W DOC AIRBUS | AMM A320F

Removal of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59


TASK 25-55-11-000-002-A
Removal of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59


ZONE: 150
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
150
AFT CARGO COMPARTMENT FWD PRESS BULKHEAD TO AFT BULKHEAD OF AFT CARGO COMPARTMENT
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 52-30-00-860-001-A
Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump
3. Job Set-up
Subtask 25-55-11-010-051-A
DELETED
Subtask 25-55-11-010-051-B ** ON A/C NOT FOR ALL
A. Get Access
   (1) Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001).
   (2) Open the aft cargo compartment door (Ref. AMM TASK 52-30-00-860-001).
   (3) Put the ACCESS PLATFORM 2M (6 FT) in position at the opening of the aft cargo compartment door.
   (4) Set the light switch to on.
Subtask 25-55-11-865-068-A
DELETED
4. Procedure
Subtask 25-55-11-020-051-A ** ON A/C NOT FOR ALL
WARNING: USE GOGGLES AND PROTECTIVE CLOTHING WHEN YOU REMOVE, INSTALL OR TORQUE THE FASTENER. IF PARTS OF THE FASTENER RELEASE SUDDENLY, THERE IS A RISK OF INJURY.
A. Removal of the Ceiling Panels
NOTE: The removal of each ceiling panel is the same.
   (1) Hold the ceiling panels (2).
   (2) Loosen the studs (3), (4) and (7) from the ceiling panels (2).
   (3) Remove the ceiling panels (2).
Subtask 25-55-11-020-051-B ** ON A/C NOT FOR ALL
WARNING: USE GOGGLES AND PROTECTIVE CLOTHING WHEN YOU REMOVE, INSTALL OR TORQUE THE FASTENER. IF PARTS OF THE FASTENER RELEASE SUDDENLY, THERE IS A RISK OF INJURY.
A. Removal of the Ceiling Panels
NOTE: The removal of each ceiling panel is the same.
   (1) Hold the ceiling panels (2).
   (2) Loosen the studs (3), (4) and (7) from the ceiling panels (2).
   (3) Remove the ceiling panels (2).
Subtask 25-55-11-020-051-C ** ON A/C NOT FOR ALL
WARNING: USE GOGGLES AND PROTECTIVE CLOTHING WHEN YOU REMOVE, INSTALL OR TORQUE THE FASTENER. IF PARTS OF THE FASTENER RELEASE SUDDENLY, THERE IS A RISK OF INJURY.
A. Removal of the Ceiling Panels
NOTE: The removal of each ceiling panel is the same.
   (1) Hold the ceiling panels.
   (2) Remove the screws (9) from the cover (10).
   (3) Remove the cover (10) from the ceiling panels (2).
   (4) Loosen the studs (3), (4) and (7) from the ceiling panels (2).
   (5) Remove the ceiling panels (2).
   (6) Hold the bumper (6).
   (7) Remove the screws (8) and the washers (5) from the bumper (6).
   (8) Remove the bumper (6) from the ceiling panels (2).
Subtask 25-55-11-020-051-D ** ON A/C NOT FOR ALL
WARNING: USE GOGGLES AND PROTECTIVE CLOTHING WHEN YOU REMOVE, INSTALL OR TORQUE THE FASTENER. IF PARTS OF THE FASTENER RELEASE SUDDENLY, THERE IS A RISK OF INJURY.
A. Removal of the Ceiling Panels
NOTE: The removal of each ceiling panel is the same.
   (1) Hold the ceiling panels.
   (2) Loosen the studs (3), (4) and (7) from the ceiling panels (2).
   (3) Remove the ceiling panels (2).
   (4) Hold the bumper (8).
   (5) Remove the screws (10) and the washers (9) from the bumper (8).
   (6) Remove the bumper (8) from the ceiling panels (2).
[Rev.10 from 2021] 2026.03.31 23:39:19 UTC