W DOC AIRBUS | AMM A320F

Change of the Hydraulic Fluid in the Green Hydraulic System - with Ground Cart Available


TASK 12-36-29-600-001-A
Change of the Hydraulic Fluid in the Green Hydraulic System - with Ground Cart Available


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING: DO NOT GET THE FLUID ON YOUR SKIN OR IN YOUR EYES. IF YOU DO:
  • FLUSH IT AWAY WITH CLEAN WATER
  • GET MEDICAL AID.
1. Reason for the Job
To change the type of hydraulic fluid or to change the hydraulic fluid if the contamination is out of tolerance.
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 2M (6 FT)
No specific
1
ACCESS PLATFORM 3M (10 FT)
No specific
1
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
1
CONTAINER 150L (40 USGAL)
No specific
1
CONTAINER 5 L (1.32 USGAL)
No specific
1
GROUND POWER CART-HYDRAULIC
No specific
AR
PLUG - BLANKING
No specific
1
SAFETY BARRIER(S)
No specific
AR
SAFETY CLIP - CIRCUIT BREAKER
No specific
1
TURNTABLE - NLG STEERING OPERATION
No specific
1
WARNING NOTICE(S)
No specific
Torque wrench: range to between 157 and 147 m.N (115.78 and 108.41 lbf.ft ) T
No specific
Torque wrench: range to between 10.7 and 9.7 m.daN (78.91 and 71.53 lbf.ft ) T
460005833
1
SLEEVE-GROUND LOCK
460007280
1
SLEEVE-GROUND LOCK
D23080000
1
PIN-GROUND LOCK,NLG
 B. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
197CB
 C. Referenced Information
REFERENCE
DESIGNATION
TASK 07-11-00-581-001-A
Lifting for Aircraft Maintenance Operations
TASK 07-11-00-586-002-A
Lowering of the Aircraft for Maintenance Operations
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 12-12-29-611-002-A
Fill the Hydraulic Fluid Reservoir with a Hydraulic Service Cart
TASK 12-32-29-281-001-A
Analyze Hydraulic Fluid
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 29-00-00-910-002-A
Safety Procedures of the Hydraulic System
TASK 29-10-00-680-001-A
Drainage of the Reservoir of the Green Hydraulic System
TASK 29-10-00-863-001-A
Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-11-36-000-001-A
Removal of the Engine 1 Green Hydraulic Pump Delivery Check Valve
TASK 29-11-36-400-001-A
Installation of the Engine 1 Green Hydraulic Pump Delivery Check Valve
TASK 29-14-00-614-002-A
Pressurization of the Hydraulic Reservoirs through the Ground Connector
TASK 29-14-00-614-002-A-01
Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU)
TASK 29-23-00-860-001-A
Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 32-00-00-481-001-A
Installation of the Safety Devices on the Landing Gears
TASK 32-12-00-010-001-A
Open the Main Gear Doors for Access
TASK 32-12-00-410-001-A
Close the Main Gear Doors after Access
TASK 32-42-00-870-001-A
Bleeding of the Normal Braking at the Brake Units
TASK 71-13-00-010-010-A
Opening of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 71-13-00-010-040-A
Opening of the Fan Cowl Doors
TASK 71-13-00-010-040-B
Opening of the Fan Cowl Doors
TASK 71-13-00-410-010-A
Closing of the Fan Cowls 437AL(447AL),438AR(448AR)
TASK 71-13-00-410-040-A
Closing of the Fan Cowl Doors
TASK 71-13-00-410-040-B
Closing of the Fan Cowl Doors
TASK 78-31-00-710-040-A
Operational Test of the Thrust Reverser System
TASK 78-31-00-710-040-A-01
Operational Test of the Thrust Reverser without CFDS - Engine not Running
TASK 78-31-00-710-040-A-02
Operational Test of the Thrust Reverser without CFDS - Engine Running
TASK 78-31-00-710-041-A
Operational Test of the Thrust Reverser System with the CFDS
TASK 78-31-00-710-041-A-02
Operational test of the Thrust Reverser without the CFDS and Engine Running
TASK 78-31-00-710-042-A
Operational Test of the Thrust Reverser System
TASK 78-31-00-710-805-A
Operational Test of Thrust Reverser with MCDU
TASK 78-31-00-710-805-A-01
Thrust Reverser Cycling Test (Engine Running)
3. Job Set-up
Subtask 12-36-29-860-096-A
A. Safety Precautions
   (1) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
   (2) Put the WARNING NOTICE(S) and SAFETY BARRIER(S) in position.
   (3) On section 40VU of the overhead panel, push the PTU pushbutton switch. Make sure that the OFF legend comes on.
   (4) Disconnect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-001).
Subtask 12-36-29-865-050-A
B. Open, safety and tag this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/Y HYD/PUMP ENG2/MONG3700GDQ37
121VUHYDRAULIC/Y HYD/PUMP ENG2/CTL3701GDQ36
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
** ON A/C ALL
123VUB HYD/ELEC PUMP2701GJAB09
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 12-36-29-010-073-A ** ON A/C NOT FOR ALL
C. Get Access
   (1) Open the access door 197CB.
   (2) Open the engine 1 fan-cowl doors (Ref. AMM TASK 71-13-00-010-040).
   (3) Open the left or the right MLG door (Ref. AMM TASK 32-12-00-010-001).
   (4) Put the ACCESS PLATFORM 2M (6 FT) in position at the engine 1.
   (5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the MLG bay.
Subtask 12-36-29-010-073-B ** ON A/C NOT FOR ALL
C. Get Access
   (1) Open the access door 197CB.
   (2) Open the engine 1 fan-cowl doors (Ref. AMM TASK 71-13-00-010-010).
   (3) Open the left or the right MLG door (Ref. AMM TASK 32-12-00-010-001).
   (4) Put the ACCESS PLATFORM 2M (6 FT) in position at the engine 1.
   (5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position at the MLG bay.
Subtask 12-36-29-010-073-D ** ON A/C NOT FOR ALL
C. Get Access
   (1) Open the access door 197CB.
   (2) Open the engine 1 fan-cowl doors (Ref. AMM TASK 71-13-00-010-040).
   (3) Open the left or the right MLG door (Ref. AMM TASK 32-12-00-010-001).
   (4) Put the ACCESS PLATFORM 2M (6 FT) in position at the engine 1.
   (5) Put the ACCESS PLATFORM 3M (10 FT) in position at the MLG bay.
Subtask 12-36-29-680-050-A
D. Drain the reservoir of the Green hydraulic system (Ref. AMM TASK 29-10-00-680-001).
Subtask 12-36-29-860-095-A ** ON A/C NOT FOR ALL
E. Preparation for the Fluid Change
CAUTION: MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
   (1) Put the NLG on to the TURNTABLE - NLG STEERING OPERATION (to prevent damage to the tires when the steering is operated).
   (2) Put the CONTAINER 5 L (1.32 USGAL) below the fluid disconnect panel at the engine 1 to collect the hydraulic fluid leakage.
   (3) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC (filled with new hydraulic fluid) to the delivery connector 1008GM at the ground service panel (Ref. detail A).
   (4) Connect the return hose of the auxiliary hydraulic reservoir, with the CONTAINER 150L (40 USGAL) to the suction connector 1006GM at the ground service panel.
NOTE: The auxiliary hydraulic reservoir must have a contents gage.
Subtask 12-36-29-860-095-B ** ON A/C NOT FOR ALL
E. Preparation for the Hydraulic Fluid Change
CAUTION: MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
   (1) Put the CONTAINER 5 L (1.32 USGAL) below the fluid disconnect panel at the engine 1 to collect the unwanted hydraulic fluid.
   (2) Connect the pressure hose of the GROUND POWER CART-HYDRAULIC (filled with new hydraulic fluid) to the delivery connector 1008GM at the ground service panel (Ref. detail A).
   (3) Connect the return hose of the auxiliary hydraulic reservoir, with the CONTAINER 150L (40 USGAL) to the suction connector 1006GM at the ground service panel.
NOTE: The auxiliary hydraulic reservoir must have a contents gage.
4. Procedure
Subtask 12-36-29-611-055-A
A. Fluid Change Procedure without Hydraulic Lines of the Engine Driven Pump (EDP) (Ref. detail A)
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
   (2) Operate the hydraulic power cart.
NOTE: Increase the rate of flow and the pressure as necessary.
   (3) In the cockpit, operate the flight controls.
WARNING: MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROLS SURFACES ARE CLEAR. MOVEMENT OF FLIGHT CONTROLS CAN CAUSE INJURY TO PERSONS AND/OR DAMAGE TO EQUIPMENT.
     (a) On the panel 11VU, move the GND SPLRS ARMED lever to the FULL position and then to the RET position. Do this step 3 times.
NOTE: The spoilers 1 and 5 LH and RH operate.
     (b) On the panel 18VU or 19VU, move the side stick fully to the left and then fully to the right. Do this step 3 times.
NOTE: The ailerons and spoilers 5 LH and RH operate.
     (c) On the panel 18VU or 19VU, move the side stick fully forward and then fully rearward. Do this step 3 times.
NOTE: The LH elevator operates.
     (d) At the captain or first officer position, push the LH pedal fully forward and then the RH pedal fully forward. Do this step 3 times.
NOTE: The rudder operates.
     (e) On the panel 114VU, move the flap/slat lever to the FULL position and then to the 0 deg position.
NOTE: The flaps and slats operate.
     (f) On the center pedestal, turn one of the pitch-trim control wheels to the DN stop and then to the UP stop. Do this step 3 times. Turn the pitch-trim control wheel to the 0 deg position.
NOTE: The THS operates.
   (4) Stop the hydraulic power cart.
Subtask 12-36-29-860-099-A
B. Isolation of the Primary Flight Controls
   (1) Energize the solenoid valve 1150GP in the MLG bay.
     (a) On the panel 50VU in the cockpit, lift the guard and push the HYD/LEAK MEASUREMENT VALVES/G P/BSW (the OFF light comes on).
Subtask 12-36-29-611-056-A ** ON A/C NOT FOR ALL
C. Continuation of the Fluid Change without the Hydraulic Lines of the EDP (Ref. detail A)
WARNING: MAKE SURE THAT THE TRAVEL RANGE OF THE THRUST REVERSER IS CLEAR BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEM. IF YOU DO NOT OBEY THESE INSTRUCTIONS, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Make sure that the manual selector valves on the leakage measurement selector-valve 1146GM (in the MLG bay) are in the OFF position.
   (2) Operate the hydraulic power cart.
NOTE: Increase the rate of flow and pressure as necessary.
   (3) Operate the thrust reverser of Engine 1 (Ref. AMM TASK 78-31-00-710-040).
   (4) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
   (5) Stop the hydraulic power cart.
   (6) Lift the aircraft (Ref. AMM TASK 07-11-00-581-001).
   (7) Remove the turntable.
   (8) Remove the safety locks from the landing gear:
  • For the NLG remove the D23080000 PIN-GROUND LOCK,NLG
  • For the MLG remove the 460005833 SLEEVE-GROUND LOCK or the 460007280 SLEEVE-GROUND LOCK.
   (9) Operate the hydraulic power cart.
NOTE: Increase the rate of flow and pressure as necessary.
   (10) On the panel 400VU, move the landing-gear control lever to the UP position and then to the DOWN position. Do this step 3 times.
NOTE: The landing gear and landing gear doors operate.
   (11) Install the safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001):
   (12) Stop the hydraulic power cart.
   (13) Lower the aircraft (Ref. AMM TASK 07-11-00-586-002).
   (14) Bleed a minimum of 3 l (0.7925 USgal) of hydraulic fluid from the brake units of the normal braking system (Ref. AMM TASK 32-42-00-870-001).
   (15) Disconnect the pressure hose of the hydraulic power cart from the delivery connector 1008GM at the ground service panel.
Subtask 12-36-29-611-056-D ** ON A/C NOT FOR ALL
C. Continuation of the Fluid Change without the Hydraulic Lines of the EDP (Ref. detail A)
WARNING: MAKE SURE THAT THE TRAVEL RANGE OF THE THRUST REVERSER IS CLEAR BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEM. IF YOU DO NOT OBEY THESE INSTRUCTIONS, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Operate the hydraulic power cart.
   (2) Increase the rate of flow and pressure as necessary.
   (3) Operate the thrust reverser of engine 1 (Ref. AMM TASK 78-31-00-710-805).
   (4) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
   (5) Stop the hydraulic power cart.
   (6) Lift the aircraft (Ref. AMM TASK 07-11-00-581-001).
   (7) Remove the safety locks from the landing gear:
  • for the NLG remove the D23080000 PIN-GROUND LOCK,NLG
  • for the MLG remove the 460007280 SLEEVE-GROUND LOCK.
   (8) Operate the hydraulic power cart.
   (9) Increase the rate of flow and pressure as necessary.
   (10) On panel 400VU, move the landing-gear control lever to the UP position and then to the DOWN position. Do this step 3 times.
NOTE: The landing gear and the landing gear doors operate.
   (11) Install the safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001):
  • For the NLG install the D23080000 PIN-GROUND LOCK,NLG
  • For the MLG install the 460007280 SLEEVE-GROUND LOCK.
   (12) Stop the hydraulic power cart.
   (13) Lower the aircraft (Ref. AMM TASK 07-11-00-586-002).
   (14) Bleed a minimum of 3 l (0.7925 USgal) of hydraulic fluid from the brake units of the normal braking system (Ref. AMM TASK 32-42-00-870-001).
   (15) Disconnect the pressure hose of the hydraulic power cart from the delivery connector 1008GM at the ground service panel.
Subtask 12-36-29-611-056-G ** ON A/C NOT FOR ALL
C. Continuation of the Fluid Change without the Hydraulic Lines of the EDP (Ref. detail A)
WARNING: MAKE SURE THAT THE TRAVEL RANGE OF THE THRUST REVERSER IS CLEAR BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEM. IF YOU DO NOT OBEY THESE INSTRUCTIONS, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Operate the hydraulic power cart.
   (2) Increase the rate of flow and pressure as necessary.
   (3) Operate the thrust reverser of engine 1 (Ref. AMM TASK 78-31-00-710-041).
   (4) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
   (5) Stop the hydraulic power cart.
   (6) Lift the aircraft (Ref. AMM TASK 07-11-00-581-001).
   (7) Remove the safety locks from the landing gear:
  • for the NLG remove the D23080000 PIN-GROUND LOCK,NLG
  • for the MLG remove the 460007280 SLEEVE-GROUND LOCK.
   (8) Operate the hydraulic power cart.
   (9) Increase the rate of flow and pressure as necessary.
   (10) On the panel 400VU, move the landing-gear control lever to the UP position and then to the DOWN position. Do this step 3 times.
NOTE: The landing gear and the landing gear doors operate.
   (11) Install the safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001):
  • For the NLG install the D23080000 PIN-GROUND LOCK,NLG
  • For the MLG install the 460007280 SLEEVE-GROUND LOCK.
   (12) Stop the hydraulic power cart.
   (13) Lower the aircraft (Ref. AMM TASK 07-11-00-586-002).
   (14) Bleed a minimum of 3 l (0.7925 USgal) of hydraulic fluid from the brake units of the normal braking system (Ref. AMM TASK 32-42-00-870-001).
   (15) Disconnect the pressure hose of the hydraulic power cart from the delivery connector 1008GM at the ground service panel.
Subtask 12-36-29-611-056-I ** ON A/C NOT FOR ALL
C. Continuation of the Fluid Change without the Hydraulic Lines of the EDP (Ref. detail A)
WARNING: MAKE SURE THAT THE TRAVEL RANGE OF THE THRUST REVERSER IS CLEAR BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEM. IF YOU DO NOT OBEY THESE INSTRUCTIONS, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Make sure that the manual selector valves on the leakage measurement selector-valve 1146GM (in the MLG bay) are in the OFF position.
   (2) Operate the hydraulic power cart.
NOTE: Increase the rate of flow and pressure as necessary.
   (3) Operate the thrust reverser of Engine 1 (Ref. AMM TASK 78-31-00-710-042).
   (4) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
   (5) Stop the hydraulic power cart.
   (6) Lift the aircraft (Ref. AMM TASK 07-11-00-581-001).
   (7) Remove the turntable.
   (8) Remove the safety locks from the landing gear:
  • For the NLG remove the D23080000 PIN-GROUND LOCK,NLG
  • For the MLG remove the 460005833 SLEEVE-GROUND LOCK or the 460007280 SLEEVE-GROUND LOCK.
   (9) Operate the hydraulic power cart.
NOTE: Increase the rate of flow and pressure as necessary.
   (10) On the panel 400VU, move the landing-gear control lever to the UP position and then to the DOWN position. Do this step 3 times.
NOTE: The landing gear and landing gear doors operate.
   (11) Install the safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001):
   (12) Stop the hydraulic power cart.
   (13) Lower the aircraft (Ref. AMM TASK 07-11-00-586-002).
   (14) Bleed a minimum of 3 l (0.7925 USgal) of hydraulic fluid from the brake units of the normal braking system (Ref. AMM TASK 32-42-00-870-001).
   (15) Disconnect the pressure hose of the hydraulic power cart from the delivery connector 1008GM at the ground service panel.
Subtask 12-36-29-611-056-L ** ON A/C NOT FOR ALL
C. Continuation of the Fluid Change without the Hydraulic Lines of the EDP (Ref. detail A)
WARNING: MAKE SURE THAT THE TRAVEL RANGE OF THE THRUST REVERSER IS CLEAR BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEM. IF YOU DO NOT OBEY THESE INSTRUCTIONS, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Make sure that the manual selector valves on the leakage measurement selector-valve 1146GM (in the MLG bay) are in the OFF position.
   (2) Operate the hydraulic power cart.
   (3) Increase the rate of flow and pressure as necessary.
   (4) Operate the thrust reverser of engine 1 (Ref. AMM TASK 78-31-00-710-042).
   (5) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
   (6) Stop the hydraulic power cart.
   (7) Lift the aircraft (Ref. AMM TASK 07-11-00-581-001).
   (8) Remove the safety locks from the landing gear:
  • For the NLG remove the D23080000 PIN-GROUND LOCK,NLG
  • For the MLG remove the 460005833 SLEEVE-GROUND LOCK or the 460007280 SLEEVE-GROUND LOCK.
   (9) Operate the hydraulic power cart.
   (10) Increase the rate of flow and pressure as necessary.
   (11) On the panel 400VU, move the landing-gear control lever to the UP position and then to the DOWN position. Do this step 3 times.
NOTE: The landing gear and the landing gear doors operate.
   (12) Install the safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001):
   (13) Stop the hydraulic power cart.
   (14) Lower the aircraft (Ref. AMM TASK 07-11-00-586-002).
   (15) Bleed a minimum of 3 l (0.7925 USgal) of hydraulic fluid from the brake units of the normal braking system (Ref. AMM TASK 32-42-00-870-001).
   (16) Disconnect the pressure hose of the hydraulic power cart from the delivery connector 1008GM at the ground service panel.
Subtask 12-36-29-611-056-Q ** ON A/C NOT FOR ALL
C. Continuation of the Fluid Change without the Hydraulic Lines of the EDP (Ref. detail A)
WARNING: MAKE SURE THAT THE TRAVEL RANGE OF THE THRUST REVERSER IS CLEAR BEFORE YOU PRESSURIZE THE HYDRAULIC SYSTEM. IF YOU DO NOT OBEY THESE INSTRUCTIONS, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Operate the hydraulic power cart.
   (2) Increase the rate of flow and pressure as necessary.
   (3) Operate the thrust reverser of engine 1 (Ref. AMM TASK 78-31-00-710-042).
   (4) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
   (5) Stop the hydraulic power cart.
   (6) Lift the aircraft (Ref. AMM TASK 07-11-00-581-001).
   (7) Remove the safety locks from the landing gear:
  • for the NLG remove the D23080000 PIN-GROUND LOCK,NLG
  • for the MLG remove the 460007280 SLEEVE-GROUND LOCK.
   (8) Operate the hydraulic power cart.
   (9) Increase the rate of flow and pressure as necessary.
   (10) On the panel 400VU, move the landing-gear control lever to the UP position and then to the DOWN position. Do this step 3 times.
NOTE: The landing gear and the landing gear doors operate.
   (11) Install the safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001):
  • For the NLG install the D23080000 PIN-GROUND LOCK,NLG
  • For the MLG install the 460007280 SLEEVE-GROUND LOCK.
   (12) Stop the hydraulic power cart.
   (13) Lower the aircraft (Ref. AMM TASK 07-11-00-586-002).
   (14) Bleed a minimum of 3 l (0.7925 USgal) of hydraulic fluid from the brake units of the normal braking system (Ref. AMM TASK 32-42-00-870-001).
   (15) Disconnect the pressure hose of the hydraulic power cart from the delivery connector 1008GM at the ground service panel.
Subtask 12-36-29-611-054-A
D. Fluid Change of the Suction Line of the EDP (Ref. detail B)
CAUTION: DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
CAUTION: MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Connect the hose of the auxiliary hydraulic reservoir to the suction connector 1006GM at the ground service panel.
   (2) Disconnect the suction line 1038GM at the fluid disconnect panel of the engine 1.
   (3) Connect the pressure hose of the hydraulic power cart to the coupling 1700GM at the fluid disconnect panel of the engine 1.
   (4) Put the PLUG-BLANKING in each disconnected line end.
   (5) Operate the hydraulic power cart until a minimum of 20 l (5.2834 USgal) of hydraulic fluid flows into the auxiliary hydraulic reservoir.
NOTE: Increase the rate of flow and pressure as necessary, do not pressurize to more than 100 psi (6.8948 bar).
   (6) Stop the hydraulic power cart.
   (7) Disconnect the pressure hose of the hydraulic power cart from the coupling 1700GM of the fluid disconnect panel at the engine 1.
   (8) Disconnect the hose of the auxiliary hydraulic reservoir from the suction connector 1006GM at the ground service panel.
   (9) Remove the blanking plugs.
   (10) Connect the suction line 1038GM at the fluid disconnect panel at the engine 1.
Subtask 12-36-29-611-053-A ** ON A/C NOT FOR ALL
E. Fluid Change of the Pressure Line of the EDP (Ref. detail C)
CAUTION: DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
CAUTION: MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Connect the pressure hose of the hydraulic power cart to delivery connector 1008GM at the ground service panel.
   (2) Disconnect pressure line 1673GM from the pressure coupling at the fluid disconnect panel of the engine 1.
   (3) Remove check valve 1050GM (Ref. AMM TASK 29-11-36-000-001).
   (4) Connect the hose of the auxiliary hydraulic reservoir to the open pressure coupling in the fluid disconnect panel of the engine 1.
   (5) Put the PLUG-BLANKING in each disconnected line end.
   (6) Operate the hydraulic power cart until a minimum of 10 l (2.6417 USgal) of hydraulic fluid flows into the auxiliary hydraulic reservoir.
NOTE: Increase the rate of flow and the pressure as necessary, do not pressurize to more than 100 psi (6.8948 bar).
   (7) Stop the hydraulic power cart.
   (8) Disconnect the pressure hose of the hydraulic power cart from the delivery connector 1008GM at the ground service panel.
   (9) Disconnect the hose of the auxiliary hydraulic reservoir from the port of the fluid disconnect panel at the engine 1.
   (10) Remove the blanking plugs.
   (11) Install check valve 1050GM (Ref. AMM TASK 29-11-36-400-001).
   (12) Connect pressure line 1673GM to the pressure coupling of the fluid disconnect panel at the engine 1.
   (13) TORQUE the coupling nut of the pressure line 1673GM to between 10.7 and 9.7 m.daN (78.91 and 71.53 lbf.ft ) T.
   (14) Remove the hydraulic power cart.
Subtask 12-36-29-611-053-B ** ON A/C NOT FOR ALL
E. Fluid Change of the Pressure Line of the EDP (Ref. detail C)
CAUTION: DO NOT LET HYDRAULIC FLUID FALL ON THE ENGINE. UNWANTED HYDRAULIC FLUID MUST BE REMOVED IMMEDIATELY WITH A CLEAN LINT FREE CLOTH. THE FLUID CAN CAUSE DAMAGE TO THE SURFACE PROTECTION AND TO SOME PARTS.
CAUTION: MAKE SURE THAT THE FLOW RATE AND THE SUPPLY PRESSURE ON THE GROUND HYDRAULIC CART ARE SET TO A MINIMUM.
CAUTION: DO NOT LET THE HYDRAULIC FLUID IN THE GROUND POWER CART DECREASE BELOW THE LOW LEVEL. DO NOT LET THE AUXILIARY HYDRAULIC RESERVOIR BECOME TOO FULL.
   (1) Connect the pressure hose of the hydraulic power cart to the delivery connector 1008GM at the ground service panel.
   (2) Disconnect the pressure line 1673GM from the pressure coupling at the fluid disconnect panel of the engine 1.
   (3) Connect the hose of the auxiliary hydraulic reservoir to the open pressure coupling in the fluid disconnect panel of the engine 1.
   (4) Put the PLUG-BLANKING in each disconnected line end.
   (5) Operate the hydraulic power cart until a minimum of 10 l (2.6417 USgal) of hydraulic fluid flows into the auxiliary hydraulic reservoir.
NOTE: Increase the rate of flow and the pressure as necessary, do not pressurize to more than 100 psi (6.8948 bar).
   (6) Stop the hydraulic power cart.
   (7) Disconnect the pressure hose of the hydraulic power cart from the delivery connector 1008GM at the ground service panel.
   (8) Disconnect the hose of the auxiliary hydraulic reservoir from the port of the fluid disconnect panel at the engine 1.
   (9) Remove the blanking plugs.
   (10) Connect the pressure line 1673GM to the pressure coupling of the fluid disconnect panel at the engine 1.
   (11) TORQUE the coupling nut of the pressure line 1673GM to between 157 and 147 m.N (115.78 and 108.41 lbf.ft )
T.
   (12) Remove the hydraulic power cart.
5. Close-up
Subtask 12-36-29-860-097-A
A. Put the aircraft back to the serviceable condition.
   (1) Fill the reservoir of the Green hydraulic system (
Ref. AMM TASK 12-12-29-611-001) or (Ref. AMM TASK 12-12-29-611-002).
   (2) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
   (3) Pressurize the Green Hydraulic system with the ground cart (Ref. AMM TASK 29-10-00-863-001).
   (4) On the panel 50VU in the cockpit, lift the guard and push the HYD/LEAK MEASUREMENT VALVES/G P/BSW (the OFF light goes off).
   (5) Operate the related hydraulic systems to remove the air.
   (6) Depressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-864-001).
   (7) Make sure that the reservoir of the Green hydraulic system is correctly filled with new fluid (Ref. AMM TASK 12-12-29-611-001).
   (8) Remove the container.
Subtask 12-36-29-860-098-A
B. Put the system back to the serviceable condition.
   (1) De-energize the solenoid valve 1150GP in the MLG bay.
Subtask 12-36-29-410-062-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 197CB.
   (3) Close the engine 1 fan-cowl doors (Ref. AMM TASK 71-13-00-410-040).
   (4) Make sure that the MLG doors are closed (Ref. AMM TASK 32-12-00-410-001).
Subtask 12-36-29-410-062-B ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 197CB.
   (3) Close the engine 1 fan-cowl doors (Ref. AMM TASK 71-13-00-410-010).
   (4) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
Subtask 12-36-29-410-062-D ** ON A/C NOT FOR ALL
C. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the access door 197CB.
   (3) Close the engine 1 fan-cowl doors (Ref. AMM TASK 71-13-00-410-040).
   (4) Close the applicable MLG door (Ref. AMM TASK 32-12-00-410-001).
Subtask 12-36-29-865-051-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUHYD/HYD PWR/B WARN/& CTL2702GJC12
** ON A/C NOT FOR ALL
49VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKH12
** ON A/C NOT FOR ALL
121VUHYDRAULIC/G HYD/PUMP ENG1/CTL1701GKR35
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN30
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR34
** ON A/C ALL
121VUHYDRAULIC/Y HYD/PUMP ENG2/MONG3700GDQ37
121VUHYDRAULIC/Y HYD/PUMP ENG2/CTL3701GDQ36
** ON A/C NOT FOR ALL
121VUHYDRAULIC/HYD POWER/Y3803GXN31
121VUHYDRAULIC/G HYD/PUMP ENG1/MONG1702GKR33
** ON A/C ALL
123VUB HYD/ELEC PUMP2701GJAB09
123VUY HYD/ELEC/PUMP3802GXAB06
123VUY HYD/ELEC/ELEC PUMP/NORM3801GXAB03
Subtask 12-36-29-860-100-A
E. Put the aircraft back to the serviceable condition.
   (1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
   (2) In section 40VU of the overhead panel, push the PTU pushbutton switch. Make sure that the OFF legend goes off.
   (3) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
   (4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
   (5) Do the fluid sampling of the applicable hydraulic system (Ref. AMM TASK 12-32-29-281-001).
NOTE: Each contamination (acid number, water content and other contaminations) has a different requirements for the fluid sampling time.
[Rev.10 from 2021] 2026.04.01 04:44:06 UTC