Installation of the Fuel Recirculation Pipe
TASK 28-16-00-400-001-A
Installation of the Fuel Recirculation Pipe
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 28-16-00-941-061-A
Subtask 28-16-00-420-050-A ** ON A/C NOT FOR ALL
Subtask 28-16-00-942-056-A
[Rev.10 from 2021]
2026.04.01 06:43:25 UTC
Installation of the Fuel Recirculation Pipe
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
IF POSSIBLE, KEEP FUEL AND OIL AWAY FROM YOUR SKIN. USE PROTECTIVE CLOTHES. FUEL AND OIL CAN DRY YOUR SKIN AND CAUSE SKIN IRRITATION.
WARNING:
BEFORE YOU OPEN PHC CIRCUIT BREAKERS 2DA1(2,3), OPEN PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3). IF YOU DO NOT OBEY THIS SEQUENCE:
- THE PROBES WILL BECOME TOO HOT.
- THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03FAB1) | Mineral Oil base Grease-- Vaseline or Petrolatum - |
| (Material No.08BAA9) | Non Aqueous Cleaner-General - - |
| (Material No.14QFB1) | Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 471BL | |
| 413EL, 424AR, 424CR, 424ER, 471AL, 482AR, 482BR, 482CR | |
| 415AL, 415AR, 415BL, 425AL, 425AR, 425BL, 451BL, 451DL, 451EL, 461DL, 461EL, 481BL | |
| 413AL, 413CL, 471CL | |
| 423AR, 423CR, 471DL, 481BR, 481CR, 481DR | |
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR | |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 451AL | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 461AL | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 37 | SEAL | AIPC 28-16-06-01-120 |
| 37 | SEAL | AIPC 28-16-86-01-070 |
| 5 | SEAL | AIPC 28-16-86-01-070 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-11-28-650-003-A | Pressure Refuel with Automatic Control |
| TASK 20-21-11-911-001-A | Tightening Torques for Standard Threaded Fasteners |
| TASK 20-21-12-911-001-A | Tightening Torques for Pipe Unions (not for OXYGEN Unions) |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 26-21-41-400-001-E | Installation of the Engine Fire-Extinguisher Bottle |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-16-00-790-001-A | Leak Test of the Fuel Recirculation Cooling-System |
| TASK 28-16-00-790-002-A | Leak Test of the Fuel Recirculation Cooling-System |
| TASK 28-25-00-650-001-A | Pressure Defuel |
| TASK 28-25-00-650-003-A | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-650-003-A-01 | To Drain Remaining Fuel from the Wing Tanks and the Center Tank |
| TASK 28-25-00-869-001-A | Fuel Transfer |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-10-00-864-003-A | Depressurize the Blue Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 36-11-54-400-802-A | Installation of the Fan Air-Valve Actuator |
| TASK 54-51-21-000-802-A | Removal of the Pylon Lateral Access-Doors |
| TASK 54-51-21-400-802-A | Installation of the Pylon Lateral Access-Doors |
| TASK 54-52-11-000-002-A | Removal of the Access Panels |
| TASK 54-52-11-000-002-B | Removal of the Access Panels |
| TASK 54-52-11-400-002-A | Installation of the Access Panels |
| TASK 54-52-11-400-002-B | Installation of the Access Panels |
| TASK 54-53-11-000-002-A | Removal of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-000-002-B | Removal of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-000-804-A | Removal of the Pylon-to-Wing Access Panels and Doors |
| TASK 54-53-11-400-002-A | Installation of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-400-002-B | Installation of the Pylon-to-Wing Access Panels |
| TASK 54-53-11-400-804-A | Installation of the Pylon-to-Wing Access Panels and Doors |
| TASK 71-00-00-720-811-A | Test No. 3A - Idle Power Test |
| TASK 71-13-00-010-040-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-010-040-B | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-040-A | Closing of the Fan Cowl Doors |
| TASK 71-13-00-410-040-B | Closing of the Fan Cowl Doors |
| TASK 73-11-50-360-001-A-01 | Leak check of the Fuel Return Valve. |
| TASK 73-11-50-360-002-A | Leak Check and Functional Test of the Fuel Return Valve |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
| TASK 78-36-00-410-802-A | Closing of the Thrust Reverser Cowl-Doors |
Subtask 28-16-00-941-061-A
A. Safety Precautions
(1) Make sure that the engine (1) and (2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) Make sure that a WARNING NOTICE(S) in position is in the cockpit to tell persons not to start the engine.
(3) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off, and put a WARNING NOTICE(S) to tell persons not to use it.
(4) Make sure that the APU BLEED pushbutton switch is released (on legend OFF) and install a WARNING NOTICE(S) to tell persons not to use it.
(6) Make sure that the hydraulic safety procedure instructions are obeyed (Ref. AMM TASK 29-00-00-910-002).
Subtask 28-16-00-860-053-A (1) Make sure that the engine (1) and (2) shutdown occurred not less than 5 minutes before you do this procedure.
(2) Make sure that a WARNING NOTICE(S) in position is in the cockpit to tell persons not to start the engine.
(3) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off, and put a WARNING NOTICE(S) to tell persons not to use it.
(4) Make sure that the APU BLEED pushbutton switch is released (on legend OFF) and install a WARNING NOTICE(S) to tell persons not to use it.
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
(5) Make sure that the fuel safety procedure instructions are obeyed (Ref. AMM TASK 28-00-00-910-001). (6) Make sure that the hydraulic safety procedure instructions are obeyed (Ref. AMM TASK 29-00-00-910-002).
B. Aircraft Maintenance Configuration
(1) Make sure that the applicable aircraft wing-tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-10-00-864-001) (Ref. AMM TASK 29-10-00-864-002) (Ref. AMM TASK 29-10-00-864-003).
(4) Make sure that the hydraulic reservoirs are depressurized (Ref. AMM TASK 29-14-00-614-001).
Subtask 28-16-00-865-060-A (1) Make sure that the applicable aircraft wing-tank is defueled (Ref. AMM TASK 28-25-00-650-001).
(2) Make sure that the remaining fuel has been drained from the applicable fuel tank (Ref. AMM TASK 28-25-00-650-003).
(3) Make sure that the hydraulic systems are depressurized
(Ref. AMM TASK 29-10-00-864-001) (Ref. AMM TASK 29-10-00-864-002) (Ref. AMM TASK 29-10-00-864-003).
(4) Make sure that the hydraulic reservoirs are depressurized (Ref. AMM TASK 29-14-00-614-001).
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 28-16-00-010-058-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | ENGINE/2/HP FUEL SOV | 1KC2 | A02 |
| 49VU | ENGINE/1/HP FUEL SOV | 1KC1 | A01 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 122VU | ANTI ICE/ENG/2 | 1DN2 | W10 |
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
D. Get Access
(1) Make sure that an access platform is in position:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Make sure that the access doors are opened:
(a) For the left pylon:
Subtask 28-16-00-010-058-B ** ON A/C NOT FOR ALL (1) Make sure that an access platform is in position:
- for the left pylon at zone 410
- for the right pylon at zone 420.
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Make sure that the access doors are opened:
(a) For the left pylon:
- 413AL, 413CL, 413EL, 471AL, 471BL and 471CL (Ref. AMM TASK 54-52-11-000-002) (Ref. AMM TASK 54-53-11-000-002).
D. Get Access
(1) Make sure that an access platform is in position:
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Make sure that the access doors are opened:
(a) For the left pylon:
Subtask 28-16-00-010-058-C ** ON A/C NOT FOR ALL (1) Make sure that an access platform is in position:
- for the left pylon at zone 410
- for the right pylon at zone 420.
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Make sure that the access doors are opened:
(a) For the left pylon:
- 413AL, 413CL, 471BL, 471CL and 471DL (Ref. AMM TASK 54-52-11-000-002) (Ref. AMM TASK 54-53-11-000-002).
D. Get Access
(1) Make sure that an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position:
(a) For the left pylon:
(b) For the right pylon:
(3) Make sure that the thrust reverser cowl-doors opened: (Ref. AMM TASK 78-36-00-010-802)
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
4. Procedure(1) Make sure that an ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position:
- For the left pylon at zone 410
- For the right pylon at zone 420.
(a) For the left pylon:
(b) For the right pylon:
(3) Make sure that the thrust reverser cowl-doors opened: (Ref. AMM TASK 78-36-00-010-802)
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
Subtask 28-16-00-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the Fuel Recirculation Pipe
(a) Clean the external surface of the fuel recirculation pipes and the adjacent area with Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(b) Do a visual inspection of the pipe assemblies (13) and (5), they must not be in the blocked condition.
(2) Remove the PLUG-BLANKING from each disconnected line end.
(3) To install the pipe assembly (13), do the steps that follow:
(a) Put the pipe assembly (13) in the position between RIB5 and RIB9.
(b) Install the bushes (31) in the clamps (30).
(c) Install the pipe assembly (13) in the clamps (30).
(d) Install the tube coupling nut (17) on the pipe assembly (13).
(e) TORQUE the coupling nut (17) to between 37 and 30 m.N (27.29 and 22.12 lbf.ft )
.
(f) Use the PIN - LOCKING and install the locking pin (16) on the tube coupling nut (17).
(g) Install the washers (29) and the bolts (28) on the clamps (30).
(h) TORQUE the bolts (28) to between 4.64 and 3.87 m.daN (34.22 and 28.54 lbf.ft )
.
(i) Install the inserts (24) and the cleat-half (25).
(j) Install the angle (19) on the cleat-half (25).
(k) Install the bolts (20) and the nuts (23).
(l) TORQUE the nuts (23) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(m) Install the washer (26) and the bolt (27).
(n) TORQUE the bolt (27) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
.
(o) Install the washer (22) and the bolt (21).
(p) TORQUE the bolt (21) to between 3.87 and 3.22 m.daN (28.54 and 23.75 lbf.ft )
.
(q) Install the washers (11) and the bolts (12).
(r) TORQUE the bolts (12) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
.
(4) To install the pipe assembly (5), do the steps that follow:
(a) Put the pipe assembly (5) in the position between RIB9 and RIB6.
(b) Connect the pipe assembly (5) to the pipe assembly (13).
(c) Install the bush (31) in the clamp (34).
(d) Install the pipe assembly (5) in the clamp (34).
(e) Apply Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) on the new seal (37).
(f) Install the washer (6) and the bolt (7).
(g) TORQUE the bolt (7) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
.
(h) Install the washer (15) and the bolt (14).
(i) TORQUE the bolt (14) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
.
(j) Attach the bonding lead (8) to the pipe assembly (5) with the washer (9) and the bolt (10) (Ref. AMM TASK 20-28-00-912-802).
(k) TORQUE the bolt (10) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
.
(l) Install the AIPC 28-16-86-01-070 SEAL (37) or AIPC 28-16-06-01-120 SEAL (37), the washers (38), the bolts (39) and the plates (36) to the check valve (35).
(m) TORQUE the bolts (39) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(n) Install the clamp (34) with the washers (33) and the bolts (32) on the pipe assembly (5).
(o) TORQUE the bolts (32) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
(p) Attach the clamp (18) to the pipe assembly (5) with the bonding lead (1), washer (3), bolt (2) and nut (4) (Ref. AMM TASK 20-28-00-912-802).
(q) TORQUE the nut (4) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
Subtask 28-16-00-420-050-B ** ON A/C NOT FOR ALL NOTE: This procedure is applicable to the left pylon. Data between parentheses are for the right pylon.
(1) Prepare the pipe assemblies (13) and (5) for the installation as follows: (a) Clean the external surface of the fuel recirculation pipes and the adjacent area with Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(b) Do a visual inspection of the pipe assemblies (13) and (5), they must not be in the blocked condition.
(2) Remove the PLUG-BLANKING from each disconnected line end.
(3) To install the pipe assembly (13), do the steps that follow:
(a) Put the pipe assembly (13) in the position between RIB5 and RIB9.
(b) Install the bushes (31) in the clamps (30).
(c) Install the pipe assembly (13) in the clamps (30).
(d) Install the tube coupling nut (17) on the pipe assembly (13).
(e) TORQUE the coupling nut (17) to between 37 and 30 m.N (27.29 and 22.12 lbf.ft )
. (f) Use the PIN - LOCKING and install the locking pin (16) on the tube coupling nut (17).
(g) Install the washers (29) and the bolts (28) on the clamps (30).
(h) TORQUE the bolts (28) to between 4.64 and 3.87 m.daN (34.22 and 28.54 lbf.ft )
. (i) Install the inserts (24) and the cleat-half (25).
(j) Install the angle (19) on the cleat-half (25).
(k) Install the bolts (20) and the nuts (23).
(l) TORQUE the nuts (23) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (m) Install the washer (26) and the bolt (27).
(n) TORQUE the bolt (27) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
. (o) Install the washer (22) and the bolt (21).
(p) TORQUE the bolt (21) to between 3.87 and 3.22 m.daN (28.54 and 23.75 lbf.ft )
. (q) Install the washers (11) and the bolts (12).
(r) TORQUE the bolts (12) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
. (4) To install the pipe assembly (5), do the steps that follow:
(a) Put the pipe assembly (5) in the position between RIB9 and RIB6.
(b) Connect the pipe assembly (5) to the pipe assembly (13).
(c) Install the bush (31) in the clamp (34).
(d) Install the pipe assembly (5) in the clamp (34).
(e) Apply Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) on the new seal (37).
(f) Install the washer (6) and the bolt (7).
(g) TORQUE the bolt (7) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
. (h) Install the washer (15) and the bolt (14).
(i) TORQUE the bolt (14) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
. (j) Attach the bonding lead (8) to the pipe assembly (5) with the washer (9) and the bolt (10) (Ref. AMM TASK 20-28-00-912-802).
(k) TORQUE the bolt (10) to between 0.37 and 0.28 m.daN (32.74 and 24.78 lbf.in )
. (l) Install the AIPC 28-16-86-01-070 SEAL (37) or AIPC 28-16-06-01-120 SEAL (37), the washers (38), the bolts (39) and the plates (36) to the check valve (35).
(m) TORQUE the bolts (39) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (n) Install the clamp (34) with the washers (33) and the bolts (32) on the pipe assembly (5).
(o) TORQUE the bolts (32) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. (p) Attach the clamp (18) to the pipe assembly (5) with the bonding lead (1), washer (3), bolt (2) and nut (4) (Ref. AMM TASK 20-28-00-912-802).
(q) TORQUE the nut (4) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. A. Installation of the pipe assembly
(1) Preparation for Installation
(a) Clean the external surface of the fuel recirculation pipe and the adjacent area with Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(b) Do a visual inspection of the pipe assembly. It must not be blocked.
(2) Remove the PLUG-BLANKING from each disconnected line end.
(3) Do the steps that follow to install the pipe assembly (2):
(a) Put the pipe assembly (2) in position between RIB 1 and 6.
(b) Make sure that the pipe assembly (2) is in correct position and aligned correctly.
(c) Install the washers (12) and the bolts (11).
(d) Retract the shroud and carefully connect the pipe assembly (2) to the union (17) (Ref. AMM TASK 20-21-12-911-001).
(e) TORQUE the clamp (18) to between 0.31 and 0.25 m.daN (27.43 and 22.12 lbf.in )
.
(f) Install the clamps (16) with the bolts (13) and (14) and the washers (15).
(g) Tighten the bolts (11) (Ref. AMM TASK 20-21-11-911-001).
(h) Tighten the bolts (13) and (14) (Ref. AMM TASK 20-21-11-911-001).
(i) Install the bracket (21) with the bolts (19) and (23) and the nuts (20) and (22).
(j) Tighten the nuts (20) and (22) (Ref. AMM TASK 20-21-11-911-001).
(k) Install the ENG1 (ENG2) fan air valve-actuator (Ref. AMM TASK 36-11-54-400-802).
(l) Install the engine fire-extinguisher bottle (Ref. AMM TASK 26-21-41-400-001).
(4) Do the steps that follow to install the pipe assembly (1):
(a) Put the pipe assembly (1) in position between RIB 6 and 7.
(b) Make sure that the pipe assembly (1) is in correct position and aligned correctly.
(c) Apply Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) to the new seal (5).
(d) Install the bolts (3), the washers (4), the AIPC 28-16-86-01-070 SEAL (5) and the plates (6) to the check valve (7).
(e) Connect the pipe assembly (1) to the pipe assembly (2) (Ref. AMM TASK 20-21-12-911-001).
(f) Attach the bonding leads (8) to the pipe assembly (1) with the bolts (10) and the washers (9) (Ref. AMM TASK 20-28-00-912-802).
(g) Tighten the bolts (3) (Ref. AMM TASK 20-21-11-911-001).
14QFB1 Wire-Locking Dia: 0.8 mm CRES Nickel Alloy - .
Subtask 28-16-00-865-061-A (1) Preparation for Installation
(a) Clean the external surface of the fuel recirculation pipe and the adjacent area with Textile-Lint free Cotton - (Material No.14SBA1) made moist with Non Aqueous Cleaner-General - - (Material No.08BAA9) .
(b) Do a visual inspection of the pipe assembly. It must not be blocked.
(2) Remove the PLUG-BLANKING from each disconnected line end.
(3) Do the steps that follow to install the pipe assembly (2):
(a) Put the pipe assembly (2) in position between RIB 1 and 6.
(b) Make sure that the pipe assembly (2) is in correct position and aligned correctly.
(c) Install the washers (12) and the bolts (11).
(d) Retract the shroud and carefully connect the pipe assembly (2) to the union (17) (Ref. AMM TASK 20-21-12-911-001).
(e) TORQUE the clamp (18) to between 0.31 and 0.25 m.daN (27.43 and 22.12 lbf.in )
. (f) Install the clamps (16) with the bolts (13) and (14) and the washers (15).
(g) Tighten the bolts (11) (Ref. AMM TASK 20-21-11-911-001).
(h) Tighten the bolts (13) and (14) (Ref. AMM TASK 20-21-11-911-001).
(i) Install the bracket (21) with the bolts (19) and (23) and the nuts (20) and (22).
(j) Tighten the nuts (20) and (22) (Ref. AMM TASK 20-21-11-911-001).
(k) Install the ENG1 (ENG2) fan air valve-actuator (Ref. AMM TASK 36-11-54-400-802).
(l) Install the engine fire-extinguisher bottle (Ref. AMM TASK 26-21-41-400-001).
(4) Do the steps that follow to install the pipe assembly (1):
(a) Put the pipe assembly (1) in position between RIB 6 and 7.
(b) Make sure that the pipe assembly (1) is in correct position and aligned correctly.
(c) Apply Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) to the new seal (5).
(d) Install the bolts (3), the washers (4), the AIPC 28-16-86-01-070 SEAL (5) and the plates (6) to the check valve (7).
(e) Connect the pipe assembly (1) to the pipe assembly (2) (Ref. AMM TASK 20-21-12-911-001).
(f) Attach the bonding leads (8) to the pipe assembly (1) with the bolts (10) and the washers (9) (Ref. AMM TASK 20-28-00-912-802).
(g) Tighten the bolts (3) (Ref. AMM TASK 20-21-11-911-001).
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
(h) Safety the bolts (3) and (10) with B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 28-16-00-410-057-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | ENGINE/2/HP FUEL SOV | 1KC2 | A02 |
| 49VU | ENGINE/1/HP FUEL SOV | 1KC1 | A01 |
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 49VU | ANTI ICE/PROBES/PHC/1 | 2DA1 | D03 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N30 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/HYD POWER/Y | 3803GX | N31 |
| ** ON A/C ALL | |||
| 122VU | ANTI ICE/ENG/2 | 1DN2 | W10 |
| 122VU | ANTI ICE/PROBES/PHC/3 | 2DA3 | Y16 |
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/PHC/2 | 2DA2 | Y12 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| 123VU | Y HYD/ELEC/PUMP | 3802GX | AB06 |
| 123VU | Y HYD/ELEC/ELEC PUMP/NORM | 3801GX | AB03 |
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Close the access doors:
(a) For the left pylon:
Subtask 28-16-00-410-057-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Close the access doors:
(a) For the left pylon:
- 413AL, 413CL, 413EL, 471AL, 471BL and 471CL (Ref. AMM TASK 54-52-11-400-002) (Ref. AMM TASK 54-53-11-400-002).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Close the access doors:
(a) For the left pylon:
Subtask 28-16-00-410-057-C ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-040):
(a) FOR [1000EM1] (ENGINE-1)
(b) FOR [1000EM2] (ENGINE-2)
(3) Close the access doors:
(a) For the left pylon:
- 413AL, 413CL, 471BL, 471CL and 471DL (Ref. AMM TASK 54-52-11-400-002) (Ref. AMM TASK 54-53-11-400-002).
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors: (Ref. AMM TASK 78-36-00-410-802)
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
(3) Close the access doors:
(a) For the left pylon:
Subtask 28-16-00-710-051-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser cowl-doors: (Ref. AMM TASK 78-36-00-410-802)
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
(3) Close the access doors:
(a) For the left pylon:
- 471BL, 415AR, 415AL, 451DL, 451EL and 415BL (Ref. AMM TASK 54-51-21-400-802) (Ref. AMM TASK 54-53-11-400-804).
D. Test
(1) Do a leak check of the applicable check valve (Ref. AMM TASK 73-11-50-360-002). No leaks are permitted.
Subtask 28-16-00-710-051-B ** ON A/C NOT FOR ALL (1) Do a leak check of the applicable check valve (Ref. AMM TASK 73-11-50-360-002). No leaks are permitted.
D. Test
(1) Do a leak check of the applicable check valve (Ref. AMM TASK 73-11-50-360-001). No leaks are permitted.
Subtask 28-16-00-710-051-C ** ON A/C NOT FOR ALL (1) Do a leak check of the applicable check valve (Ref. AMM TASK 73-11-50-360-001). No leaks are permitted.
D. Test
(1) Do a leak check of the applicable check valve (Ref. AMM TASK 28-16-00-790-001). No leaks are permitted.
Subtask 28-16-00-710-051-E ** ON A/C NOT FOR ALL (1) Do a leak check of the applicable check valve (Ref. AMM TASK 28-16-00-790-001). No leaks are permitted.
D. Leak Test
(1) Do a leak test of the pylon fuel return-pipe and the check valves (Ref. AMM TASK 71-00-00-720-811). No leaks are permitted.
Subtask 28-16-00-710-051-I ** ON A/C NOT FOR ALL (1) Do a leak test of the pylon fuel return-pipe and the check valves (Ref. AMM TASK 71-00-00-720-811). No leaks are permitted.
D. Leak Test
(1) Do a leak check of the applicable check valve (Ref. AMM TASK 28-16-00-790-002):
(a) Make sure that there are no leaks.
Subtask 28-16-00-650-054-A (1) Do a leak check of the applicable check valve (Ref. AMM TASK 28-16-00-790-002):
(a) Make sure that there are no leaks.
E. Fuel Configuration
(1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
5. Close-up(1) Refuel, defuel or transfer fuel as necessary (Ref. AMM TASK 12-11-28-650-003), (Ref. AMM TASK 28-25-00-650-001) or (Ref. AMM TASK 28-25-00-869-001).
Subtask 28-16-00-942-056-A
A. Removal of Equipment
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the safety barriers.
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.