TASK 25-33-50-400-801-A
Installation of the Aft Galley Unit
Self Explanatory
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 25-33-50-865-051-A ** ON A/C NOT FOR ALL
Subtask 25-33-50-865-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:33:51 UTC
Installation of the Aft Galley Unit
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING:
BE CAREFUL WHEN YOU REMOVE OR INSTALL THIS EQUIPMENT. THIS EQUIPMENT IS HEAVY (MORE THAN 12 KG (26.5 lb)) AND CAN CAUSE INJURY AND/OR DAMAGE.
1. Reason for the JobSelf Explanatory
NOTE: More than one person is necessary for this procedure.
2. Job Set-up InformationA. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 260 | AFT CABIN UTILITY AREA |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-15-38-613-001-A | Fill the Potable Water Tank System (Aircraft Electrical Power Available) |
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 38-10-00-614-001-A | Pressurization of the Potable Water System from a Ground Air Supply |
Subtask 25-33-50-865-051-A ** ON A/C NOT FOR ALL
A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
| 2001VU | POT/WASTE WIP-HEATER-LINE | 31DW | D03 |
Subtask 25-33-50-865-052-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 25-33-50-710-050-B ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 122VU | ELEC/GALLEY/CNTOR | 7MC | S28 |
| 122VU | ELEC/GALY & CAB/CTL | 1XA | S26 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/CTL | 5HU | U21 |
| 122VU | AIR COND/LAV/GALLEY VENT CTL/EXTRACT FAN/SPLY | 6HU | U19 |
| 123VU | AFT GALLEY/FEEDER E | 14MC | AF09 |
| 123VU | AFT GALLEY/FEEDER A | 3MC | AF04 |
| 2001VU | POT/WASTE WIP-HEATER-LINE | 31DW | D03 |
B. Operational Test of the Galley Systems
(1) Do a check of the air supply as follows:
(a) Do the pre-conditioning with the APU (Ref. AMM TASK 12-33-21-618-001) or the HP ground connection (Ref. AMM TASK 12-33-21-618-001).
(b) Turn the air outlet clockwise until it is in the closed position.
(c) Make sure that no air comes out from the air outlet.
(d) Examine all the air hoses and the connections for leaks.
(e) If you find leaks, repair them.
(f) Turn the air outlet counterclockwise until it is in the open position.
(g) Make sure that the intensity of the airflow changes when you turn the air outlet.
(2) Do a check of the potable water and drain systems as follows:
(a) Make sure that the potable water system is filled (Ref. AMM TASK 12-15-38-613-001).
(b) Pressurize the potable water system (Ref. AMM TASK 38-10-00-614-001).
(c) Examine all the potable water hoses for leaks.
(d) If you find leaks, repair them.
(e) Operate the faucet and make sure that water flows.
(f) Let the water flow until it is clean.
(g) Examine all the drain water hoses for leaks.
(h) If you find leaks, repair them.
(3) Do an operational test of the galley electrical system as follows:
(a) On the galley control panel, make sure that all the circuit breakers are closed.
(b) Operate each electrical unit/component for a short time to make sure that it is serviceable.
(1) Do a check of the air supply as follows:
(a) Do the pre-conditioning with the APU (Ref. AMM TASK 12-33-21-618-001) or the HP ground connection (Ref. AMM TASK 12-33-21-618-001).
(b) Turn the air outlet clockwise until it is in the closed position.
(c) Make sure that no air comes out from the air outlet.
(d) Examine all the air hoses and the connections for leaks.
(e) If you find leaks, repair them.
(f) Turn the air outlet counterclockwise until it is in the open position.
(g) Make sure that the intensity of the airflow changes when you turn the air outlet.
(2) Do a check of the potable water and drain systems as follows:
(a) Make sure that the potable water system is filled (Ref. AMM TASK 12-15-38-613-001).
(b) Pressurize the potable water system (Ref. AMM TASK 38-10-00-614-001).
(c) Examine all the potable water hoses for leaks.
(d) If you find leaks, repair them.
(e) Operate the faucet and make sure that water flows.
(f) Let the water flow until it is clean.
(g) Examine all the drain water hoses for leaks.
(h) If you find leaks, repair them.
(3) Do an operational test of the galley electrical system as follows:
(a) On the galley control panel, make sure that all the circuit breakers are closed.
(b) Operate each electrical unit/component for a short time to make sure that it is serviceable.
| ACTION | RESULT |
|---|---|
| 1.In the flight compartment, on ELEC panel 35VU: | On the galley control panel: |
|
|
| 2.On the galley control panel: | In the galley: |
|
|
|
|
|
|
| 3.In the flight compartment, on ELEC panel 35VU: | On the galley control panel: |
|
|