Installation of the Environmental Control System (ECS) Ducts
TASK 36-11-49-400-822-A
Installation of the Environmental Control System (ECS) Ducts
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 36-11-49-860-121-A ** ON A/C NOT FOR ALL
Subtask 36-11-49-420-136-A ** ON A/C NOT FOR ALL
Subtask 36-11-49-410-178-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:11:22 UTC
Installation of the Environmental Control System (ECS) Ducts
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
ALWAYS USE APPLICABLE GLOVES TO TOUCH HOT PARTS. HOT PARTS CAN CAUSE INJURY TO PERSONS.
WARNING:
WEAR APPLICABLE PERSONAL PROTECTIVE EQUIPMENT (PPE) WHEN YOU DO THIS TASK. BEFORE YOU USE PPE, READ, UNDERSTAND AND OBEY ALL INSTRUCTIONS FOR ITS USE. THESE INSTRUCTIONS INCLUDE INSTRUCTIONS FROM THE MANUFACTURER, YOUR EMPLOYER AND GOVERNMENT REGULATIONS. YOU CAN GET INJURED IF YOU DO NOT USE PPE. GET INSTRUCTIONS FROM YOUR EMPLOYER ON WHICH PPE IS NECESSARY.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.PU1-0002) | Cable,Safety |
| (Material No.PU1-0027) | safety cable |
| (Material No.PU5-0003) | Never-Seez Pure Nickel Special |
| (Material No.PU5-0005) | anti-seize compound |
| (Material No.PU5-0005A) | Royco 81 MS Anti-Seize Compound |
| (Material No.PU5-0005B) | PT 605 Anti-Seize Compound |
| (Material No.PU5-0008) | Lubricant, Solid Film |
| (Material No.U1-0004) | Hammer, Fiber |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 454 | HOT SECTION |
| 464 | HOT SECTION |
| 191DB | |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 437AL, 438AR, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 447AL, 448AR, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 28 | SEAL | AIPC 36-11-86-20-250 |
| 33 | SEAL | AIPC 36-11-86-20-260 |
| 8 | SEAL | AIPC 36-11-86-20-270 |
| 51 | SEAL | AIPC 36-11-86-20-410 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 30-21-49-400-807-A | Installation of Nacelle Anti-Ice (NAI) Duct |
| TASK 36-11-41-400-802-A | Installation of the Environmental Control System (ECS) Mid-Y Duct and the Intermediate Pressure Check Valve (IPCV) |
| TASK 36-11-49-400-823-A | Installation of the Environmental Control System (ECS) Sense Lines |
| TASK 36-11-51-400-802-A | Installation of the HP Bleed Valve (HPV) |
| TASK 36-11-52-400-802-A | Installation of the Bleed Pressure-Regulator Valve |
| TASK 36-11-53-400-802-A | Installation of the Overpressure Valve |
| TASK 36-11-61-400-801-A | Installation of the Environmental Control System (ECS) Harness |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 71-00-00-790-802-A | Test No. 1 - Pneumatic Leak Test |
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
| TASK 78-30-00-040-805-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-805-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
| TASK 78-36-00-410-802-A | Closing of the Thrust Reverser Cowl-Doors |
Subtask 36-11-49-860-121-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) In the cockpit, on AIR COND panel 30VU:
(a) Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on).
(b) Make sure that the APU BLEED pushbutton switch is released (the ON legend is off).
(c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
(3) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
(4) On access door 191DB on the HP ground connector:
(a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
Subtask 36-11-49-865-187-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) In the cockpit, on AIR COND panel 30VU:
(a) Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on).
(b) Make sure that the APU BLEED pushbutton switch is released (the ON legend is off).
(c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
(3) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
(4) On access door 191DB on the HP ground connector:
(a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 36-11-49-010-221-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
C. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Make sure that the right thrust-reverser cowl-door is open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position below the fan cowl doors.
Subtask 36-11-49-040-152-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Make sure that the right thrust-reverser cowl-door is open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
(3) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position below the fan cowl doors.
D. Deactivation of the Thrust Reverser System for Ground Maintenance
4. ProcedureWARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Make sure that you did the deactivation of the thrust reverser system for ground maintenance (Ref. AMM TASK 78-30-00-040-805). Subtask 36-11-49-420-136-A ** ON A/C NOT FOR ALL
A. Installation of the ECS Ducts
(1) If you use the APU to energize the electrical circuits, stop the APU:
(6) Install the ECS ducts as follows:
(a) Install the ECS LP duct (27) on the engine as follows:
1 Attach the ECS LP duct (27) to the engine with the V-band couplings (29) and a new AIPC 36-11-86-20-250 SEAL (28).
3 TORQUE the bolts (52) to between 35 and 31.5 lbf.in (0.40 and 0.36 m.daN )
.
(b) Install the venturis (50) as follows:
1 Apply Never-Seez Pure Nickel Special (Material No.PU5-0003) to the threads of the bolts (49).
2 Install the venturis (50) and a new AIPC 36-11-86-20-410 SEAL (51) on the engine with the bolts (49) and the washers (48).
3 TORQUE the bolts (49) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
PU1-0002 Cable,Safety or safety cable (Material No.PU1-0027) on the bolts (49) and the Nacelle Anti Icing (NAI) duct bolt.
(c) Install the ECS HP duct (26) as follows:
1 Apply anti-seize compound (Material No.PU5-0005) or Royco 81 MS Anti-Seize Compound (Material No.PU5-0005A) or PT 605 Anti-Seize Compound (Material No.PU5-0005B) to the threads of the nuts (30).
2 Install the unions (32), the washers (31) and the nuts (30) of the ECS HP duct (26).
3 TORQUE the nuts (30) to between 150 and 130 lbf.in (1.70 and 1.47 m.daN )
.
4 Install the link assembly (47) as follows:
a If necessary, adjust the link assembly (47) to a nominal length of approximately 3.5 in. (88.90 mm).
b TORQUE the lock nuts of link assembly (47) to between 175 and 155 lbf.in (1.98 and 1.75 m.daN )
.
c On the link assembly (47), make sure that the threads of the link rod continue to cover the inspection hole.
d Apply a layer of anti-seize compound (Material No.PU5-0005) or Royco 81 MS Anti-Seize Compound (Material No.PU5-0005A) or PT 605 Anti-Seize Compound (Material No.PU5-0005B) to the threads of the nuts (43).
e Install the link assembly (47) of the ECS HP duct (26) with the bolts (46), washers (44), bushings (45) and nuts (43).
f TORQUE the nuts (43) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
7 Attach the ECS HP duct (26) to the link assembly with the bolt (38), washers (36), bushing (37) and nut (35).
(d) Install the ECS starter duct (9) as follows:
1 Apply Never-Seez Pure Nickel Special (Material No.PU5-0003) to the threads of the nut (22).
2 Install the union (24), the washer (23) and the nut (22) of the ECS starter duct (9).
3 TORQUE the nut (22) to between 150 and 140 lbf.in (1.70 and 1.58 m.daN )
.
4 Attach the ECS starter duct (9) to the Starter Air Valve (SAV) with the V-band coupling (7) and a new AIPC 36-11-86-20-270 SEAL (8).
7 Attach the ECS starter duct (9) to the link assemblies with the bolts (10) and (17), washers (11) and (15), bushings (12) and (16) and nuts (13) and (14).
(i) If you cannot adjust the ECS ducts, the valves, and the link assemblies (until there is no preload), adjust the starter duct as follows:
1 Remove the bolt (67) and the nut (65) from the rod assembly (66) and the starter duct (63).
2 Move the rod assembly (66) away from the starter duct (63).
3 Loosen the coupling (64) on the starter duct (63) from the starter.
5 Do a check of the rod assembly (66) on the starter duct (63). If the length of the link needs to be adjusted, do as follows:
b Hold the loose end of the rod assembly (66) and turn the center rod of the link to adjust it to the correct length.
c Make sure that you can see the threads of the tie rods in the inspection holes on the rod assembly (66). If you cannot see the threads, do Steps 6.(i).4_ and 6.(i).5_ again.
6 ApplyPU5-0008 Lubricant, Solid Film to the threads of the bolt (67).
7 Attach the rod assembly (66) to the starter duct (63) with the bolt (67) and the nut (65).
8 TORQUE the nut (65) to between 195 and 175 lbf.in (2.20 and 1.98 m.daN )
.
9 If you adjusted the length of the rod assembly (66), tighten the link as follows:
a Make sure that the rod assembly (66) freely rotates around the end balls of the link.
b TORQUE the jam nuts on the rod assembly (66) to between 24 and 22 lbf.in (0.27 and 0.25 m.daN )
.
c Safety the jam nuts withPU1-0027 Cable, Safety .
10 Tighten the loose coupling (64) on the starter duct (63) as follows:
a TORQUE the coupling (64) to between 115 and 100 lbf.in (1.30 and 1.13 m.daN )
.
b Tap around the outer surface of the coupling (64) with aU1-0004 Hammer, Fiber .
c TORQUE the coupling (64) again to between 115 and 100 lbf.in (1.30 and 1.13 m.daN )
.
d Tap around the outer surface of the coupling (64) again with aU1-0004 Hammer, Fiber .
e TORQUE the coupling (64) a third time to between 115 and 100 lbf.in (1.30 and 1.13 m.daN )
.
f Tap around the outer surface of the coupling (64) again with aU1-0004 Hammer, Fiber .
g TORQUE the coupling (64) to between 115 and 100 lbf.in (1.30 and 1.13 m.daN )
.
(j) Make sure that the V-band couplings (7), (29) and (34) are in the correct position to get the maximum clearance.
(k) Make sure that the V-band couplings (7) and (29) latch is adjacent to the latch arrows on the ECS starter duct (9), mid-Y duct (25) and ECS LP duct (27).
(l) TORQUE the nuts (13), (14), (21), (35) and (42) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.
(m) Tighten the V-band couplings (7), (29) and (34) as follows:
1 TORQUE the V-band couplings (7), (29) and (34) to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
.
2 Tap around the outer surface of the V-band couplings (7), (29) and (34) with a HAMMER - FIBER.
3 TORQUE the V-band couplings (7), (29) and (34) again to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
.
4 Tap around the outer surface of the V-band couplings (7), (29) and (34) again with a HAMMER - FIBER.
5 TORQUE the V-band couplings (7), (29) and (34) a third time to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
.
6 Tap around the outer surface of the V-band couplings (7), (29) and (34) again with a HAMMER - FIBER.
7 TORQUE the V-band couplings (7), (29) and (34) to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
.
8 Make sure that two full threads are shown on the screws of the V-band couplings (7), (29) and (34).
(n) Attach the component cooling tube to the ECS starter duct (9) as follows:
1 Apply Never-Seez Pure Nickel Special (Material No.PU5-0003) to the threads of the bolts (1), (3) and (5).
2 Attach the component cooling tube and the clamp to the ECS starter duct (9) with the bolt (3) and the washer (4).
3 TORQUE the bolt (3) to between 27 and 24.3 lbf.in (0.31 and 0.27 m.daN )
.
4 Attach the component cooling tube and the clamp to the ECS starter duct (9) with the bolt (5) and the washer (6).
5 TORQUE the bolt (5) to between 27 and 24.3 lbf.in (0.31 and 0.27 m.daN )
.
6 Attach the component cooling tube and the clamp to the ECS starter duct (9) with the bolt (1) and the washer (2).
7 TORQUE the bolt (1) to between 70 and 63 lbf.in (0.79 and 0.71 m.daN )
.
(o) Attach the ECS sense lines to the ECS ducts, the PRV and the HPV (Ref. AMM TASK 36-11-49-400-823).
(p) Attach the IDG EDP harness to the spring clip of the ECS LP duct (27).
(q) Connect the ECS harness to the ECS ducts, the PRV and the HPV (Ref. AMM TASK 36-11-61-400-801).
Subtask 36-11-49-865-188-A ** ON A/C NOT FOR ALL (1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
(2) Make sure that you wait for a minimum of 5 minutes until there is no pressure in the bleed-air duct system.WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Make sure that the temperature of the bleed-air duct system is in the ambient condition.CAUTION:
REMOVE THE PROTECTION COVERS FROM THE OPENINGS AS NECESSARY TO PREVENT ENGINE DAMAGE.
(4) Remove the COVER - PROTECTION from the engine. CAUTION:
WIPE CLEAN ALL PARTS AND TOOLS AS NECESSARY TO REMOVE UNWANTED DEBRIS AND PREVENT DAMAGE TO THE ENGINE.
(5) Make sure that the parts retained from the removed component are clean and in the correct condition.(6) Install the ECS ducts as follows:
(a) Install the ECS LP duct (27) on the engine as follows:
1 Attach the ECS LP duct (27) to the engine with the V-band couplings (29) and a new AIPC 36-11-86-20-250 SEAL (28).
NOTE: It is not necessary to torque the V-band coupling (29) at this time.
2 Attach the ECS LP duct (27) to the heatshield bracket with the bolts (52) and the washers (53). 3 TORQUE the bolts (52) to between 35 and 31.5 lbf.in (0.40 and 0.36 m.daN )
.(b) Install the venturis (50) as follows:
1 Apply Never-Seez Pure Nickel Special (Material No.PU5-0003) to the threads of the bolts (49).
2 Install the venturis (50) and a new AIPC 36-11-86-20-410 SEAL (51) on the engine with the bolts (49) and the washers (48).
3 TORQUE the bolts (49) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.WARNING:
USE GOGGLES WHEN YOU REMOVE OR INSTALL SAFETY CABLE. EACH TIME YOU CUT SAFETY CABLE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE SAFETY CABLE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
4 Install (c) Install the ECS HP duct (26) as follows:
1 Apply anti-seize compound (Material No.PU5-0005) or Royco 81 MS Anti-Seize Compound (Material No.PU5-0005A) or PT 605 Anti-Seize Compound (Material No.PU5-0005B) to the threads of the nuts (30).
2 Install the unions (32), the washers (31) and the nuts (30) of the ECS HP duct (26).
3 TORQUE the nuts (30) to between 150 and 130 lbf.in (1.70 and 1.47 m.daN )
.4 Install the link assembly (47) as follows:
a If necessary, adjust the link assembly (47) to a nominal length of approximately 3.5 in. (88.90 mm).
b TORQUE the lock nuts of link assembly (47) to between 175 and 155 lbf.in (1.98 and 1.75 m.daN )
.c On the link assembly (47), make sure that the threads of the link rod continue to cover the inspection hole.
d Apply a layer of anti-seize compound (Material No.PU5-0005) or Royco 81 MS Anti-Seize Compound (Material No.PU5-0005A) or PT 605 Anti-Seize Compound (Material No.PU5-0005B) to the threads of the nuts (43).
e Install the link assembly (47) of the ECS HP duct (26) with the bolts (46), washers (44), bushings (45) and nuts (43).
f TORQUE the nuts (43) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
.CAUTION:
INSTALL THE V-BAND COUPLINGS AS SHOWN IN THE FIGURE. DO NOT USE THE LATCH MARKINGS TO FIND THE POSITION OF THE COUPLINGS. IF YOU DO NOT OBEY THESE INSTRUCTIONS, DAMAGE TO THE EQUIPMENT CAN OCCUR.
5 Attach the ECS HP duct (26) to the venturis (50) with the V-band couplings (34) and a new AIPC 36-11-86-20-260 SEAL (33).NOTE: It is not necessary to torque the V-band couplings (34) at this time.
6 Apply a layer of anti-seize compound (Material No.PU5-0005) or Royco 81 MS Anti-Seize Compound (Material No.PU5-0005A) or PT 605 Anti-Seize Compound (Material No.PU5-0005B) to the threads of the nuts (35) and (42). 7 Attach the ECS HP duct (26) to the link assembly with the bolt (38), washers (36), bushing (37) and nut (35).
NOTE: It is not necessary to torque the nut (35) at this time.
8 Attach the ECS HP duct (26) to the link assembly with the bolt (39), washers (40), bushing (41) and nut (42). NOTE: It is not necessary to torque the nut (42) at this time.
9 Attach the anti-ice sense tubes to the ECS HP duct (26) (Ref. AMM TASK 30-21-49-400-807). (d) Install the ECS starter duct (9) as follows:
1 Apply Never-Seez Pure Nickel Special (Material No.PU5-0003) to the threads of the nut (22).
2 Install the union (24), the washer (23) and the nut (22) of the ECS starter duct (9).
3 TORQUE the nut (22) to between 150 and 140 lbf.in (1.70 and 1.58 m.daN )
. 4 Attach the ECS starter duct (9) to the Starter Air Valve (SAV) with the V-band coupling (7) and a new AIPC 36-11-86-20-270 SEAL (8).
NOTE: It is not necessary to torque the V-band coupling (7) at this time.
5 Attach the overpressure valve to the ECS starter duct (9) with the V-band coupling (7) and the seal (8) (Ref. AMM TASK 36-11-53-400-802).NOTE: It is not necessary to torque the V-band coupling (7) at this time.
6 Apply a layer of anti-seize compound (Material No.PU5-0005) or Royco 81 MS Anti-Seize Compound (Material No.PU5-0005A) or PT 605 Anti-Seize Compound (Material No.PU5-0005B) to the threads of the nuts (13), (14) and (21). 7 Attach the ECS starter duct (9) to the link assemblies with the bolts (10) and (17), washers (11) and (15), bushings (12) and (16) and nuts (13) and (14).
NOTE: It is not necessary to torque the nuts (13) and (14) at this time.
8 Attach the ECS starter duct (9) to the link assembly with the bolt (18), washers (19), bushing (20) and nut (21).NOTE: It is not necessary to torque the nut (21).
(e) Install the HP Bleed Valve (HPV) with the V-band coupling (7) and the seal (8) of the ECS HP duct (26) (Ref. AMM TASK 36-11-51-400-802). NOTE: It is not necessary to torque the V-band coupling (7) at this time.
(f) Install the Pressure Regulating Valve (PRV) with the V-band coupling (7) and the seal (8) of the ECS starter duct (9) (Ref. AMM TASK 36-11-52-400-802). NOTE: It is not necessary to torque the V-band coupling (7) at this time.
(g) Install the intermediate pressure check-valve with the mid-Y duct (25), the V-band couplings (7) and the seal (8) of the PRV, the HPV and the ECS LP duct (27) (Ref. AMM TASK 36-11-41-400-802). NOTE: It is not necessary to torque the V-band coupling (7) at this time.
CAUTION:
MAKE SURE THAT:
(h) Adjust the ECS ducts, the valves and the link assemblies until there is no preload. - THERE IS NO TENSION ON THE LINK ASSEMBLIES FOR THE ECS DUCTS
- THE MATING SURFACES BETWEEN THE DUCTS CORRECTLY ALIGN.
(i) If you cannot adjust the ECS ducts, the valves, and the link assemblies (until there is no preload), adjust the starter duct as follows:
1 Remove the bolt (67) and the nut (65) from the rod assembly (66) and the starter duct (63).
2 Move the rod assembly (66) away from the starter duct (63).
3 Loosen the coupling (64) on the starter duct (63) from the starter.
CAUTION:
MAKE SURE THAT:
4 Adjust the starter duct (63), ECS ducts, valves and link assemblies until there is no preload.- THERE IS NO TENSION ON THE LINK ASSEMBLIES FOR THE ECS DUCTS
- THE MATING SURFACES BETWEEN THE DUCTS CORRECTLY ALIGN.
5 Do a check of the rod assembly (66) on the starter duct (63). If the length of the link needs to be adjusted, do as follows:
WARNING:
USE GOGGLES WHEN YOU REMOVE OR INSTALL SAFETY CABLE. EACH TIME YOU CUT SAFETY CABLE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE SAFETY CABLE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
a Remove and discard the safety cables on the jam nuts on the rod assembly (66).b Hold the loose end of the rod assembly (66) and turn the center rod of the link to adjust it to the correct length.
c Make sure that you can see the threads of the tie rods in the inspection holes on the rod assembly (66). If you cannot see the threads, do Steps 6.(i).4_ and 6.(i).5_ again.
6 Apply
7 Attach the rod assembly (66) to the starter duct (63) with the bolt (67) and the nut (65).
8 TORQUE the nut (65) to between 195 and 175 lbf.in (2.20 and 1.98 m.daN )
.9 If you adjusted the length of the rod assembly (66), tighten the link as follows:
a Make sure that the rod assembly (66) freely rotates around the end balls of the link.
b TORQUE the jam nuts on the rod assembly (66) to between 24 and 22 lbf.in (0.27 and 0.25 m.daN )
.c Safety the jam nuts with
10 Tighten the loose coupling (64) on the starter duct (63) as follows:
a TORQUE the coupling (64) to between 115 and 100 lbf.in (1.30 and 1.13 m.daN )
.b Tap around the outer surface of the coupling (64) with a
c TORQUE the coupling (64) again to between 115 and 100 lbf.in (1.30 and 1.13 m.daN )
.d Tap around the outer surface of the coupling (64) again with a
e TORQUE the coupling (64) a third time to between 115 and 100 lbf.in (1.30 and 1.13 m.daN )
.f Tap around the outer surface of the coupling (64) again with a
g TORQUE the coupling (64) to between 115 and 100 lbf.in (1.30 and 1.13 m.daN )
.(j) Make sure that the V-band couplings (7), (29) and (34) are in the correct position to get the maximum clearance.
(k) Make sure that the V-band couplings (7) and (29) latch is adjacent to the latch arrows on the ECS starter duct (9), mid-Y duct (25) and ECS LP duct (27).
(l) TORQUE the nuts (13), (14), (21), (35) and (42) to between 70 and 55 lbf.in (0.79 and 0.62 m.daN )
. (m) Tighten the V-band couplings (7), (29) and (34) as follows:
1 TORQUE the V-band couplings (7), (29) and (34) to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
. 2 Tap around the outer surface of the V-band couplings (7), (29) and (34) with a HAMMER - FIBER.
3 TORQUE the V-band couplings (7), (29) and (34) again to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
. 4 Tap around the outer surface of the V-band couplings (7), (29) and (34) again with a HAMMER - FIBER.
5 TORQUE the V-band couplings (7), (29) and (34) a third time to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
. 6 Tap around the outer surface of the V-band couplings (7), (29) and (34) again with a HAMMER - FIBER.
7 TORQUE the V-band couplings (7), (29) and (34) to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
. 8 Make sure that two full threads are shown on the screws of the V-band couplings (7), (29) and (34).
(n) Attach the component cooling tube to the ECS starter duct (9) as follows:
1 Apply Never-Seez Pure Nickel Special (Material No.PU5-0003) to the threads of the bolts (1), (3) and (5).
2 Attach the component cooling tube and the clamp to the ECS starter duct (9) with the bolt (3) and the washer (4).
3 TORQUE the bolt (3) to between 27 and 24.3 lbf.in (0.31 and 0.27 m.daN )
. 4 Attach the component cooling tube and the clamp to the ECS starter duct (9) with the bolt (5) and the washer (6).
5 TORQUE the bolt (5) to between 27 and 24.3 lbf.in (0.31 and 0.27 m.daN )
. 6 Attach the component cooling tube and the clamp to the ECS starter duct (9) with the bolt (1) and the washer (2).
7 TORQUE the bolt (1) to between 70 and 63 lbf.in (0.79 and 0.71 m.daN )
. (o) Attach the ECS sense lines to the ECS ducts, the PRV and the HPV (Ref. AMM TASK 36-11-49-400-823).
(p) Attach the IDG EDP harness to the spring clip of the ECS LP duct (27).
(q) Connect the ECS harness to the ECS ducts, the PRV and the HPV (Ref. AMM TASK 36-11-61-400-801).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-11-49-720-097-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
Subtask 36-11-49-410-178-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust-reverser cowl-door (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
Subtask 36-11-49-440-111-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust-reverser cowl-door (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
B. Do the reactivation of the thrust reverser system after ground maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 36-11-49-410-179-A ** ON A/C NOT FOR ALL C. Close Access
(1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
Subtask 36-11-49-862-108-A ** ON A/C NOT FOR ALL (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Remove the access platform(s).
(3) Remove the WARNING NOTICE(S).
D. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
Environmental Control System (ECS) Ducts