(1) You must drain the water system when the outside air temperature is as shown in the cold weather maintenance - procedure (Ref. AMM TASK 12-31-38-660-001). - THE BLEED AIR SYSTEM IS OFF, AND
- THE OUTSIDE AIR TEMPERATURE IS BELOW 0 DEG.C (32 DEG.F).
A. Draining of the Potable water System
Subtask 12-24-38-861-051-A Subtask 12-24-38-865-052-A CAUTION:
MAKE SURE THAT THE DRAIN VALVES STAY IN THE DRAIN POSITION AFTER YOU DRAIN THE POTABLE WATER SYSTEM IF:
(1) You must drain the water system when the outside air temperature is as shown in the cold weather maintenance - procedure (Ref. AMM TASK 12-31-38-660-001). - THE BLEED AIR SYSTEM IS OFF, AND
- THE OUTSIDE AIR TEMPERATURE IS BELOW 0 DEG.C (32 DEG.F).
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 12-24-38-941-052-A ** ON A/C NOT FOR ALL Subtask 12-24-38-941-052-B ** ON A/C NOT FOR ALL Subtask 12-24-38-860-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WATER SYSTEM-QANT-IND | 1MA | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-QUANT-IND | 1MA | B06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-DRAIN | 1MP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYS-DRAIN | 1MP | B05 |
E. Aircraft Maintenance Configuration
(1) Make sure that the potable water shutoff-valve in each lavatory is open.
(2) Make sure that the potable water shutoff-valve in each wet galley is open.
(3) Make sure that the potable water-mixing timer control-knob in each lavatory is set to the center position (between the RED and BLUE band).
(4) Make sure that the potable water shutoff-valve in each galley is open.
Subtask 12-24-38-860-050-B ** ON A/C NOT FOR ALL (1) Make sure that the potable water shutoff-valve in each lavatory is open.
(2) Make sure that the potable water shutoff-valve in each wet galley is open.
(3) Make sure that the potable water-mixing timer control-knob in each lavatory is set to the center position (between the RED and BLUE band).
(4) Make sure that the potable water shutoff-valve in each galley is open.
E. Aircraft Maintenance Configuration
(1) Make sure that the potable water shutoff-valve in each lavatory is open.
(2) Make sure that the potable water shutoff-valve in each wet galley is open.
(3) Make sure that the potable water shutoff-valve in each galley is open.
Subtask 12-24-38-010-054-A ** ON A/C NOT FOR ALL (1) Make sure that the potable water shutoff-valve in each lavatory is open.
(2) Make sure that the potable water shutoff-valve in each wet galley is open.
(3) Make sure that the potable water shutoff-valve in each galley is open.
F. Open for Access
(1) Open the access panels 133AL 171AL.
(2) Remove the cap from the fill and drain port on the service panel 2023VU.
Subtask 12-24-38-010-054-B ** ON A/C NOT FOR ALL (1) Open the access panels 133AL 171AL.
(2) Remove the cap from the fill and drain port on the service panel 2023VU.
F. Open for Access
(1) Open the access panels 133AL 192NB 171AL.
(2) Remove the cap from the fill and drain port on the service panel 2023VU.
4. Procedure(1) Open the access panels 133AL 192NB 171AL.
(2) Remove the cap from the fill and drain port on the service panel 2023VU.
Subtask 12-24-38-680-051-B ** ON A/C NOT FOR ALL
A. Draining of the Potable Water System (PWS)
(a) Turn fill and drain control handle 3254MM to the PULL TO DRAIN position. Then, pull it to the mechanical stop.
(4) Operate the water faucet(s), the coffee makers and the water heater in the galley(s) (if installed) to drain them.
(5) Do step (4) again and again until the remaining water is fully drained from the galley(s).
(7) When the system is drained, remove the drain hose from:
Subtask 12-24-38-680-051-C ** ON A/C NOT FOR ALL CAUTION:
MAKE SURE THAT THE DRAIN VALVES ARE IN THE CLOSED POSITION IF THE BLEED AIR SYSTEM IS "ON".
YOU MUST DO THIS LESS THAN 10 MIN AFTER THE FLOW OF WATER FROM THE DRAIN PORTS OF THE POTABLE WATER SYSTEM STOPS.
THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.
(1) Connect the HOSE - DRAIN to: - The fill and drain port on Potable Water Service Panel (PWSP) 2023VU
- The drain port on the forward drain panel.
(a) Turn fill and drain control handle 3254MM to the PULL TO DRAIN position. Then, pull it to the mechanical stop.
NOTE: Drain-valve control light 2MP comes on.
NOTE: The water drains from:
(3) In the lavatories, push the toilet flush button to drain the remaining water from the toilet system. - The fill and drain port on PWSP 2023VU
- The drain port on the forward drain panel.
(4) Operate the water faucet(s), the coffee makers and the water heater in the galley(s) (if installed) to drain them.
(5) Do step (4) again and again until the remaining water is fully drained from the galley(s).
NOTE: After you drain the PWS:
(6) You must do step (4) again if the aircraft is moved. - 15 minutes is necessary to drain the water from the galley(s).
- The position of the aircraft has an effect on the time necessary to drain the water from the galley(s).
(7) When the system is drained, remove the drain hose from:
- The fill and drain port on PWSP 2023VU
- The drain port on the forward panel.
NOTE: If you drain the PWS in cold weather, it is recommended that you put the fill and drain control handle in the DRAIN position.
A. Draining of the Potable Water System (PWS)
(a) Turn fill and drain control handle 3254MM to the PULL TO DRAIN position. Then, pull it to the mechanical stop.
(4) Operate the water faucet(s), the coffee makers and the water heater in the galley(s) (if installed) to drain them.
(5) Do step (4) again and again until the remaining water is fully drained from the galley(s).
(7) When the system is drained, remove the drain hose from:
5. Close-upCAUTION:
MAKE SURE THAT THE DRAIN VALVES ARE IN THE CLOSED POSITION IF THE BLEED AIR SYSTEM IS "ON".
YOU MUST DO THIS LESS THAN 10 MIN AFTER THE FLOW OF WATER FROM THE DRAIN PORTS OF THE POTABLE WATER SYSTEM STOPS.
THIS WILL PREVENT DAMAGE TO THE POTABLE WATER SYSTEM.
(1) Connect the HOSE - DRAIN to: - The fill and drain port on Potable Water Service Panel (PWSP) 2023VU
- The drain port on the mid drain and overflow panel
- The drain port on the forward drain panel.
(a) Turn fill and drain control handle 3254MM to the PULL TO DRAIN position. Then, pull it to the mechanical stop.
NOTE: The lights that follow come on:
- Drain-valve control light 2MP
- Drain-valve control light 12MP
- Overflow-valve control light 6MP.
NOTE: The water drains from:
(3) In the lavatories, push the toilet flush button to drain the remaining water from the toilet system. - The fill and drain port on PWSP 2023VU
- The drain port on the mid drain and overflow panel
- The drain port on the forward drain panel.
(4) Operate the water faucet(s), the coffee makers and the water heater in the galley(s) (if installed) to drain them.
(5) Do step (4) again and again until the remaining water is fully drained from the galley(s).
NOTE: After you drain the PWS:
(6) You must do step (4) again if the aircraft is moved. - 15 minutes is necessary to drain the water from the galley(s).
- The position of the aircraft has an effect on the time necessary to drain the water from the galley(s).
(7) When the system is drained, remove the drain hose from:
- The fill and drain port on PWSP 2023VU
- The drain port on the mid drain and overflow panel
- The drain port on the forward drain panel.
NOTE: If you drain the PWS in cold weather, it is recommended that you put the fill and drain control handle in the DRAIN position.
Subtask 12-24-38-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Clean and dry the panels with a lint free cloth Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Install the cap on the fill and drain port of the service panel.
Subtask 12-24-38-410-052-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Clean and dry the panels with a lint free cloth Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Install the cap on the fill and drain port of the service panel.
NOTE: If the draining is done in cold weather the caps and access panels should be left open (Ref. AMM TASK 12-31-38-660-001).
(4) Close the access panels 133AL 171AL. A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Clean and dry the panels with a lint free cloth Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Install the cap on the fill and drain port of the service panel.
Subtask 12-24-38-862-051-A Subtask 12-24-38-942-055-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Clean and dry the panels with a lint free cloth Textile-Lint free Cotton - (Material No.14SBA1) .
(3) Install the cap on the fill and drain port of the service panel.
NOTE: If the draining is done in cold weather the caps and access panels should be left open (Ref. AMM TASK 12-31-38-660-001).
(4) Close the access panels 133AL 192NB 171AL. C. Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Potable Water Service-Panel