W DOC AIRBUS | AMM A320F

Installation of the Fan Air-Valve Actuator


TASK 36-11-54-400-802-A
Installation of the Fan Air-Valve Actuator


WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING: ALWAYS USE APPLICABLE GLOVES TO TOUCH HOT PARTS. HOT PARTS CAN CAUSE INJURY TO PERSONS.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 415
ZONE: 425
FIN: 9HA1 ** ON A/C NOT FOR ALL
FIN: 9HA2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.38 and 0.31 m.daN (33.63 and 27.43 lbf.in ) T
No specific
Torque wrench: range to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in ) T
No specific
Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
415
LOWER PYLON
425
LOWER PYLON
191DB
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR, 452AR
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR, 462AR
FOR [9HA1] (VALVE-FAN AIR, ENG1)
415AR
FOR [9HA2] (VALVE-FAN AIR, ENG2)
425AR
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 20-23-22-910-001-A
Marking of the Unions after Application of Standard or Specific Tightening Torque
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 36-11-00-740-802-A
BITE Test of the Engine Bleed Air System (EBAS) (System Test)
TASK 49-00-00-860-009-A
APU Shutdown by External Power (131-9(A))
TASK 49-00-00-860-009-A-01
APU Shutdown by Batteries (131-9(A))
TASK 54-51-21-000-802-A
Removal of the Pylon Lateral Access-Doors
TASK 54-51-21-400-802-A
Installation of the Pylon Lateral Access-Doors
TASK 71-00-00-860-833-A
Procedure to Prevent Engine Motoring
TASK 71-13-00-010-802-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-802-A
Closing of the Fan Cowl Doors
TASK 78-30-00-040-805-A
Deactivation of the Thrust Reverser System for Ground Maintenance
TASK 78-30-00-440-805-A
Reactivation of the Thrust Reverser System after Ground Maintenance
TASK 78-36-00-010-802-A
Opening of the Thrust Reverser Cowl-Doors
TASK 78-36-00-410-802-A
Closing of the Thrust Reverser Cowl-Doors
3. Job Set-up
Subtask 36-11-54-860-054-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
   (2) On AIR COND panel 30VU:
     (a) Make sure that the ENG 1(2) BLEED pushbutton-switch is released (OFF legend on).
     (b) Make sure that the APU BLEED pushbutton-switch is released (ON legend off).
     (c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
   (3) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
   (4) On access door 191DB, on the HP ground connector:
     (a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
Subtask 36-11-54-865-065-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 2/MONG3HA2D12
49VUAIR BLEED/ENG 1/CTL2HA1D11
122VUAIR BLEED/ENG 1/MONG3HA1Z23
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 36-11-54-010-073-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR
   (2) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position.
   (3) Make sure that the right thrust-reverser cowl-door is open (Ref. AMM TASK 78-36-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
   (4) Make sure that the access door is removed (Ref. AMM TASK 54-51-21-000-802):
     (a) FOR [9HA1] (VALVE-FAN AIR, ENG1)
415AR
     (b) FOR [9HA2] (VALVE-FAN AIR, ENG2)
425AR
Subtask 36-11-54-040-062-A ** ON A/C NOT FOR ALL
D. Make sure that you did the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-805).
4. Procedure
Subtask 36-11-54-420-061-B ** ON A/C NOT FOR ALL
A. Installation of the Fan Air-Valve Actuator
   (1) If you use the APU to energize the electrical circuits, stop the APU:
   (2) In the cockpit, on the SD bleed page:
     (a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING: MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING: DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
   (3) Do an inspection of the component interfaces and the adjacent area.
   (4) Clean the component interfaces and the adjacent area.
   (5) Use the locator pins (6) to put the actuator (5) in position in the support bracket (2).
   (6) Close the clamps (3) and tighten the nut (4).
   (7) TORQUE the nut (4) to between 1.06 and 0.82 m.daN (93.81 and 72.57 lbf.in ) T.
   (8) Identify the tightened union nut (4) with a red line (
Ref. AMM TASK 20-23-22-910-001).
   (9) Put the rod (1) in position on the actuator (5) and install the screw (10).
   (10) TORQUE the screw (10) to between 0.38 and 0.31 m.daN (33.63 and 27.43 lbf.in ) T maximum.
   (11) Remove the PLUG-BLANKING from each disconnected line end.
   (12) Connect the sense line (7) to the actuator (5).
   (13) TORQUE the nut of the sense line (7) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
T.
   (14) Identify the tightened union nut of the sense line (7) with a red line (
Ref. AMM TASK 20-23-22-910-001).
   (15) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (16) Make sure that all the electrical connections are clean and in the correct condition.
   (17) Connect the electrical connector (9) to the electrical connector receptacle (8).
Subtask 36-11-54-865-066-A ** ON A/C NOT FOR ALL
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUAIR BLEED/ENG 2/MONG3HA2D12
49VUAIR BLEED/ENG 1/CTL2HA1D11
122VUAIR BLEED/ENG 1/MONG3HA1Z23
122VUAIR BLEED/ENG 2/CTL2HA2Z22
Subtask 36-11-54-740-050-A ** ON A/C NOT FOR ALL
C. Do the BITE test of the Engine Bleed-Air-System Application (Ref. AMM TASK 36-11-00-740-802).
5. Close-up
Subtask 36-11-54-410-069-B ** ON A/C NOT FOR ALL
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the related access door (Ref. AMM TASK 54-51-21-400-802):
     (a) FOR [9HA1] (VALVE-FAN AIR, ENG1)
415AR
     (b) FOR [9HA2] (VALVE-FAN AIR, ENG2)
425AR
   (3) Close the right thrust-reverser cowl-door (Ref. AMM TASK 78-36-00-410-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
Subtask 36-11-54-440-059-A ** ON A/C NOT FOR ALL
B. Do the reactivation of the thrust reverser system after maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 36-11-54-410-070-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).
Subtask 36-11-54-862-059-A ** ON A/C NOT FOR ALL
D. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
[Rev.10 from 2021] 2026.04.01 01:13:36 UTC