Operational Check of PTU In-Flight Inhibition Logic
TASK 29-23-00-710-006-A
Operational Check of PTU In-Flight Inhibition Logic
Refer to the MPD TASK: 291000-19
OPERATIONAL CHECK OF PTU IN-FLIGHT INHIBITION LOGIC
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 29-23-00-860-064-A
Subtask 29-23-00-710-055-B ** ON A/C NOT FOR ALL
Subtask 29-23-00-865-065-A
[Rev.10 from 2021]
2026.04.01 00:26:44 UTC
Operational Check of PTU In-Flight Inhibition Logic
CAUTION:
ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY SERVICEABLE).
WHEN YOU DO MAINTENANCE WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:
1. Reason for the Job- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC. AS NECESSARY ON WIRING AND COMPONENTS.
- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND OTHER CONTAMINATION
Refer to the MPD TASK: 291000-19
OPERATIONAL CHECK OF PTU IN-FLIGHT INHIBITION LOGIC
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ALT29000001 | 1 | HYD GRND PWR UNIT3000 |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 196 | HYDRAULIC COMPT AND FAIRINGS |
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 734 | MAIN DOOR |
| 744 | MAIN DOOR |
| 196BB |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 12-12-29-611-002-A | Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-24-00-863-001-A | Pressurize the Yellow Hydraulic System with the Electric Pump |
| TASK 29-24-00-864-001-A | Depressurize the Yellow Hydraulic System |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 53-35-13-000-002-A | Removal of the Quick-Release Access Panels from the Belly Fairing Structure |
| TASK 53-35-13-400-002-A | Installation of the Quick-Release Access Panels on the Belly Fairing Structure |
| TASK 73-25-34-000-040-A | Removal of the Engine Interface Unit (EIU) |
| TASK 73-25-34-000-040-B | Removal of the Engine Interface Unit (EIU) |
| TASK 73-25-34-000-041-A | Removal of the Engine Interface Unit (EIU) |
| TASK 73-25-34-400-040-A | Installation of the Engine Interface Unit (EIU) |
| TASK 73-25-34-400-040-B | Installation of the Engine Interface Unit (EIU) |
| TASK 73-25-34-400-041-A | Installation of the Engine Interface Unit (EIU) |
Subtask 29-23-00-860-064-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) In the cockpit, make sure that the parking brake is in the OFF position.
(3) At the Nose Landing Gear (NLG), make sure that the towing lever is not in the tow position.
(4) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(5) On the ECAM control panel, push the HYD key. Make sure that the HYD page comes into view on the ECAM lower DU.
(6) Make sure that the ECAM does not show the warnings that follow:
(8) If necessary, add fluid to the applicable hydraulic reservoirs (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
Subtask 29-23-00-010-053-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) In the cockpit, make sure that the parking brake is in the OFF position.
(3) At the Nose Landing Gear (NLG), make sure that the towing lever is not in the tow position.
(4) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(5) On the ECAM control panel, push the HYD key. Make sure that the HYD page comes into view on the ECAM lower DU.
(6) Make sure that the ECAM does not show the warnings that follow:
- Low air pressure in the Green and Yellow hydraulic reservoirs
- Low fluid level in the Green and Yellow hydraulic reservoirs.
(8) If necessary, add fluid to the applicable hydraulic reservoirs (Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
B. Get Access
(1) Open the main landing-gear doors (Ref. AMM TASK 32-12-00-010-001).
(2) Open access panel 196BB (Ref. AMM TASK 53-35-13-000-002).
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position to get access to the avionics compartment.
(4) Do Flight Configuration Precautions with Electrical Power (Ref. AMM TASK 32-00-00-860-001).
(5) Remove the Engine Interface Units (EIUs):
(a) Remove the EIU (1KS1) (Ref. AMM TASK 73-25-34-000-040).
(b) Remove the EIU (1KS2) (Ref. AMM TASK 73-25-34-000-040).
Subtask 29-23-00-010-053-C ** ON A/C NOT FOR ALL (1) Open the main landing-gear doors (Ref. AMM TASK 32-12-00-010-001).
(2) Open access panel 196BB (Ref. AMM TASK 53-35-13-000-002).
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position to get access to the avionics compartment.
(4) Do Flight Configuration Precautions with Electrical Power (Ref. AMM TASK 32-00-00-860-001).
(5) Remove the Engine Interface Units (EIUs):
(a) Remove the EIU (1KS1) (Ref. AMM TASK 73-25-34-000-040).
(b) Remove the EIU (1KS2) (Ref. AMM TASK 73-25-34-000-040).
NOTE: Removal of the EIUs can cause a EIU fault message on the SD during the test. This is permitted.
B. Get Access
(1) Open the main landing-gear doors (Ref. AMM TASK 32-12-00-010-001).
(2) Open access panel 196BB (Ref. AMM TASK 53-35-13-000-002).
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position to get access to the avionics compartment.
(4) Do Flight Configuration Precautions with Electrical Power (Ref. AMM TASK 32-00-00-860-001).
Subtask 29-23-00-010-053-H ** ON A/C NOT FOR ALL (1) Open the main landing-gear doors (Ref. AMM TASK 32-12-00-010-001).
(2) Open access panel 196BB (Ref. AMM TASK 53-35-13-000-002).
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position to get access to the avionics compartment.
(4) Do Flight Configuration Precautions with Electrical Power (Ref. AMM TASK 32-00-00-860-001).
B. Get Access
(1) Open the main landing-gear doors (Ref. AMM TASK 32-12-00-010-001).
(2) Open access panel 196BB (Ref. AMM TASK 53-35-13-000-002).
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position to get access to the avionics compartment.
(4) Do Flight Configuration Precautions with Electrical Power (Ref. AMM TASK 32-00-00-860-001).
(5) Remove the Engine Interface Units (EIUs):
(a) Remove the EIU (1KS1) (Ref. AMM TASK 73-25-34-000-041).
(b) Remove the EIU (1KS2) (Ref. AMM TASK 73-25-34-000-041).
Subtask 29-23-00-865-062-A (1) Open the main landing-gear doors (Ref. AMM TASK 32-12-00-010-001).
(2) Open access panel 196BB (Ref. AMM TASK 53-35-13-000-002).
(3) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position to get access to the avionics compartment.
(4) Do Flight Configuration Precautions with Electrical Power (Ref. AMM TASK 32-00-00-860-001).
(5) Remove the Engine Interface Units (EIUs):
(a) Remove the EIU (1KS1) (Ref. AMM TASK 73-25-34-000-041).
(b) Remove the EIU (1KS2) (Ref. AMM TASK 73-25-34-000-041).
NOTE: Removal of the EIUs can cause a EIU fault message on the SD during the test. This is permitted.
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 29-23-00-865-064-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R33 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/SOL VALVES/G/Y/PTU | 1801GL | N34 |
| 121VU | HYDRAULIC/Y HYD/PUMP ENG2/MONG | 3700GD | Q37 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R32 |
D. Open, safety and tag this(these) circuit breaker(s):
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | PTU INHIT/Y SYS | 1808GL | Q33 |
| 121VU | PTU INHIT/G SYS | 1807GL | Q32 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC / PTU FLT INHIB | 1825GL | Q31 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC-PTU FLT INHIT | 1825GL | Q32 |
| ** ON A/C ALL | |||
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
Subtask 29-23-00-710-055-B ** ON A/C NOT FOR ALL
A. Operational Check of PTU Inhibition Logic of the Yellow Hydraulic System
CAUTION :
WHEN A HYDRAULIC GROUND POWER-SUPPLY OR GROUND CART IS USED, ITS HYDRAULIC FLOW FUNCTION MUST BE LIMITED TO A MAXIMUM OF 50 LITERS PER MINUTE AT NOMINAL PRESSURE (3000 PSI). THIS WILL PREVENT DAMAGE TO THE PTU WHEN STARTING AT HIGH PRESSURE.
(1) Use the ALT29000001 HYD GRND PWR UNIT3000 and do the test that follows:
Subtask 29-23-00-710-055-D ** ON A/C NOT FOR ALL CAUTION :
WHEN A HYDRAULIC GROUND POWER-SUPPLY OR GROUND CART IS USED, ITS HYDRAULIC FLOW FUNCTION MUST BE LIMITED TO A MAXIMUM OF 50 LITERS PER MINUTE AT NOMINAL PRESSURE (3000 PSI). THIS WILL PREVENT DAMAGE TO THE PTU WHEN STARTING AT HIGH PRESSURE.
(1) Use the ALT29000001 HYD GRND PWR UNIT3000 and do the test that follows:
| ACTION | RESULT |
|---|---|
1.On panel 85VU:
| |
2.On panel 86VU:
| |
3.On panel 121VU:
NOTE: Intermittent illumination of the PTU FAULT light can occur during this test and is permitted. Also FAULT messages shown for less than two seconds can be ignored. THE FAULT starts continuous less than 2 seconds are thought as temporary. |
|
4.Do a check of the Yellow hydraulic system:
| On the ECAM lower DU:
|
5.On panel 121VU:
| On the ECAM lower DU:
|
6.On the HP manifold of the Yellow hydraulic system:
| On the ECAM lower DU:
|
7.On the HP manifold of the Yellow hydraulic system:
| On the ECAM lower DU:
|
8.On the HP manifold of the Yellow hydraulic system:
| On the ECAM lower DU:
|
9.On the HP manifold of the Yellow hydraulic system:
| On the panel 40VU:
|
| 10.After a minimum of 6 seconds. | On the ECAM lower DU:
|
11.On panel 121VU:
| Simulated in flight condition with aircraft on ground is stopped. |
| 12.After a minimum of 20 seconds. | On the ECAM lower DU:
|
| | On panel 40VU:
|
13.On panel 121VU:
|
|
| 14.After a minimum of 6 seconds. | On panel 40VU:
|
| | On the ECAM lower DU:
|
15.On the HP manifold of the Yellow hydraulic system:
| On panel 40VU:
|
| 16.After a minimum of 20 seconds. | On the ECAM lower DU:
|
17.On the HP manifold of the Yellow hydraulic system:
| On panel 40VU:
|
| 18.After a minimum of 6 seconds. | On the ECAM lower DU:
|
19.On the HP manifold of the Yellow hydraulic system:
| On panel 40VU:
|
| 20.After a minimum of 20 seconds. | On the ECAM lower DU:
|
21.On the HP manifold of the Yellow hydraulic system:
| On the ECAM lower DU:
|
| | On panel 40VU:
|
22.On panel 121VU:
|
|
23.On panel 85VU:
| |
A. Operational Check of PTU Inhibition Logic
CAUTION :
WHEN A HYDRAULIC GROUND POWER-SUPPLY OR GROUND CART IS USED, ITS HYDRAULIC FLOW FUNCTION MUST BE LIMITED TO A MAXIMUM OF 50 LITERS PER MINUTE AT NOMINAL PRESSURE (3000 PSI). THIS WILL PREVENT DAMAGE TO THE PTU WHEN STARTING AT HIGH PRESSURE.
(1) Use the ALT29000001 HYD GRND PWR UNIT3000 and do the test that follows:
Subtask 29-23-00-710-056-B ** ON A/C NOT FOR ALL CAUTION :
WHEN A HYDRAULIC GROUND POWER-SUPPLY OR GROUND CART IS USED, ITS HYDRAULIC FLOW FUNCTION MUST BE LIMITED TO A MAXIMUM OF 50 LITERS PER MINUTE AT NOMINAL PRESSURE (3000 PSI). THIS WILL PREVENT DAMAGE TO THE PTU WHEN STARTING AT HIGH PRESSURE.
(1) Use the ALT29000001 HYD GRND PWR UNIT3000 and do the test that follows:
| ACTION | RESULT |
|---|---|
1.Do a check of the Yellow hydraulic system:
| On the ECAM lower DU:
|
2.On panel 121VU:
NOTE: Intermittent illumination of the PTU FAULT light can occur during this test and is permitted. Also FAULT messages shown for less than two seconds can be ignored. THE FAULT starts continuous less than 2 seconds are thought as temporary. |
|
3.On panel 121VU:
| On the ECAM lower DU:
|
4.On the High Pressure (HP) manifold of the Yellow hydraulic system:
| On the ECAM lower DU:
|
5.On the HP manifold of the Yellow hydraulic system:
| On the ECAM lower DU:
|
6.On the HP manifold of the Yellow hydraulic system:
| On the ECAM lower DU:
|
7.On the HP manifold of the Yellow hydraulic system:
| |
| 8.After a minimum of 6 seconds. | On panel 40VU:
|
9.On panel 121VU:
| Simulated in flight condition with aircraft on ground is stopped. On panel 40VU:
|
| 10.After a minimum of 20 seconds. | On the ECAM lower DU:
|
11.On panel 121VU:
|
|
| 12.After a minimum of 6 seconds. | On panel 40VU:
|
13.On the HP manifold of the Yellow hydraulic system:
| On panel 40VU:
|
| 14.After a minimum of 20 seconds. | On the ECAM lower DU:
|
15.On the HP manifold of the Yellow hydraulic system:
| |
| 16.After a minimum of 6 seconds. | On panel 40VU:
|
17.On the HP manifold of the Yellow hydraulic system:
| On panel 40VU:
|
| 18.After a minimum of 20 seconds. | On the ECAM lower DU:
|
19.On the HP manifold of the Yellow hydraulic system:
| On the ECAM lower DU:
|
| 20.Pressurize the Yellow hydraulic system with the electrical pump (Ref. AMM TASK 29-24-00-863-001). NOTE: Do not start the electrical pump from the cargo door panel. Use the ELEC PUMP P/BSW on panel 40VU. | On the ECAM lower DU:
|
21.On the HP manifold of the Green hydraulic system:
| |
22.On panel 40VU:
| |
| 23.Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001). | On the ECAM lower DU:
|
| 24.Disconnect the ground cart from the Green hydraulic system. | |
25.On panel 40VU:
| On the ECAM lower DU:
|
26.On the HP manifold of the Green hydraulic system:
| On the ECAM lower DU:
|
27.On the HP manifold of the Green hydraulic system:
| On the ECAM lower DU:
|
28.On the HP manifold of the Green hydraulic system:
| On the ECAM lower DU:
|
29.On the HP manifold of the Green hydraulic system:
| |
| 30.After a minimum of 6 seconds. | On panel 40VU:
|
31.On panel 121VU:
| Simulated in flight condition with aircraft on ground is stopped. On panel 40VU:
|
| 32.After a minimum of 20 seconds. | On the ECAM lower DU:
|
| 33.On panel 121VU:
| In flight condition with aircraft on ground is simulated. |
| 34.After a minimum of 6 seconds. | On panel 40VU:
|
35.On the HP manifold of the Green hydraulic system:
| On panel 40VU:
|
| 36.After a minimum of 20 seconds. | On the ECAM lower DU:
|
37.On the HP manifold of the Green hydraulic system:
| |
| 38.After a minimum of 6 seconds. | On panel 40VU:
|
39.On the HP manifold of the Green hydraulic system:
| On panel 40VU:
|
| 40.After a minimum of 20 seconds. | On the ECAM lower DU:
|
| 41.On the HP manifold of the Green hydraulic system:
| On the ECAM lower DU:
|
| 42.Depressurize the Yellow hydraulic system (Ref. AMM TASK 29-24-00-864-001). | On the ECAM lower DU:
|
43.On panel 121VU:
| Simulated in flight condition with aircraft on ground is stopped. On panel 40VU:
|
B. Operational Check of PTU Inhibition Logic of the Green Hydraulic System
CAUTION :
WHEN A HYDRAULIC GROUND POWER-SUPPLY OR GROUND CART IS USED, ITS HYDRAULIC FLOW FUNCTION MUST BE LIMITED TO A MAXIMUM OF 50 LITERS PER MINUTE AT NOMINAL PRESSURE (3000 PSI). THIS WILL PREVENT DAMAGE TO THE PTU WHEN STARTING AT HIGH PRESSURE.
(1) Use ALT29000001 HYD GRND PWR UNIT3000 and do the test that follows:
5. Close-upCAUTION :
WHEN A HYDRAULIC GROUND POWER-SUPPLY OR GROUND CART IS USED, ITS HYDRAULIC FLOW FUNCTION MUST BE LIMITED TO A MAXIMUM OF 50 LITERS PER MINUTE AT NOMINAL PRESSURE (3000 PSI). THIS WILL PREVENT DAMAGE TO THE PTU WHEN STARTING AT HIGH PRESSURE.
(1) Use ALT29000001 HYD GRND PWR UNIT3000 and do the test that follows:
| ACTION | RESULT |
|---|---|
1.On panel 85VU:
| |
2.On panel 86VU:
| |
3.On panel 121VU:
NOTE: Intermittent illumination of the PTU FAULT light can occur during this test and is permitted. Also FAULT messages shown for less than two seconds can be ignored. THE FAULT starts continuous less than 2 seconds are thought as temporary. |
|
4.Do a check of the Green hydraulic system:
NOTE: Do not start the electrical pump from the cargo door panel. Use the ELEC PUMP P/BSW on the panel 40VU. | On the ECAM lower DU:
|
5.On the HP manifold of the Green hydraulic system:
NOTE: Connector 1151GN-A must stay disconnected until the end of the step 10. This is to make sure that the PTU does not stop automatically when there is a Green hydraulic low pressure (LO PRESS) condition. | |
6.On panel 40VU:
| |
| 7.Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001). | On the ECAM lower DU:
|
| 8.Disconnect the ground cart from the Green hydraulic system. | |
9.On panel 40VU:
| On the ECAM lower DU:
|
10.On the HP manifold of the Green hydraulic system:
| On the ECAM lower DU:
|
11.On the HP manifold of the Green hydraulic system:
| On the ECAM lower DU:
|
12.On the HP manifold of the Green hydraulic system:
| On the ECAM lower DU:
|
13.On the HP manifold of the Green hydraulic system:
| On panel 40VU:
|
| 14.After a minimum of 6 seconds. | On the ECAM lower DU:
|
15.On panel 121VU:
| Simulated in flight condition with aircraft on ground is stopped. |
| 16.After a minimum of 20 seconds. | On the ECAM lower DU:
|
| | On panel 40VU:
|
17.On panel 121VU:
|
|
| 18.After a minimum of 6 seconds. | On the ECAM lower DU:
|
19.On the HP manifold of the Green hydraulic system:
| On panel 40VU:
|
| 20.After a minimum of 20 seconds. | On the ECAM lower DU:
|
21.On the HP manifold of the Green hydraulic system:
| On panel 40VU:
|
| 22.After a minimum of 6 seconds. | On the ECAM lower DU:
|
23.On the HP manifold of the Green hydraulic system:
| On panel 40VU:
|
| 24.After a minimum of 20 seconds. | On the ECAM lower DU:
|
25.On the HP manifold of the Green hydraulic system:
| On the ECAM lower DU:
|
| | On panel 40VU:
|
| 26.Depressurize the Yellow hydraulic system (Ref. AMM TASK 29-24-00-864-001). | |
27.On panel 121VU:
|
|
28.On panel 85VU:
| |
Subtask 29-23-00-865-065-A
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 29-23-00-410-053-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | HYD/HYD PWR/B WARN/& CTL | 2702GJ | C12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | PTU INHIT/Y SYS | 1808GL | Q33 |
| 121VU | PTU INHIT/G SYS | 1807GL | Q32 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC / PTU FLT INHIB | 1825GL | Q31 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC-PTU FLT INHIT | 1825GL | Q32 |
| ** ON A/C ALL | |||
| 123VU | B HYD/ELEC PUMP | 2701GJ | AB09 |
B. Close Access
(1) Do the ground configuration after flight configuration with electrical power procedure (Ref. AMM TASK 32-00-00-860-002).
(2) Install the EIUs:
(a) Install the EIU (1KS1) (Ref. AMM TASK 73-25-34-400-040).
(b) Install the EIU (1KS2) (Ref. AMM TASK 73-25-34-400-040).
(3) Close access panel 196BB (Ref. AMM TASK 53-35-13-400-002).
(4) Close the main landing-gear doors (Ref. AMM TASK 32-12-00-410-001).
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Remove the access platform(s).
Subtask 29-23-00-410-053-C ** ON A/C NOT FOR ALL (1) Do the ground configuration after flight configuration with electrical power procedure (Ref. AMM TASK 32-00-00-860-002).
(2) Install the EIUs:
(a) Install the EIU (1KS1) (Ref. AMM TASK 73-25-34-400-040).
(b) Install the EIU (1KS2) (Ref. AMM TASK 73-25-34-400-040).
(3) Close access panel 196BB (Ref. AMM TASK 53-35-13-400-002).
(4) Close the main landing-gear doors (Ref. AMM TASK 32-12-00-410-001).
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Remove the access platform(s).
B. Close Access
(1) Do the ground configuration after flight configuration with electrical power procedure (Ref. AMM TASK 32-00-00-860-002).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close access panel 196BB (Ref. AMM TASK 53-35-13-400-002).
(4) Close the main landing-gear doors (Ref. AMM TASK 32-12-00-410-001).
(5) Remove the access platform(s).
Subtask 29-23-00-410-053-H ** ON A/C NOT FOR ALL (1) Do the ground configuration after flight configuration with electrical power procedure (Ref. AMM TASK 32-00-00-860-002).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close access panel 196BB (Ref. AMM TASK 53-35-13-400-002).
(4) Close the main landing-gear doors (Ref. AMM TASK 32-12-00-410-001).
(5) Remove the access platform(s).
B. Close Access
(1) Do the ground configuration after flight configuration with electrical power procedure (Ref. AMM TASK 32-00-00-860-002).
(2) Install the EIUs:
(a) Install the EIU (1KS1) (Ref. AMM TASK 73-25-34-400-041).
(b) Install the EIU (1KS2) (Ref. AMM TASK 73-25-34-400-041).
(3) Close access panel 196BB (Ref. AMM TASK 53-35-13-400-002).
(4) Close the main landing-gear doors (Ref. AMM TASK 32-12-00-410-001).
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Remove the access platform(s).
Subtask 29-23-00-860-065-A (1) Do the ground configuration after flight configuration with electrical power procedure (Ref. AMM TASK 32-00-00-860-002).
(2) Install the EIUs:
(a) Install the EIU (1KS1) (Ref. AMM TASK 73-25-34-400-041).
(b) Install the EIU (1KS2) (Ref. AMM TASK 73-25-34-400-041).
(3) Close access panel 196BB (Ref. AMM TASK 53-35-13-400-002).
(4) Close the main landing-gear doors (Ref. AMM TASK 32-12-00-410-001).
(5) Make sure that the work area is clean and clear of tools and other items.
(6) Remove the access platform(s).
C. Put the aircraft back to the serviceable condition.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) In the cockpit, make sure that the parking brake is in the ON position.
(3) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(2) In the cockpit, make sure that the parking brake is in the ON position.
(3) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).