W DOC AIRBUS | AMM A320F

Installation of the Door Frame Linings on the Right Forward Passenger/Crew Door


TASK 25-23-45-400-007-A
Installation of the Door Frame Linings on the Right Forward Passenger/Crew Door


1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
Torque wrench: range to between 0.88 and 0.72 m.daN (77.88 and 63.72 lbf.in ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
222RW, 222SW, 222TW, 222UW, 222VW, 232AW, 232BW, 232CW
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 11-00-00-400-002-A
Installation of the Decals
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 25-23-43-400-001-A
Installation of the Upper Sidewall Panel
TASK 33-51-11-400-001-A
Installation of the Cabin Emergency Light
TASK 33-51-13-400-001-A
Installation of the Cabin Wall-Mounted Emergency-Exit-Markers
TASK 33-51-16-400-001-A
Installation of the Emergency Exit Sign
TASK 35-21-41-400-001-A
Installation of the Emergency Oxygen Containers
TASK 35-23-00-710-001-A
Operational Check of Manual Mask Release
TASK 52-10-00-410-001-A
Closing of the Passenger/Crew Door
3. Job Set-up
Subtask 25-23-45-860-051-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the ground service network is energized
(Ref. AMM TASK 24-42-00-861-001)
   (2) Clean the component interfaces and the adjacent area.
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 25-23-45-865-065-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUVACUUM CLEANER SKT-CAB-Z2221MEF07
** ON A/C NOT FOR ALL
2000VUVACU CLEANER SKT-CAB-Z2221MEF07
** ON A/C NOT FOR ALL
2000VUVACU CLEANER SKT-CAB-Z2221MEA03
4. Procedure
Subtask 25-23-45-210-076-A
A. Preparation for Installation
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Make sure that all placards of the retained/new components are in their correct positions and in a good condition.
   (4) If necessary, install new placards (Ref. AMM TASK 11-00-00-400-002) and (Ref. AMM D/O 11-32-25-00).
Subtask 25-23-45-420-058-C
B. Installation of door frame linings 222RW, 222SW, 222TW, 222UW, 222VW, 232CW, 232BW, 232AW
   (1) If you removed lining 232CW (1), install it:
     (a) Engage the ceiling panel and put lining 232CW (1) in position.
     (b) Install the seal assembly.
     (c) Install lining 232CW (1).
   (2) If you removed lining 232BW (2), install it:
     (a) Put lining 232BW (2) in position and engage the attachment brackets into the yo-yo rolls.
     (b) Install the washers (9) and the screws (10).
     (c) Tighten the screws (10).
   (3) If you removed lining 232AW (3), install it:
     (a) Put lining 232BW (3) in position and engage the attachment brackets into the yo-yo rolls.
     (b) Install the washers (31) and the screws (30).
     (c) Tighten the screws (30).
   (4) Install the sidewall panel(s) (Ref. AMM TASK 25-23-43-400-001) if necessary.
   (5) Install lining 222RW (4):
     (a) Put the socket (29) in position and install the nuts (28).
     (b) Tighten the nuts (28).
     (c) Put lining 222RW (4) in position.
     (d) Install the washers (9) and the screws (10) and (11).
     (e) Do not tighten the screws (10) and (11) at this time.
     (f) Install the handgrip (18):
       1 Put the spacer (17) (if installed), the handgrip (18) and the plates (19) in position and install the screws (20) and (23).
       2 TORQUE the screws (20) and (23) to between 0.88 and 0.72 m.daN (77.88 and 63.72 lbf.in ) T.
       3 Install the handgrip cover (22).
       4 Make sure that the lugs (21) of the handgrip cover (22) engage correctly.
       5 Press the handgrip cover (22) into position until you hear a click.
     (g) Tighten the screws (10) and (11) and install the caps (12).
   (6) Install lining
222TW (5):
     (a) Put lining 222TW (5) in position and install the washers (9) and the screws (10) and (11).
     (b) Tighten the screws (10) and (11).
     (c) Install the caps (12).
   (7) Install lining 222VW (8):
     (a) Put lining 222VW (8) in position and install the washers (9) and the screws (10).
     (b) Tighten the screws (10).
   (8) Install lining 222UW (6):
     (a) Put lining 222UW (6) in position and install the washers (9) and the screws (10).
     (b) Tighten the screws (10).
     (c) Put the latch hook (26) in position and install the washers (24) and the screws (25).
     (d) Tighten the screws (25).
     (e) Install the handgrip (18):
       1 Put the spacer (17) (if installed), the handgrip (18) and the plates (19) in position and install the screws (20) and (23).
       2 TORQUE the screws (20) and (23) to between 0.88 and 0.72 m.daN (77.88 and 63.72 lbf.in ) T.
       3 Install the handgrip cover (22).
       4 Make sure that the lugs (21) of the handgrip cover (22) engage correctly.
       5 Push the handgrip cover (22) into position until you hear a click.
   (9) Install lining
222SW (7):
     (a) Install oxygen container 40WR (Ref. AMM TASK 35-21-41-400-001) if necessary.
     (b) Make sure that there is a clearance of 2.0 +0.0 -0.5 mm (0.08 +0.00 -0.02 in.) at each side of the oxygen container doors (Ref. AMM TASK 35-23-00-710-001).
     (c) Put lining 222SW (7) in position.
     (d) Install the washers (9) and (15) and the screws (10), (11) and (16).
     (e) Tighten the screws (10), (11) and (16) and install the caps (12).
     (f) Remove the blanking plugs from the line ends.
     (g) Connect the hose (13) and tighten the clamp (14).
     (h) Remove the CAP-BLANKING from each electrical connector and receptacle.
     (i) Make sure that all the electrical connections are clean and in the correct condition.
     (j) Connect the electrical connector (27).
5. Close-up
Subtask 25-23-45-410-054-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the cabin wall-mounted emergency-exit-marker 90WL2 (Ref. AMM TASK 33-51-13-400-001).
   (3) Install the cabin emergency light 20WL (Ref. AMM TASK 33-51-11-400-001).
   (4) Install the emergency exit sign 40WL (Ref. AMM TASK 33-51-16-400-001).
   (5) Close the FWD passenger/crew door, Zone 841 (Ref. AMM TASK 52-10-00-410-001).
Subtask 25-23-45-865-062-A
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUVACUUM CLEANER SKT-CAB-Z2221MEF07
** ON A/C NOT FOR ALL
2000VUVACU CLEANER SKT-CAB-Z2221MEF07
** ON A/C NOT FOR ALL
2000VUVACU CLEANER SKT-CAB-Z2221MEA03
Subtask 25-23-45-862-052-A
C. De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001)