Removal of the Engine Interface Unit (EIU) [CFMI]
TASK 73-25-34-000-040-A
Removal of the Engine Interface Unit (EIU)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 73-25-34-865-055-A ** ON A/C NOT FOR ALL
Subtask 73-25-34-941-051-A ** ON A/C NOT FOR ALL
Subtask 73-25-34-020-051-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 02:57:06 UTC
Removal of the Engine Interface Unit (EIU)
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 824 |
| REFERENCE | DESIGNATION |
|---|---|
Subtask 73-25-34-865-055-A ** ON A/C NOT FOR ALL
WARNING:
OPEN THE PROBE HEATER CIRCUIT-BREAKERS 1DA1(2), 3DA1(2,3), 4DA1(2,3) AND 5DA1(2,3) BEFORE ENG1(2)FADEC A and EIU 1(2) C/B'S 2KS1 AND 2KS2. IF YOU DO NOT OBEY THIS SEQUENCE:
- THE PROBES WILL BECOME TOO HOT.
- THIS CAN CAUSE DAMAGE TO EQUIPMENT AND INJURY TO MAINTENANCE PERSONNEL.
WARNING:
OPEN CIRCUIT BREAKERS 2KS1 AND 2KS2 AFTER YOU OPEN THE IGNITION CIRCUIT BREAKERS. IF NOT, THE CONTINUOUS IGNITION SYSTEM WILL BE ACTIVATED.
A. Open, safety and tag this(these) circuit breaker(s):| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | ANTI ICE/PROBES/AOA/1 | 4DA1 | D04 |
| 49VU | ANTI ICE/PROBES/PITOT/1 | 3DA1 | D02 |
| 49VU | COM/CVR/SPLY | 2RK | E14 |
| 49VU | COM/CVR/CTL | 4RK | E13 |
| 121VU | RCDR/DFDR | 7TU | K16 |
| 122VU | ANTI ICE/WINDOWS/R | 4DG2 | W14 |
| 122VU | ANTI ICE/WINDOWS/L | 4DG1 | X14 |
| 122VU | ANTI ICE/PROBES/2/TAT | 1DA2 | Y15 |
| 122VU | ANTI ICE/PROBES/2/PITOT | 3DA2 | Y14 |
| 122VU | ANTI ICE/PROBES/2/AOA | 4DA2 | Y13 |
| 122VU | ANTI ICE/PROBES/2/STATIC | 5DA2 | Y11 |
| 122VU | ANTI ICE/PROBES/3/PITOT | 3DA3 | Z16 |
| 122VU | ANTI ICE/PROBES/3/AOA | 4DA3 | Z15 |
| 122VU | ANTI ICE/PROBES/3/STATIC | 5DA3 | Z14 |
| 122VU | ANTI ICE/PROBES/1/STATIC | 5DA1 | Z13 |
| 122VU | ANTI ICE/PROBES/1/TAT | 1DA1 | Z12 |
| FOR FIN: 1KS1 (EIU1) | |||
| 49VU | ENGINE/1/FADEC A/AND EIU 1 | 2KS1 | A04 |
| 49VU | ENGINE/1 AND 2/IGN/SYS A | 1JH | A03 |
| 121VU | ENGINE/IGN/ENG1/SYS B | 3JH1 | P41 |
| 121VU | ENGINE/IGN/ENG1/SYS A BAT | 2JH1 | P39 |
| 121VU | ENGINE/ENG1/FADEC B/AND EIU 1 | 4KS1 | R41 |
| FOR FIN: 1KS2 (EIU2) | |||
| 49VU | ENGINE/2/FADEC A/AND EIU 2 | 2KS2 | A05 |
| 49VU | ENGINE/1 AND 2/IGN/SYS A | 1JH | A03 |
| 121VU | ENGINE/IGN/ENG2/SYS B | 3JH2 | P42 |
| 121VU | ENGINE/IGN/ENG2/SYS A BAT | 2JH2 | P40 |
| 121VU | ENGINE/ENG2/FADEC B | 4KS2 | Q40 |
B. Put the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE in position.
Subtask 73-25-34-010-051-A ** ON A/C NOT FOR ALL 4. ProcedureSubtask 73-25-34-020-051-A ** ON A/C NOT FOR ALL
A. Removal of the Engine Interface Unit:
(1) Loosen the knurled nuts (5).
(2) Lower the knurled nuts (5) to free the hooks (4).
(3) Pull the engine interface unit (1) with the handle (3) until the connector (6) is disconnected.
(4) Remove the engine interface unit (1) from its support (2).
(5) Put the CAP - BLANKING on the electrical connectors.
(1) Loosen the knurled nuts (5).
(2) Lower the knurled nuts (5) to free the hooks (4).
(3) Pull the engine interface unit (1) with the handle (3) until the connector (6) is disconnected.
(4) Remove the engine interface unit (1) from its support (2).
(5) Put the CAP - BLANKING on the electrical connectors.
Engine Interface Unit