Pressurization of the Potable Water System from a Ground Air Supply


TASK 38-10-00-614-001-A
Pressurization of the Potable Water System from a Ground Air Supply


CAUTION: DO NOT OPEN THE ELECTRICAL DRAIN VALVES FOR LONGER THAN NECESSARY IF YOU USE THE APU OR ENGINE(S) TO PRESSURIZE THE SYSTEM. IF THE VALVES STAY OPEN TOO LONG THE HOT BLEED AIR CAN CAUSE DAMAGE TO THE TANK QUANTITY TRANSMITTER.
NOTE: You can pressurize the potable water system with the Auxiliary Power Unit (APU). When you start the APU, the system will start to pressurize automatically (Ref. AMM TASK 49-00-00-860-003) (Ref. AMM TASK 49-00-00-860-005) (Ref. AMM TASK 49-00-00-860-008). The system will also automatically pressurize when the primary engines are started.
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
AIR SOURCE 6.9 BAR (100 PSI) - REGULATED,FILTERED, DRY
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
171AL
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 12-15-38-613-001-A
Fill the Potable Water Tank System (Aircraft Electrical Power Available)
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
TASK 24-42-00-862-001-A
De-energize the Ground Service Network Supplied from the External Power
TASK 38-10-00-614-002-A
Depressurization of the Potable Water System
3. Job Set-up
Subtask 38-10-00-861-052-A
A. Energize the ground service network
(Ref. AMM TASK 24-42-00-861-001)
Subtask 38-10-00-010-053-A
B. Get Access
   (1) Put the ACCESS PLATFORM 2M (6 FT) in position at Zone 171.
   (2) Open the service door 171AL.
Subtask 38-10-00-865-065-A
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
2000VUWATER SYSTEM-QANT-IND1MAB01
** ON A/C NOT FOR ALL
2001VUWATER SYS-QUANT-IND1MAB06
Subtask 38-10-00-613-054-A
D. Fill the potable water system (Ref. AMM TASK 12-15-38-613-001).
4. Procedure
Subtask 38-10-00-614-053-A
A. Pressurization of the Potable Water System
   (1) Connect the AIR SOURCE 6.9 BAR (100 PSI) - REGULATED,FILTERED, DRY to the ground air connection at the service panel 2023VU.
   (2) Open the air pressurization valve (1).
   (3) Operate the ground air supply to a pressure of 44 +3 -3 psi (3.03 +0.2 -0.2 bar).
   (4) Close the air pressurization valve (1).
   (5) Shut off the ground air supply.
   (6) Remove the ground air-supply source.
   (7) If necessary depressurize the potable water system (Ref. AMM TASK 38-10-00-614-002).
5. Close-up
Subtask 38-10-00-410-055-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the service door 171AL.
   (3) Remove the access platform(s).
Subtask 38-10-00-862-050-A
B. De-energize the ground service network
   (1) (Ref. AMM TASK 24-42-00-862-001)