Operational Test of the Coffee Maker
TASK 25-35-00-710-013-A
Operational Test of the Coffee Maker
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 25-35-00-861-062-A ** ON A/C NOT FOR ALL Subtask 25-35-00-865-085-A ** ON A/C NOT FOR ALL
Subtask 25-35-00-710-064-A ** ON A/C NOT FOR ALL
Subtask 25-35-00-860-076-A ** ON A/C NOT FOR ALL
Subtask 25-35-00-862-062-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:34:14 UTC
Operational Test of the Coffee Maker
ZONE: 200
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 38-10-00-614-001-A | Pressurization of the Potable Water System from a Ground Air Supply |
| TASK 38-10-00-614-002-A | Depressurization of the Potable Water System |
Subtask 25-35-00-861-062-A ** ON A/C NOT FOR ALL Subtask 25-35-00-865-085-A ** ON A/C NOT FOR ALL
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 25-35-00-860-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 123VU | FWD GALLEY/FEEDER F | 16MC | AC10 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
| ** ON A/C NOT FOR ALL | |||
| 123VU | AFT GALLEY/FEEDER B | 12MC | AD09 |
| 123VU | FWD GALLEY/FEEDER D | 2MC | AD04 |
| 123VU | FWD GALLEY/FEEDER C | 1MC | AE10 |
C. Aircraft Maintenance Configuration
(1) In the cockpit, on the overhead panel, on the ELEC section of panel 35VU, make sure that the GALLEY or GALY & CAB pushbutton switch (2XA) is pushed (the OFF legend is off).
(2) On the galley control panel, make sure that the related circuit breaker(s) of the coffee maker is (are) closed.
(3) Pressurize the potable water system (Ref. AMM TASK 38-10-00-614-001).
4. Procedure(1) In the cockpit, on the overhead panel, on the ELEC section of panel 35VU, make sure that the GALLEY or GALY & CAB pushbutton switch (2XA) is pushed (the OFF legend is off).
(2) On the galley control panel, make sure that the related circuit breaker(s) of the coffee maker is (are) closed.
(3) Pressurize the potable water system (Ref. AMM TASK 38-10-00-614-001).
Subtask 25-35-00-710-064-A ** ON A/C NOT FOR ALL
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
WARNING:
OPEN THE WATER FAUCET OR THE WATER DRAIN CAREFULLY AND SLOWLY. THE TANK IS PRESSURIZED AND STEAM OR VERY HOT WATER CAN COME OUT OF THE NOZZLE. HOT WATER OR STEAM IS DANGEROUS (IT CAN BURN YOU).
A. Operational Test of the Coffee Maker NOTE: The NO WATER or LOW WATER indicator could be installed in the COLD WATER pushbutton.
NOTE: If there is no HOT PLATE pushbutton installed, the hot plate is energized whenever the ON/OFF pushbutton is in the ON position.
| ACTION | RESULT |
|---|---|
| 1.In the galley: | In the galley at the coffee maker: |
| |
| 2.At the coffee maker: | |
|
|
|
|
| |
|
|
3.In the galley:
| |
| 4.At the coffee maker: | At the coffee maker: |
| |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
| |
|
|
|
|
|
|
B. Aircraft Maintenance Configuration
(1) Put the related circuit breaker(s) and switch(es) back to their initial configuration.
(2) If necessary, depressurize the potable water system (Ref. AMM TASK 38-10-00-614-002).
(3) Make sure that the coffee maker is in its initial configuration.
(4) Make sure that the work area is clean and clear of tools and other items.
5. Close-up(1) Put the related circuit breaker(s) and switch(es) back to their initial configuration.
(2) If necessary, depressurize the potable water system (Ref. AMM TASK 38-10-00-614-002).
(3) Make sure that the coffee maker is in its initial configuration.
(4) Make sure that the work area is clean and clear of tools and other items.
Subtask 25-35-00-862-062-A ** ON A/C NOT FOR ALL