25-35 GALLEY EQUIPMENT
- PB.001 GALLEY EQUIPMENT - DESCRIPTION AND OPERATION
- PB.201 GALLEY EQUIPMENT - MAINTENANCE PRACTICES
-
25-35-00-910-001-A
[10]
Maintenance of the Coffee-Maker (if installed) -
25-35-00-910-002-A
[10]
Maintenance of the Hot-Plate (if installed) -
25-35-00-010-001-A
[10]
Removal of the Galley Equipment -
25-35-00-410-001-A
[10]
Installation of the Galley Equipment
-
25-35-00-910-001-A
[10]
- PB.401 GALLEY EQUIPMENT - DEACTIVATION/REACTIVATION
-
25-35-00-040-001-A
[10]
Deactivation of the Galley-Waste-Compartment Flapper-Door -
25-35-00-440-001-A
[10]
Reactivation of the Galley-Waste-Compartment Flapper-Door -
25-35-00-040-802-A
[10]
Deactivation of the Galley-Waste-Compartment Access Door (If Installed) -
25-35-00-440-802-A
[10]
Reactivation of the Galley-Waste-Compartment Access Door (If Installed)
-
25-35-00-040-001-A
[10]
- PB.501 GALLEY EQUIPMENT - ADJUSTMENT/TEST
-
25-35-00-710-013-A
[10]
Operational Test of the Coffee Maker -
25-35-00-710-014-A
[10]
Operational Test of the Espresso Maker -
25-35-00-710-015-A
[10]
Operational Test of the Oven -
25-35-00-710-016-A
[10]
Operational Test of the Steam Oven -
25-35-00-710-018-A
[10]
Operational Test of the Beverage Maker -
25-35-00-710-023-A
[10]
Operational Test of the Water Boiler/Heater -
25-35-00-710-026-A
[10]
Operational Test of the Hot Plate
-
25-35-00-710-013-A
[10]
- PB.401 COFFEE MAKER - REMOVAL/INSTALLATION
-
25-35-15-000-001-A
[10]
Removal of the Coffee Maker(s) -
25-35-15-400-001-A
[10]
Installation of the Coffee Maker(s) -
25-35-15-000-002-A
[10]
Removal of the Espresso Maker -
25-35-15-400-002-A
[10]
Installation of the Espresso Maker
-
25-35-15-000-001-A
[10]
- PB.401 OVEN - REMOVAL/INSTALLATION
-
25-35-19-000-001-A
[10]
Removal of the Oven(s) -
25-35-19-400-001-A
[10]
Installation of the Oven(s) -
25-35-19-000-003-A
[10]
Removal of the Steam Oven(s) -
25-35-19-400-003-A
[10]
Installation of the Steam Oven(s) -
25-35-19-000-004-A
[10]
Removal of the Oven Control Module -
25-35-19-400-004-A
[10]
Installation of the Oven Control Module
-
25-35-19-000-001-A
[10]
- PB.401 BEVERAGE MAKER - REMOVAL/INSTALLATION
-
25-35-21-000-001-A
[10]
Removal of the Beverage Maker(s) -
25-35-21-400-001-A
[10]
Installation of the Beverage Maker(s)
-
25-35-21-000-001-A
[10]
- PB.401 WATER BOILER - REMOVAL/INSTALLATION
-
25-35-27-000-001-A
[10]
Removal of the Water Boiler(s)/Heater(s) -
25-35-27-400-001-A
[10]
Installation of the Water Boiler(s)/Heater(s)
-
25-35-27-000-001-A
[10]
- PB.401 CONTROL PANEL - GALLEY - REMOVAL/INSTALLATION
-
25-35-34-000-001-A
[10]
Removal of the Galley Control Panel -
25-35-34-400-001-A
[10]
Installation of the Galley Control Panel
-
25-35-34-000-001-A
[10]
- PB.401 HOT PLATE - REMOVAL/INSTALLATION
-
25-35-36-000-001-A
[10]
Removal of the Hot-Plate -
25-35-36-400-001-A
[10]
Installation of the Hot-Plate
-
25-35-36-000-001-A
[10]