Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
TASK 29-23-00-860-002-A
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 29-23-00-860-052-A
Subtask 29-23-00-420-050-A
Subtask 29-23-00-860-051-A
[Rev.10 from 2021]
2026.04.01 00:26:40 UTC
Connection of the Isolation Coupling of the Power Transfer Unit (PTU)
FIN: 3701GM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | PLUG - BLANKING, PLASTIC |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-10-00-864-002-A | Depressurize the Yellow Hydraulic System |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
Subtask 29-23-00-860-052-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) Make sure that the Green and Yellow hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-001) (Ref. AMM TASK 29-10-00-864-002) (Refer to the ECAM indication of the Green and Yellow system pressures and make sure that they show 0 psi).
(4) Make sure that the main doors of the main gear are open (Ref. AMM TASK 32-12-00-010-001).
(5) Make sure that the ends of the isolation couplings are clean.
4. Procedure(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(3) Make sure that the Green and Yellow hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-001) (Ref. AMM TASK 29-10-00-864-002) (Refer to the ECAM indication of the Green and Yellow system pressures and make sure that they show 0 psi).
(4) Make sure that the main doors of the main gear are open (Ref. AMM TASK 32-12-00-010-001).
(5) Make sure that the ends of the isolation couplings are clean.
Subtask 29-23-00-420-050-A
A. Connection of the isolation coupling of the PTU.
(1) Remove the PLUG - BLANKING, PLASTIC.
(2) Connect the two parts of the isolation coupling and turn the coupling mechanism until the teeth are fully engaged.
Subtask 29-23-00-790-050-A (1) Remove the PLUG - BLANKING, PLASTIC.
(2) Connect the two parts of the isolation coupling and turn the coupling mechanism until the teeth are fully engaged.
B. Leak Test
(1) Pressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-863-001).
(2) Make sure that there is no hydraulic leak.
5. Close-up(1) Pressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-863-001).
(2) Make sure that there is no hydraulic leak.
Subtask 29-23-00-860-051-A
A. Put the aircraft back to the serviceable condition.
(1) Close the main doors of the main landing gear (Ref. AMM TASK 32-12-00-410-001).
(2) Depressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-864-001).
(3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Close the main doors of the main landing gear (Ref. AMM TASK 32-12-00-410-001).
(2) Depressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-864-001).
(3) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(4) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
Isolation Coupling