Integrity Test of the Hydraulic Power
TASK 29-00-00-710-001-A
Integrity Test of the Hydraulic Power
To make sure that the hydraulic system is safe after maintenance work on the electrical system.
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 29-00-00-860-082-A
Subtask 29-00-00-870-067-A
Subtask 29-00-00-860-083-A
[Rev.10 from 2021]
2026.04.01 00:13:24 UTC
Integrity Test of the Hydraulic Power
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU EXTEND/RETRACT THE RAT.
1. Reason for the JobTo make sure that the hydraulic system is safe after maintenance work on the electrical system.
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-00-00-870-001-A | Bleeding Procedure of the Green Hydraulic System Upstream of the Engine Pump |
| TASK 29-00-00-870-002-A | Bleeding Procedure of the Green Hydraulic System Upstream of the PTU |
| TASK 29-00-00-870-003-A | Bleeding Procedure of the Green Hydraulic System Downstream of the Engine Pump |
| TASK 29-00-00-870-004-A | Bleeding Procedure of the Yellow Hydraulic System Upstream of the Engine Pump |
| TASK 29-00-00-870-005-A | Bleeding Procedure of the Yellow Hydraulic System Upstream of the PTU |
| TASK 29-00-00-870-006-A | Bleeding Procedure of the Yellow Hydraulic System Upstream of the Yellow E-Pump |
| TASK 29-00-00-870-007-A | Bleeding Procedure of the Yellow Hydraulic System Downstream of the Engine Pump |
| TASK 29-00-00-870-008-A | Bleeding Procedure of the Blue Hydraulic System Upstream of the Blue E-Pump |
| TASK 29-00-00-870-009-A | Bleeding Procedure of the Blue Hydraulic System Downstream of the Blue E-Pump |
| TASK 29-10-00-710-001-A | Operational Check of Hydraulic Fire Shut Off Valves and Associated Indicating System |
| TASK 29-11-00-710-001-A | Operational Test of the Green Hydraulic System |
| TASK 29-12-00-710-001-A | Functional Check of Blue Electrical Pump Pressure by Reading ECAM Indication |
| TASK 29-13-00-710-002-A | Operational Test of the Yellow Hydraulic System |
| TASK 29-22-00-710-006-A | Operational Check of Ram Air Turbine (RAT) Automatic Deployment |
| TASK 29-22-00-710-007-A | Operational Test of the Manual Deployment and the Retraction of the Ram Air Turbine |
| TASK 29-23-00-710-002-A | Functional Check of the Power Transfer Unit (PTU) Green to Yellow |
| TASK 29-23-00-710-003-A | Functional Check of the Power Transfer Unit (PTU) Yellow to Green |
| TASK 29-24-00-710-001-A | Operational Test of the Yellow Auxiliary Power |
| TASK 29-31-00-710-001-A | Functional Check of Reservoir Low Level Warning |
| TASK 31-50-00-710-003-A | Operational Test of the System Data Acquisition Concentrator (SDAC) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
Subtask 29-00-00-860-082-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001) .
(3) On the ECAM control panel, push the HYD key. Make sure that the HYD page comes into view on the ECAM lower DU.
4. Procedure(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001) .
(3) On the ECAM control panel, push the HYD key. Make sure that the HYD page comes into view on the ECAM lower DU.
Subtask 29-00-00-870-067-A
A. Bleeding
(a) For the Green hydraulic system:
Subtask 29-00-00-710-051-A NOTE: The subsequent bleeding procedures are only necessary after the replacement of hydraulic components, or opening of the hydraulic system(s).
(1) Do the applicable bleeding procedure for the related hydraulic system: (a) For the Green hydraulic system:
- (Ref. AMM TASK 29-00-00-870-001),
- (Ref. AMM TASK 29-00-00-870-002),
- (Ref. AMM TASK 29-00-00-870-003).
- (Ref. AMM TASK 29-00-00-870-004),
- (Ref. AMM TASK 29-00-00-870-005),
- (Ref. AMM TASK 29-00-00-870-006),
- (Ref. AMM TASK 29-00-00-870-007).
B. Do the operational test of the System Data Acquisition Concentrator (SDAC) (Ref. AMM TASK 31-50-00-710-003).
Subtask 29-00-00-710-052-A C. Operational Tests
(1) Do the operational test of the applicable hydraulic system:
(3) Do the operational tests of the Power Transfer Unit (PTU):
(4) Do the operational test of the leak-measurement valve of the applicable hydraulic system:
Subtask 29-00-00-710-053-A Subtask 29-00-00-710-054-B (1) Do the operational test of the applicable hydraulic system:
- For the Green hydraulic system (Ref. AMM TASK 29-11-00-710-001),
- For the Yellow hydraulic system (Ref. AMM TASK 29-13-00-710-002),
- For the Blue hydraulic system (Ref. AMM TASK 29-12-00-710-001),
(3) Do the operational tests of the Power Transfer Unit (PTU):
(4) Do the operational test of the leak-measurement valve of the applicable hydraulic system:
| ACTION | RESULT |
|---|---|
1.On the ECAM control panel on the center pedestal:
| On the ECAM lower DU:
|
2.On the overhead panel 50VU:
| In less than 15 s on the ECAM lower DU:
|
3.On the overhead panel 50VU:
| On the ECAM lower DU:
NOTE: When you set the P/BSW to on, the ECAM lower DU can change to the ELEC page. Also the single chime audio warning and MASTER CAUT light operate. You can ignore these indications. Cancel the MASTER CAUT light and set the HYD page on the ECAM lower DU to find the hydraulic indications. |
E. Operational Tests of the Ram Air Turbine (RAT)
(1) Do the operational test of the manual deployment and the retraction of the RAT (Ref. AMM TASK 29-22-00-710-007).
(2) Do the operational test of the automatic deployment of the RAT (Ref. AMM TASK 29-22-00-710-006).
Subtask 29-00-00-710-055-A 5. Close-up(1) Do the operational test of the manual deployment and the retraction of the RAT (Ref. AMM TASK 29-22-00-710-007).
(2) Do the operational test of the automatic deployment of the RAT (Ref. AMM TASK 29-22-00-710-006).
Subtask 29-00-00-860-083-A
A. Put the aircraft back to the serviceable condition.
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002)
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002)
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).