Installation of the Galley Control Panel
TASK 25-35-34-400-001-A
Installation of the Galley Control Panel
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 25-35-34-861-051-A
Subtask 25-35-34-420-050-A
(1) Remove the CAP-BLANKING from each electrical connector and receptacle.
(2) Make sure that all the electrical connections are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Connect the electrical connectors (3) ESPM 2044000.
(5) Carefully push the galley control-panel (2) into the galley.
(6) Install the screws (1) and tighten them.
Subtask 25-35-34-865-055-A
Subtask 25-35-34-410-050-A
[Rev.10 from 2021]
2026.03.31 23:34:39 UTC
Installation of the Galley Control Panel
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| ESPM 2044000 | |
Subtask 25-35-34-861-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the Ground Service Network is energized (Ref. AMM TASK 24-42-00-861-001)
Subtask 25-35-34-865-054-A (1) Make sure that the Ground Service Network is energized (Ref. AMM TASK 24-42-00-861-001)
B. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
| ** ON A/C ALL | |||
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER B | 12MC | AD09 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
| 123VU | FWD GALLEY/FEEDER C | 1MC | AE10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | FWD GALLEY/FEEDER D | 2MC | AE02 |
Subtask 25-35-34-420-050-A
WARNING:
MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND THE CAUTIONS INCLUDED IN THE REFERENCED PROCEDURES.
A. Installation of the Galley Control-Panel (1) Remove the CAP-BLANKING from each electrical connector and receptacle.
(2) Make sure that all the electrical connections are clean and in the correct condition.
(3) Do an inspection of the component interfaces and the adjacent area.
(4) Connect the electrical connectors (3) ESPM 2044000.
(5) Carefully push the galley control-panel (2) into the galley.
(6) Install the screws (1) and tighten them.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-35-34-861-052-A Subtask 25-35-34-860-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
| ** ON A/C ALL | |||
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER B | 12MC | AD09 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
| 123VU | FWD GALLEY/FEEDER C | 1MC | AE10 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | FWD GALLEY/FEEDER D | 2MC | AE02 |
D. Aircraft Maintenance Configuration
(1) On the overhead panel 35VU, push the GALLEY pushbutton 2XA.
(2) Make sure that the white OFF indicator at the GALLEY pushbutton 2XA does not come on.
Subtask 25-35-34-710-050-A (1) On the overhead panel 35VU, push the GALLEY pushbutton 2XA.
(2) Make sure that the white OFF indicator at the GALLEY pushbutton 2XA does not come on.
E. Do an Operational Test of the Galley Control-Panel
(1) Close all circuit breakers (4) on the galley control panel (2).
(2) Do a test of all the electrical galley equipment installed at the related galley, for typical basic functions.
5. Close-up(1) Close all circuit breakers (4) on the galley control panel (2).
(2) Do a test of all the electrical galley equipment installed at the related galley, for typical basic functions.
Subtask 25-35-34-410-050-A
A. Close Access
(1) On the overhead panel 35VU, release the GALLEY pushbutton 2XA.
(2) Make sure that the OFF indicator, on the GALLEY pushbutton 2XA comes on.
(3) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-35-34-862-050-A (1) On the overhead panel 35VU, release the GALLEY pushbutton 2XA.
(2) Make sure that the OFF indicator, on the GALLEY pushbutton 2XA comes on.
(3) Make sure that the work area is clean and clear of tools and other items.
B. De-energize the electrical network
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002)
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001)
(1) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002)
(2) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001)
Galley Control Panel