W DOC AIRBUS | AMM A320F

Removal of the Ceiling Panels - Forward Utility Area


TASK 25-23-42-000-001-A
Removal of the Ceiling Panels - Forward Utility Area


1. Reason for the Job
NOTE: More than one person is necessary for this task.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
221AC, 221BC, 222BC
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 23-72-51-000-001-A
Removal of the Anti-Hijack-System Cameras
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 25-23-42-861-050-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
Subtask 25-23-42-010-058-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Remove the cameras (Ref. AMM TASK 23-72-51-000-001).
Subtask 25-23-42-865-050-A
C. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUCOM/CIDS/DEU B/ESS153RHG03
49VULIGHTING/EMER LT/CABIN2WLH06
49VULIGHTING/EMER LT/CABIN1WLH05
** ON A/C NOT FOR ALL
49VULIGHTING/EMER LT/CABIN2WLH04
49VULIGHTING/EMER LT/CABIN1WLH03
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM08
** ON A/C NOT FOR ALL
121VUCOM NAV/CIDS/DEU B/NORM162RHM09
** ON A/C NOT FOR ALL
121VUCOM/CIDS/DEU B/BAT143RHN12
** ON A/C NOT FOR ALL
2000VULAV FWD-OCCUPIED1WJF01
** ON A/C ALL
2000VULIGHT-CABIN-ENTRY308LGJ02
** ON A/C NOT FOR ALL
2000VULAV FWD & MID-OCCUPIED1WJF01
4. Procedure
Subtask 25-23-42-020-050-A ** ON A/C NOT FOR ALL
A. Removal of the Ceiling Panel (1)
   (1) Hold the panel (1) in position and release the quick-release fasteners (15).
   (2) Carefully remove the panel (1).
Subtask 25-23-42-020-052-A ** ON A/C NOT FOR ALL
B. Removal of the Ceiling Panel(s) (2) and/or (3)
   (1) Be careful when you remove the ceiling panel(s) (2) and/or (3), because other furnishings decrease the available work area.
   (2) Remove the assembly seal (13) from the mounting rail (14).
   (3) Hold the panel(s) (2) and/or (3) in position and release the quick-release fasteners (15).
   (4) Carefully remove the panel(s) (2) and/or (3).
Subtask 25-23-42-020-053-A ** ON A/C NOT FOR ALL
C. Removal of the Ceiling Panel(s) (4) and/or (7)
   (1) Remove the assembly seal (13) from the mounting rail (14).
   (2) Carefully move the ceiling panel(s) (4) and/or (7) inboard and off the mounting rail (14).
   (3) Lower the inboard edge(s) of the ceiling panel(s) (4) and/or (7) and pull the outboard edge(s) out of the mounting bracket.
   (4) Carefully remove the ceiling panel(s) (4) and/or (7).
Subtask 25-23-42-020-060-A ** ON A/C NOT FOR ALL
D. Removal of the Ceiling Panel (5) and the Trim Panel (6)
   (1) Remove the assembly seal (13) from the mounting rail (14).
   (2) Carefully remove the ceiling panel (5) from the mounting rail (14).
   (3) Do the next steps through the openings where the ceiling panels (4), (7) and (5) were installed:
     (a) Disconnect the electric connector (8).
     (b) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
     (c) Hold the trim panel (6) and remove the nuts (11), the bolts (9) and the washers (10).
   (4) Carefully remove the trim panel (6) from the mounting structure (12).
Subtask 25-23-42-020-050-B ** ON A/C NOT FOR ALL
E. Removal of the Ceiling Panel (1)
   (1) Remove the caps (10).
   (2) Hold ceiling panel 221AC (1) and release the quick-release fasteners (9).
   (3) Carefully remove ceiling panel 221AC (1).
Subtask 25-23-42-020-052-B ** ON A/C NOT FOR ALL
F. Removal of the Ceiling Panels (2) and (6)
   (1) Be careful when you remove ceiling panels 221BC (2) and 222BC (6) because other furnishings decrease the available work area.
   (2) Remove the section hose (7) from the mounting rails (8).
   (3) Hold ceiling panels 221BC (2) and 222BC (6) and release the quick-release fasteners (9).
   (4) Release panel 221BC (2) and 222BC (6) from the mounting rails (8).
   (5) Carefully remove ceiling panels 221BC (2) and 222BC (6).
Subtask 25-23-42-020-053-B ** ON A/C NOT FOR ALL
G. Removal of the Ceiling Panels (3) and (5)
   (1) Remove the section hose (7) from the mounting rails (8).
   (2) Hold the ceiling panels (3) and (5) and release the quick-release fasteners (9).
   (3) Release the ceiling panels (3) and (5) from the mounting rails (8).
   (4) Carefully remove the ceiling panels (3) and (5).
Subtask 25-23-42-020-060-B ** ON A/C NOT FOR ALL
H. Removal of the Ceiling Panel (4)
   (1) Remove the section hose (7) from the mounting rails (8).
   (2) Release the ceiling panel (4) from the mounting rails (8) and remove it.
[Rev.10 from 2021] 2026.03.31 23:31:02 UTC