APU Shutdown by External Power (131-9(A))
TASK 49-00-00-860-009-A
APU Shutdown by External Power (131-9(A))
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 49-00-00-860-090-A ** ON A/C NOT FOR ALL
Subtask 49-00-00-860-091-A ** ON A/C NOT FOR ALL
5. Close-up
Subtask 49-00-00-860-092-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:25:44 UTC
APU Shutdown by External Power (131-9(A))
FIN: 4005KM ** ON A/C NOT FOR ALL
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 811 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-33-21-618-001-A | Pre-conditioning through the LP Ground Connection (Aircraft Electrical Power Available) |
| TASK 12-33-21-618-001-A-01 | Pre-conditioning through the HP Ground Connection |
| TASK 12-33-21-618-001-A-02 | Pre-conditioning with the APU |
| TASK 12-33-21-618-001-A-03 | Pre-conditioning through the LP Ground Connection (Aircraft Electrical Power Not Available) |
| TASK 24-42-00-861-001-A | Energize the Ground Service Network from the External Power |
| TASK 24-42-00-862-001-A | De-energize the Ground Service Network Supplied from the External Power |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 49-00-00-910-003-A | Safety Precautions for the Operation of the APU (131-9(A)) |
| TASK 52-41-00-410-002-A | Close the Avionics Compartment Doors after Access |
Subtask 49-00-00-860-090-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(2) If the APU has supplied bleed air to other aircraft system(s):
4. Procedure(1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(2) If the APU has supplied bleed air to other aircraft system(s):
- do the preconditioning through the HP ground connection (Ref. AMM TASK 12-33-21-618-001).
- on cockpit panel 30VU push the APU BLEED p/bsw to stop the APU bleed supply.
- energize the aircraft electrical circuits (Ref. AMM TASK 24-42-00-861-001).
- on panel 35VU push the APU GEN p/bsw to stop the APU electrical power supply.
Subtask 49-00-00-860-091-A ** ON A/C NOT FOR ALL
CAUTION:
OBEY THE SAFETY PRECAUTIONS.
CAUTION:
DO NOT SET THE BATTERIES TO OFF BEFORE THE AIR INTAKE FLAP IS FULLY CLOSED.
IF YOU SET THE BATTERIES TO OFF, AN UNWANTED SHUTDOWN OF THE APU CAN OCCUR IF THERE IS:
A. Shutdown of the APU - POWER TRANSFER FROM THE APU GEN TO EXTERNAL POWER, OR
- DISCONNECTION OF THE EXTERNAL POWER.
- OIL FUMES AND/OR SMOKE IN THE CABIN
- AN INCORRECT LOW OIL LEVEL INDICATION ON THE ECAM APU SYSTEM PAGE.
NOTE: Obey the safety precautions for the operation of the APU (Ref. AMM TASK 49-00-00-910-003).
| ACTION | RESULT |
|---|---|
1.On the APU section on the panel 25VU:
| On the APU section on the panel 25VU:
|
| | After the cooldown cycle is complete:
|
| | On the APU section on the panel 25VU:
|
| | On the APU page on the lower ECAM DU:
|
Subtask 49-00-00-860-092-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002), if not longer necessary.
(2) Make sure that the APU air intake-flap is closed.
(3) Stop the HP pre-conditioning (Ref. AMM TASK 12-33-21-618-001), if not longer necessary.
(4) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001), if not longer necessary.
(5) Remove the WARNING NOTICE(S).
(6) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002), if not longer necessary.
(2) Make sure that the APU air intake-flap is closed.
(3) Stop the HP pre-conditioning (Ref. AMM TASK 12-33-21-618-001), if not longer necessary.
(4) De-energize the ground service network
(Ref. AMM TASK 24-42-00-862-001), if not longer necessary.
(5) Remove the WARNING NOTICE(S).
(6) Close access door 811 (Ref. AMM TASK 52-41-00-410-002).