Installation of the Air-Conditioning Distribution Ducts
TASK 21-20-00-410-001-A
Installation of the Air-Conditioning Distribution Ducts
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 21-20-00-860-050-A
Subtask 21-20-00-560-050-A
Subtask 21-20-00-410-050-A
[Rev.10 from 2021]
2026.04.01 04:54:39 UTC
Installation of the Air-Conditioning Distribution Ducts
WARNING:
MAKE SURE THAT AIR IS NOT SUPPLIED TO THE AIR CONDITIONING SYSTEM FROM THE MAIN ENGINE, THE APU OR A GROUND SOURCE.
HOT COMPRESSED AIR CAN CAUSE INJURY TO PERSONNEL.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 2 | ACCESS PLATFORM 2M (6 FT) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.05RAJ9) | Adhesive Film Tape-- Film PTFE - |
| (Material No.05TGA1) | Adhesive Tape-Insulation Blanket - - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 811, 824, 825, 826 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-33-21-618-001-A | Pre-conditioning through the LP Ground Connection (Aircraft Electrical Power Available) |
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 12-33-21-618-001-A-03 | Pre-conditioning through the LP Ground Connection (Aircraft Electrical Power Not Available) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-13-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-13-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-42-000-001-A | Removal of the Ceiling Panels - Forward Utility Area |
| TASK 25-23-42-400-001-A | Installation of the Ceiling Panels - Forward Utility Area |
| TASK 25-23-43-000-001-A | Removal of the Upper Sidewall Panel |
| TASK 25-23-43-400-001-A | Installation of the Upper Sidewall Panel |
| TASK 25-23-44-000-001-A | Removal of the Lower Sidewall Panels (Dado Panels) |
| TASK 25-23-44-400-001-A | Installation of the Lower Sidewall Panels (Dado Panels) |
| TASK 25-41-41-000-001-A | Removal of Lavatory A |
| TASK 25-41-41-000-001-B | Removal of Lavatory A |
| TASK 25-41-41-400-001-A | Installation of Lavatory A |
| TASK 25-41-41-400-001-B | Installation of Lavatory A |
| TASK 25-54-12-000-001-A | Removal of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-000-002-A | Removal of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 25-54-12-000-003-A | Removal of the Sidewall Panels in the Forward Cargo Compartment |
| TASK 25-54-12-400-001-A | Installation of the Forward Cargo-Compartment Partition |
| TASK 25-54-12-400-002-A | Installation of the Ceiling Panels in the Forward Cargo Compartment |
| TASK 25-54-12-400-003-A | Installation of the Sidewall Panels in the Forward Cargo Compartment |
| TASK 25-55-11-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR47 |
| TASK 25-55-11-000-002-A | Removal of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 25-55-11-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
| TASK 25-55-11-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR47 |
| TASK 25-55-11-400-002-A | Installation of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 25-55-11-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR47/FR59 |
| TASK 25-55-12-000-001-A | Removal of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-000-002-A | Removal of the Ceiling Panels in the Aft Cargo Compartment at FR59/FR65 |
| TASK 25-55-12-000-003-A | Removal of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 25-55-12-400-001-A | Installation of the Aft Cargo-Compartment Partition at FR65 |
| TASK 25-55-12-400-002-A | Installation of the Ceiling Panels in the Aft Cargo Compartment at FR59/FR65 |
| TASK 25-55-12-400-003-A | Installation of the Sidewall Panels in the Aft Cargo Compartment - FR59/FR65 |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-41-00-010-002-A | Open the Avionics Compartment Doors for Access |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
| TASK 53-00-00-000-801-A | Removal of the Floor Panels in the Cabin from FR12 to FR70 |
| TASK 53-00-00-000-801-A-01 | Removal of the Floor Panels in the Cabin from FR12 to FR70 (Alternative Removal Procedure - Dry Sealing Concept) |
| TASK 53-00-00-000-801-A-02 | Removal of the Cabin Floor Panels from FR12 to FR70 (Alternative Removal Procedure with the Skyflex Option) |
| TASK 53-00-00-400-801-A | Installation of the Floor Panels in the Cabin from FR12 to FR70 |
| TASK 53-00-00-400-801-A-01 | Installation of the Floor Panels in the Cabin from FR12 to FR70 (Alternative Installation Procedure - Dry Sealing Concept) |
| TASK 53-00-00-400-801-A-02 | Installation of the Cabin Floor Panels from FR12 to FR70 (Alternative Installation Procedure with the Skyflex Option) |
| TASK 53-12-13-400-001-A | Installation of the avionics compartment floor panels |
Subtask 21-20-00-860-050-A
A. Aircraft Maintenance Configuration
(1) Make sure that:
(a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(b) On the panel 30VU:
1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
3 The warning notice to tell persons not to operate these pushbutton switches is in position.
(c) On the HP and the LP ground connector the warning notice to tell persons not to supply the ground air is in position.
(d) For the cockpit area supply and ventilation ducts:
Subtask 21-20-00-865-051-A (1) Make sure that:
(a) The aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(b) On the panel 30VU:
1 The APU BLEED pushbutton switch is in the off position (the ON legend is off).
2 The ENG 1 BLEED and the ENG 2 BLEED pushbutton switches are in the off position (the OFF legends are on).
3 The warning notice to tell persons not to operate these pushbutton switches is in position.
(c) On the HP and the LP ground connector the warning notice to tell persons not to supply the ground air is in position.
(d) For the cockpit area supply and ventilation ducts:
- the access panels are removed as necessary (Ref. AMM TASK 25-13-41-000-001).
- the lavatory is removed (Ref. AMM TASK 25-41-41-000-001).
- the ceiling panel 221AC is removed as necessary (Ref. AMM TASK 25-23-42-000-001).
- the ACCESS PLATFORM 2M (6 FT) is in position at access door 824 and 811, as necessay.
- the access doors 824 and 811 are open (Ref. AMM TASK 52-41-00-010-002).
- the ACCESS PLATFORM 2M (6 FT) is in position at the FWD cargo-compartment door 825,
- the FWD cargo-compartment door 825 is open (Ref. AMM TASK 52-30-00-860-001),
- the access panels are removed as necessary (Ref. AMM TASK 25-54-12-000-001), (Ref. AMM TASK 25-54-12-000-002) or (Ref. AMM TASK 25-54-12-000-003).
- the cabin floor panels are removed as necessary (Ref. AMM TASK 53-00-00-000-801).
- the ACCESS PLATFORM 2M (6 FT) is in position at the AFT cargo-compartment door 826,
- the AFT cargo-compartment door 826 is open (Ref. AMM TASK 52-30-00-860-001),
- the access panels are removed as necessary (Ref. AMM TASK 25-55-11-000-001), (Ref. AMM TASK 25-55-11-000-002), (Ref. AMM TASK 25-55-11-000-003), (Ref. AMM TASK 25-55-12-000-001), (Ref. AMM TASK 25-55-12-000-002) or (Ref. AMM TASK 25-55-12-000-003).
- the upper and the lower sidewall panels are removed as necessary (Ref. AMM TASK 25-23-44-000-001) and (Ref. AMM TASK 25-23-43-000-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | AIR COND/RECIRC FAN/R/SPLY | 3HG | W18 |
| 122VU | AIR COND/RECIRC FAN/L/SPLY | 1HG | X18 |
Subtask 21-20-00-560-050-A
A. Preparation of the Replacement Air-Conditioning Distribution Duct
(1) Where applicable remove the attached components, for example drain hose, blanking caps, restrictors etc. from the removed duct.
Subtask 21-20-00-420-050-A (1) Where applicable remove the attached components, for example drain hose, blanking caps, restrictors etc. from the removed duct.
NOTE: Identify the respective positions of the restrictors on the removed duct.
The restrictors must be installed in the identical positions on the replacement duct.
The position of the restrictors is not usually interchangeable.
(2) Install the removed components in their correct respective positions on the replacement duct. The restrictors must be installed in the identical positions on the replacement duct.
The position of the restrictors is not usually interchangeable.
B. Installation of an Air-Conditioning Distribution Duct
(1) Remove the protective covers from the ends of the ducts and the related connections.
(2) Where applicable make sure that:
(a) The blanking caps (7) and the clamps (2) are correctly installed.
(b) The restrictors (9) are correctly installed in the duct (1).
(a) Install the washers (21) and the screws (20) or,
(b) Put the clamps (25) in position and install the washers (21) and the screws (20) or,
(c) Put the clamps (22) in position on the brackets (23),
(b) Put the seal (5) in position between the ducts (1) and install the screws (6) and the nuts (4).
(c) Put the bellows (3) and the clamps (2) in position on the duct (1) and tighten the clamps (2) or,
(d) Put the sleeve (8) and the clamps (2) in position on the duct (1) and tighten the clamps (2).
(5) If previously installed:
(a) Apply rub coat on the duct as protection:
Subtask 21-20-00-865-052-A (1) Remove the protective covers from the ends of the ducts and the related connections.
(2) Where applicable make sure that:
(a) The blanking caps (7) and the clamps (2) are correctly installed.
(b) The restrictors (9) are correctly installed in the duct (1).
NOTE: The restrictors (9) must be installed in the original position in the duct.
The position of the restrictors is not usually interchangeable.
(3) Put the duct (1) in position and, applicable upon duct attachment method: The position of the restrictors is not usually interchangeable.
(a) Install the washers (21) and the screws (20) or,
(b) Put the clamps (25) in position and install the washers (21) and the screws (20) or,
(c) Put the clamps (22) in position on the brackets (23),
- make sure that the clamps (22) are correctly installed on the brackets (23),
- tighten the clamps (22).
NOTE: On oval shaped ducts make sure that the clamp lock is in the correct position on the duct ellipse.
On the cabin riser ducts make sure that, where possible, the clamp lock is positioned on the outboard side of the duct. This will help to give sufficient clearance when you install the sidewall panels.
(4) Applicable upon the type of duct connection, On the cabin riser ducts make sure that, where possible, the clamp lock is positioned on the outboard side of the duct. This will help to give sufficient clearance when you install the sidewall panels.
NOTE: On oval shaped ducts make sure that the clamp lock is in the correct position on the duct ellipse.
On duct end connections with one coloured marking on only one duct end you must make sure that the ends of the bellows, sleeve or hose cover the coloured marking.
On duct end connections with one coloured marking on each duct end you must make sure that the ends of the bellows, sleeve or hose are between the coloured markings.
On the cabin riser ducts make sure that, where possible, the clamp lock is positioned on the outboard side of the duct. This will help to give sufficient clearance when you install the sidewall panels.
(a) Put the hose (10) and the clamp (2) in position on the duct (1) and tighten the clamp (2) or, On duct end connections with one coloured marking on only one duct end you must make sure that the ends of the bellows, sleeve or hose cover the coloured marking.
On duct end connections with one coloured marking on each duct end you must make sure that the ends of the bellows, sleeve or hose are between the coloured markings.
On the cabin riser ducts make sure that, where possible, the clamp lock is positioned on the outboard side of the duct. This will help to give sufficient clearance when you install the sidewall panels.
(b) Put the seal (5) in position between the ducts (1) and install the screws (6) and the nuts (4).
(c) Put the bellows (3) and the clamps (2) in position on the duct (1) and tighten the clamps (2) or,
(d) Put the sleeve (8) and the clamps (2) in position on the duct (1) and tighten the clamps (2).
(5) If previously installed:
(a) Apply rub coat on the duct as protection:
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 21-20-00-710-050-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | AIR COND/RECIRC FAN/R/SPLY | 3HG | W18 |
| 122VU | AIR COND/RECIRC FAN/L/SPLY | 1HG | X18 |
D. Leak Check of the Air-Conditioning Distribution Ducts
(1) Do the pre-conditioning through the LP ground connection (Ref. AMM TASK 12-33-21-618-001).
(2) Do a check for leaks at the duct connections.
5. Close-up(1) Do the pre-conditioning through the LP ground connection (Ref. AMM TASK 12-33-21-618-001).
(2) Do a check for leaks at the duct connections.
NOTE: Leaks are not allowed.
(3) Stop the pre-conditioning through the LP ground connection (Ref. AMM TASK 12-33-21-618-001). Subtask 21-20-00-410-050-A
A. Close Access
(1) For the cockpit area supply and ventilation ducts:
(a) Install the access panels as necessary (Ref. AMM TASK 25-13-41-400-001).
(2) For the cockpit riser duct on the LH side at FR13:
(a) Install the ceiling panel 221AC as necessary (Ref. AMM TASK 25-23-42-400-001).
(b) Install the lavatory (Ref. AMM TASK 25-41-41-400-001).
(3) For the supply and ventilation ducts in the avionics compartment:
(a) Install the access panels as necessary (Ref. AMM TASK 53-12-13-400-001).
(b) Close the access doors 824 811 (Ref. AMM TASK 52-41-00-410-002).
(c) Remove the ACCESS PLATFORM 2M (6 FT).
(4) Make sure that the work area is clean and clear of tools and other items.
(5) For the cabin area supply and the cargo-compartment ventilation ducts in the FWD cargo compartment area:
(a) Install the access panels as necessary (Ref. AMM TASK 25-54-12-400-001), (Ref. AMM TASK 25-54-12-400-002) or (Ref. AMM TASK 25-54-12-400-003).
(b) Close the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(c) Remove the ACCESS PLATFORM 2M (6 FT).
(6) For the cabin area supply ducts in the MID cabin and the wing box area:
(a) Install the cabin floor panels as necessary (Ref. AMM TASK 53-00-00-400-801).
(7) For the riser ducts in the cabin area:
(a) Install the upper and the lower sidewall panels as necessary (Ref. AMM TASK 25-23-43-400-001) and (Ref. AMM TASK 25-23-44-400-001).
(8) For the cabin area supply and the cargo-compartment ventilation ducts in the AFT cargo compartment area:
(a) Install the access panels as necessary (Ref. AMM TASK 25-55-11-400-001), (Ref. AMM TASK 25-55-11-400-002), (Ref. AMM TASK 25-55-11-400-003), (Ref. AMM TASK 25-55-12-400-001), (Ref. AMM TASK 25-55-12-400-002) or (Ref. AMM TASK 25-55-12-400-003).
(b) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(c) Remove the ACCESS PLATFORM 2M (6 FT).
(9) Remove the WARNING NOTICE(S).
Subtask 21-20-00-862-050-A (1) For the cockpit area supply and ventilation ducts:
(a) Install the access panels as necessary (Ref. AMM TASK 25-13-41-400-001).
(2) For the cockpit riser duct on the LH side at FR13:
(a) Install the ceiling panel 221AC as necessary (Ref. AMM TASK 25-23-42-400-001).
(b) Install the lavatory (Ref. AMM TASK 25-41-41-400-001).
(3) For the supply and ventilation ducts in the avionics compartment:
(a) Install the access panels as necessary (Ref. AMM TASK 53-12-13-400-001).
(b) Close the access doors 824 811 (Ref. AMM TASK 52-41-00-410-002).
(c) Remove the ACCESS PLATFORM 2M (6 FT).
(4) Make sure that the work area is clean and clear of tools and other items.
(5) For the cabin area supply and the cargo-compartment ventilation ducts in the FWD cargo compartment area:
(a) Install the access panels as necessary (Ref. AMM TASK 25-54-12-400-001), (Ref. AMM TASK 25-54-12-400-002) or (Ref. AMM TASK 25-54-12-400-003).
(b) Close the FWD cargo-compartment door 825 (Ref. AMM TASK 52-30-00-860-002).
(c) Remove the ACCESS PLATFORM 2M (6 FT).
(6) For the cabin area supply ducts in the MID cabin and the wing box area:
(a) Install the cabin floor panels as necessary (Ref. AMM TASK 53-00-00-400-801).
(7) For the riser ducts in the cabin area:
(a) Install the upper and the lower sidewall panels as necessary (Ref. AMM TASK 25-23-43-400-001) and (Ref. AMM TASK 25-23-44-400-001).
(8) For the cabin area supply and the cargo-compartment ventilation ducts in the AFT cargo compartment area:
(a) Install the access panels as necessary (Ref. AMM TASK 25-55-11-400-001), (Ref. AMM TASK 25-55-11-400-002), (Ref. AMM TASK 25-55-11-400-003), (Ref. AMM TASK 25-55-12-400-001), (Ref. AMM TASK 25-55-12-400-002) or (Ref. AMM TASK 25-55-12-400-003).
(b) Close the AFT cargo-compartment door 826 (Ref. AMM TASK 52-30-00-860-002).
(c) Remove the ACCESS PLATFORM 2M (6 FT).
(9) Remove the WARNING NOTICE(S).
Distribution Ducts Location