W DOC AIRBUS | AMM A320F

Removal of the Oven Control Module


TASK 25-35-19-000-004-A
Removal of the Oven Control Module


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
CAP - BLANKING
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-42-00-861-001-A
Energize the Ground Service Network from the External Power
3. Job Set-up
Subtask 25-35-19-861-059-A ** ON A/C NOT FOR ALL
A. Energize the ground service network (Ref. AMM TASK 24-42-00-861-001).
Subtask 25-35-19-860-070-A ** ON A/C NOT FOR ALL
B. At the related galley on the galley control panel:
   (1) Open, safety and tag the related circuit breaker(s) of the oven.
4. Procedure
Subtask 25-35-19-020-053-B ** ON A/C NOT FOR ALL
A. Removal of the Oven Control Module (OCM)
F Oven Control Module ** ON A/C NOT FOR ALL
   (1) Carefully pull the OCM (1) out of the mounting rails (2).
   (2) Disconnect the electrical connectors and remove the OCM (1) from the galley.
   (3) Put the CAP-BLANKING on each disconnected electrical connector and receptacle.
[Rev.10 from 2021] 2026.03.31 23:34:30 UTC