W DOC AIRBUS | AMM A320F

Detailed Inspection of Attachment Points


TASK 25-30-00-210-001-A
Detailed Inspection of Attachment Points


WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 200
1. Reason for the Job
Refer to the MPD TASK: 253000-01
DETAILED INSPECTION OF ATTACHMENT POINTS
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
MIRROR - INSPECTION, FLEXIBLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 23-73-22-000-001-A
Removal of the Attendant Indication Panel
TASK 23-73-22-400-001-A
Installation of the Attendant Indication Panel
TASK 23-73-63-000-802-A
Removal of the No Smoking/No PED/No Mobile/Fasten Seat Belt sign
TASK 23-73-63-400-802-A
Installation of the No Smoking/No PED/No Mobile/Fasten Seat Belt sign
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-23-41-000-001-A
Removal of the Ceiling Panels
TASK 25-23-41-400-001-A
Installation of the Ceiling Panels
TASK 25-23-42-000-001-A
Removal of the Ceiling Panels - Forward Utility Area
TASK 25-23-42-000-002-A
Removal of the Ceiling Panels - Aft Utility Area
TASK 25-23-42-400-001-A
Installation of the Ceiling Panels - Forward Utility Area
TASK 25-23-42-400-002-A
Installation of the Ceiling Panels - Aft Utility Area
TASK 25-23-45-000-002-A
Removal of the Door Frame Linings from the Right Forward Passenger/Crew Door
TASK 25-23-45-400-007-A
Installation of the Door Frame Linings on the Right Forward Passenger/Crew Door
TASK 25-31-41-000-001-A
Removal of the Forward Galley Unit
TASK 25-31-41-400-001-A
Installation of the Forward Galley Unit
TASK 25-31-42-000-001-A
Removal of the Forward Galley Unit
TASK 25-31-42-400-001-A
Installation of the Forward Galley Unit
TASK 25-31-44-000-001-A
Removal of the Forward Galley Unit
TASK 25-31-44-400-001-A
Installation of the Forward Galley Unit
TASK 25-33-41-000-002-A
Removal of the Aft Galley Unit
TASK 25-33-41-400-002-A
Installation of the Aft Galley Unit
TASK 25-33-42-000-001-A
Removal of the Aft Galley Unit
TASK 25-33-42-400-001-A
Installation of the Aft Galley Unit
TASK 25-33-45-000-001-A
Removal of the Aft Galley Unit
TASK 25-33-45-400-001-A
Installation of the Aft Galley Unit
TASK 25-33-50-000-802-A
Removal of Galley G4B (Space-Flex V2)
TASK 25-33-50-400-802-A
Installation of Galley G4B (Space-Flex V2)
TASK 25-35-34-000-001-A
Removal of the Galley Control Panel
TASK 25-35-34-400-001-A
Installation of the Galley Control Panel
TASK 53-46-04-000-801-A
Removal of the Handgrip Support Assembly
TASK 53-46-04-400-801-A
Installation of the Handgrip Support Assembly
3. Job Set-up
Subtask 25-30-00-861-051-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-30-00-010-093-A
B. Get Access
   (1) Open all applicable doors to get access to the parts that you must remove/disconnect.
   (2) If necessary, remove the galley trolleys.
   (3) If necessary, remove the galley control panel(s) (Ref. AMM TASK 25-35-34-000-001).
   (4) If necessary, remove the Attendant Indication Panel (AIP) (Ref. AMM TASK 23-73-22-000-001).
   (5) If necessary, remove the No Smoking/Fasten Seat Belt (NS/FSB) sign(s) (Ref. AMM TASK 23-73-63-000-802).
   (6) If necessary, remove the ceiling panels in the area of the galley(s) (Ref. AMM TASK 25-23-41-000-001).
   (7) If necessary, remove the door frame linings in the area of the galley(s) (Ref. AMM TASK 25-23-45-000-002).
   (8) If necessary, remove the handgrip support assembly (Ref. AMM TASK 53-46-04-000-801).
   (9) If necessary, remove the forward utility-area ceiling-panels (Ref. AMM TASK 25-23-42-000-001).
   (10) If necessary, remove the aft utility-area ceiling-panels (Ref. AMM TASK 25-23-42-000-002).
Subtask 25-30-00-010-094-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Get access to the attachment points of the forward galley (Ref. AMM TASK 25-31-41-000-001).
NOTE: It is not necessary to remove the galley fully to get access to the attachment points.
Subtask 25-30-00-010-098-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Get access to the attachment points of the forward galley unit (Ref. AMM TASK 25-31-42-000-001).
NOTE: It is not necessary to remove the forward galley unit fully to get access to the attachment points.
Subtask 25-30-00-010-100-A ** ON A/C NOT FOR ALL
E. Get Access
   (1) Get access to the attachment points of the forward galley unit (Ref. AMM TASK 25-31-44-000-001).
NOTE: It is not necessary to remove the forward galley unit fully to get access to the attachment points.
Subtask 25-30-00-010-116-A ** ON A/C NOT FOR ALL
F. Get Access
   (1) Get access to the attachment points of the aft galley (Ref. AMM TASK 25-33-41-000-002).
NOTE: It is not necessary to remove the galley fully to get access to the attachment points.
Subtask 25-30-00-010-119-A ** ON A/C NOT FOR ALL
G. Get Access
   (1) Get access to the attachment points of the aft galley unit (Ref. AMM TASK 25-33-42-000-001).
NOTE: It is not necessary to remove the aft galley unit fully to get access to the attachment points.
Subtask 25-30-00-010-121-A ** ON A/C NOT FOR ALL
H. Get Access
   (1) Get access to the attachment points of the aft galley unit (Ref. AMM TASK 25-33-45-000-001).
NOTE: It is not necessary to remove the aft galley unit fully to get access to the attachment points.
Subtask 25-30-00-010-130-A ** ON A/C NOT FOR ALL
I. Get Access
   (1) Get access to the attachment points of the aft galley unit (Ref. AMM TASK 25-33-50-000-802).
NOTE: It is not necessary to remove the aft galley unit fully to get access to the attachment points.
4. Procedure
Subtask 25-30-00-210-050-A
A. Detailed Inspection of Attachment Points
   (1) Examine the upper attachment points. If necessary, use the MIRROR - INSPECTION, FLEXIBLE.
     (a) Make sure that the rods and the fittings are in the correct condition.
     (b) Make sure that the supports, the bolts and the nuts are in the correct condition.
     (c) Make sure that the quick-release pins are in the correct condition.
     (d) Make sure that the bolts, nuts, supports, rods and fittings are correctly installed.
   (2) Examine the lower attachment points.
     (a) Make sure that the supports, the bolts and the nuts are in the correct condition.
     (b) Make sure that the mounting points are in the correct condition.
     (c) Make sure that the supports, the bolts and the nuts are correctly installed.
5. Close-up
Subtask 25-30-00-410-096-A ** ON A/C NOT FOR ALL
A. Close Access
   (1) Close the access to the attachment points of the forward galley (Ref. AMM TASK 25-31-41-400-001).
NOTE: To close the access to the attachment points, it is necessary to install all the components which were removed before.
Subtask 25-30-00-410-100-A ** ON A/C NOT FOR ALL
B. Close Access
   (1) Close the access to the attachment points of the forward galley unit (Ref. AMM TASK 25-31-42-400-001).
NOTE: To close the access to the attachment points, it is necessary to install all the components which were removed before.
Subtask 25-30-00-410-102-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Close the access to the attachment points of the forward galley unit (Ref. AMM TASK 25-31-44-400-001).
NOTE: To close the access to the attachment points, it is necessary to install all the components which were removed before.
Subtask 25-30-00-410-118-A ** ON A/C NOT FOR ALL
D. Close Access
   (1) Close the access to the attachment points of the aft galley (Ref. AMM TASK 25-33-41-400-002).
NOTE: To close the access to the attachment points, it is necessary to install all the components which were removed before.
Subtask 25-30-00-410-121-A ** ON A/C NOT FOR ALL
E. Close Access
   (1) Close the access to the attachment points of the aft galley unit (Ref. AMM TASK 25-33-42-400-001).
NOTE: To close the access to the attachment points, it is necessary to install all the components which were removed before.
Subtask 25-30-00-410-123-A ** ON A/C NOT FOR ALL
F. Close Access
   (1) Close the access to the attachment points of the aft galley unit (Ref. AMM TASK 25-33-45-400-001).
NOTE: To close the access to the attachment points, it is necessary to install all the components which were removed before.
Subtask 25-30-00-410-133-A ** ON A/C NOT FOR ALL
G. Close Access
   (1) Close the access to the attachment points of the aft galley unit (Ref. AMM TASK 25-33-50-400-802).
NOTE: To close the access to the attachment points, it is necessary to install all the components which were removed before.
Subtask 25-30-00-410-130-A
H. Close Access
   (1) If the aft utility-area ceiling-panels are removed, install them (Ref. AMM TASK 25-23-42-400-002).
   (2) If the forward utility-area ceiling-panels are removed, install them (Ref. AMM TASK 25-23-42-400-001).
   (3) If the handgrip support assembly is removed, install it (Ref. AMM TASK 53-46-04-400-801).
   (4) If the door frame linings in the area of the galley(s) are removed, install them (Ref. AMM TASK 25-23-45-400-007).
   (5) If the ceiling panels in the area of the galley(s) are removed, install them (Ref. AMM TASK 25-23-41-400-001).
   (6) If the NS/FSB sign(s) is (are) removed, install it (them) (Ref. AMM TASK 23-73-63-400-802).
   (7) If the AIP is removed, install it (Ref. AMM TASK 23-73-22-400-001).
   (8) If the galley control panel(s) is (are) removed, install it (them) (Ref. AMM TASK 25-35-34-400-001).
   (9) If the galley trolleys are removed, move them into the galley(s) and lock them in position.
   (10) Close all doors.
   (11) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-30-00-862-051-A
I. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001).
[Rev.10 from 2021] 2026.03.31 23:33:29 UTC