W DOC AIRBUS | AMM A320F

General Visual Inspection of P Route Installed in the Aft Cabin Utility-Area (EWIS)


TASK 24-92-00-210-044-A
General Visual Inspection of P Route Installed in the Aft Cabin Utility-Area (EWIS)


ZONE: 261
ZONE: 262
1. Reason for the Job
Refer to the MPD TASK: 200261-02
GENERAL VISUAL INSPECTION OF P ROUTES INSTALLED IN THE AFT CABIN UTILITY AREA (EWIS)
NOTE: This is an EWIS (Electrical Wiring Interconnection System) procedure. EWIS is defined in ESPM 20-33-11.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE
No specific
AR
FLASHLIGHT
No specific
AR
MIRROR - INSPECTION, FLEXIBLE
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
261
AFT CABIN UTILITY AREA
262
AFT CABIN UTILITY AREA
832, 842
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 25-33-41-000-002-A
Removal of the Aft Galley Unit
TASK 25-33-41-400-002-A
Installation of the Aft Galley Unit
TASK 25-33-42-000-001-A
Removal of the Aft Galley Unit
TASK 25-33-42-400-001-A
Installation of the Aft Galley Unit
TASK 25-33-45-000-001-A
Removal of the Aft Galley Unit
TASK 25-33-45-400-001-A
Installation of the Aft Galley Unit
TASK 25-33-50-000-802-A
Removal of Galley G4B (Space-Flex V2)
TASK 25-33-50-400-801-A
Installation of the Aft Galley Unit
TASK 25-33-50-400-802-A
Installation of Galley G4B (Space-Flex V2)
TASK 25-43-41-000-001-A
Removal of Lavatory D
TASK 25-43-41-000-802-A
Removal of the Lavatory Ds
TASK 25-43-41-400-001-A
Installation of Lavatory D
TASK 25-43-41-400-802-A
Installation of the Lavatory Ds
TASK 25-43-42-000-001-A
Removal of Lavatory E
TASK 25-43-42-000-802-A
Removal of Lavatory Es
TASK 25-43-42-400-001-A
Installation of Lavatory E
TASK 25-43-42-400-802-A
Installation of Lavatory Es
TASK 25-43-49-000-802-A
Removal of Space-Flex Lavatory B/F or F/G or D/E
TASK 25-43-49-400-802-A
Installation of Space-Flex Lavatory B/F or F/G or D/E
TASK 52-10-00-010-001-A
Opening of the Passenger/Crew Door
TASK 52-10-00-410-001-A
Closing of the Passenger/Crew Door
ESPM 2052110
3. Job Set-up
Subtask 24-92-00-010-129-A
A. Get Access
   (1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE in position in front of passenger/crew door 832( 842).
   (2) Open passenger/crew door 832( 842) (Ref. AMM TASK 52-10-00-010-001).
   (3) Remove the furnishing in zones 261 and 262:
     (a) If the lavatories are installed, remove them (Ref. AMM TASK 25-43-41-000-001), (Ref. AMM TASK 25-43-41-000-802), (Ref. AMM D/O 25-43-41-00), (Ref. AMM TASK 25-43-42-000-001), (Ref. AMM TASK 25-43-42-000-802), (Ref. AMM D/O 25-43-42-00), (Ref. AMM D/O 25-43-43-00), (Ref. AMM D/O 25-43-48-00), (Ref. AMM D/O 25-43-49-00), (Ref. AMM TASK 25-43-49-000-802) and (Ref. AMM D/O 25-43-49-00).
     (b) If the galleys and the stowage are installed, remove them (Ref. AMM D/O 25-33-41-00), (Ref. AMM TASK 25-33-41-000-002), (Ref. AMM D/O 25-33-41-00), (Ref. AMM TASK 25-33-42-000-001), (Ref. AMM D/O 25-33-43-00), (Ref. AMM D/O 25-33-43-00), (Ref. AMM TASK 25-33-45-000-001), (Ref. AMM D/O 25-33-46-00), (Ref. AMM D/O 25-33-49-00), (Ref. AMM D/O 25-33-50-00), (Ref. AMM TASK 25-33-50-000-802) and (Ref. AMM D/O 25-33-52-00).
Subtask 24-92-00-862-117-A
B. Make sure that the aircraft electrical circuits are de-energized
(Ref. AMM TASK 24-41-00-862-002).
4. Procedure
Subtask 24-92-00-210-094-A
A. General Visual Inspection of P Route Wiring Installed in the Aft Cabin Utility Area
   (1) Do a visual inspection of the wiring to make sure that there is no signs of ageing, alteration, overheating, scaling and deformation ESPM 2052110:
     (a) On the AC/DC power-distribution routes: 2P installed between FR68 and FR70 on R side only.
NOTE: Use a FLASHLIGHT or a MIRROR - INSPECTION, FLEXIBLE if necessary.
   (2) Make sure that there is no dust or lint contamination.
5. Close-up
Subtask 24-92-00-410-127-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the furnishing at zones 261 and 262:
     (a) If the lavatories are removed, install them (Ref. AMM TASK 25-43-41-400-001), (Ref. AMM TASK 25-43-41-400-802), (Ref. AMM D/O 25-43-41-40), (Ref. AMM TASK 25-43-42-400-001), (Ref. AMM TASK 25-43-42-400-802), (Ref. AMM D/O 25-43-42-40), (Ref. AMM D/O 25-43-43-40), (Ref. AMM D/O 25-43-48-40), (Ref. AMM D/O 25-43-49-40), (Ref. AMM TASK 25-43-49-400-802) and (Ref. AMM D/O 25-43-49-40).
     (b) If the galleys and the stowage are removed, install them (Ref. AMM D/O 25-33-41-40), (Ref. AMM TASK 25-33-41-400-002), (Ref. AMM D/O 25-33-41-40), (Ref. AMM TASK 25-33-42-400-001), (Ref. AMM D/O 25-33-43-40), (Ref. AMM D/O 25-33-43-40), (Ref. AMM TASK 25-33-45-400-001), (Ref. AMM D/O 25-33-46-40), (Ref. AMM D/O 25-33-49-40), (Ref. AMM TASK 25-33-50-400-801), (Ref. AMM TASK 25-33-50-400-802) and (Ref. AMM D/O 25-33-52-40).
   (3) Close passenger/crew door 832( 842) (Ref. AMM TASK 52-10-00-410-001).
   (4) Remove the access platform(s).
[Rev.10 from 2021] 2026.03.31 23:26:32 UTC