Installation of the HP Bleed Valve (HPV)
TASK 36-11-51-400-802-A
Installation of the HP Bleed Valve (HPV)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 36-11-51-860-068-A ** ON A/C NOT FOR ALL
Subtask 36-11-51-420-060-A ** ON A/C NOT FOR ALL
Subtask 36-11-51-410-087-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:12:21 UTC
Installation of the HP Bleed Valve (HPV)
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING:
ALWAYS USE APPLICABLE GLOVES TO TOUCH HOT PARTS. HOT PARTS CAN CAUSE INJURY TO PERSONS.
WARNING:
WEAR APPLICABLE PERSONAL PROTECTIVE EQUIPMENT (PPE) WHEN YOU DO THIS TASK. BEFORE YOU USE PPE, READ, UNDERSTAND AND OBEY ALL INSTRUCTIONS FOR ITS USE. THESE INSTRUCTIONS INCLUDE INSTRUCTIONS FROM THE MANUFACTURER, YOUR EMPLOYER AND GOVERNMENT REGULATIONS. YOU CAN GET INJURED IF YOU DO NOT USE PPE. GET INSTRUCTIONS FROM YOUR EMPLOYER ON WHICH PPE IS NECESSARY.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.PU5-0005) | anti-seize compound |
| (Material No.PU5-0005A) | Royco 81 MS Anti-Seize Compound |
| (Material No.PU5-0005B) | PT 605 Anti-Seize Compound |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 454 | HOT SECTION |
| 464 | HOT SECTION |
| 191DB | |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1) | |
| 437AL, 438AR, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2) | |
| 447AL, 448AR, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 3 | SEAL | AIPC 36-11-86-20-270 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 36-11-41-400-802-A | Installation of the Environmental Control System (ECS) Mid-Y Duct and the Intermediate Pressure Check Valve (IPCV) |
| TASK 36-11-49-400-822-A | Installation of the Environmental Control System (ECS) Ducts |
| TASK 36-11-49-400-823-A | Installation of the Environmental Control System (ECS) Sense Lines |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 71-00-00-790-802-A | Test No. 1 - Pneumatic Leak Test |
| TASK 71-00-00-860-833-A | Procedure to Prevent Engine Motoring |
| TASK 71-13-00-010-802-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-802-A | Closing of the Fan Cowl Doors |
| TASK 78-30-00-040-805-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-805-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-802-A | Opening of the Thrust Reverser Cowl-Doors |
| TASK 78-36-00-410-802-A | Closing of the Thrust Reverser Cowl-Doors |
Subtask 36-11-51-860-068-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) On AIR COND panel 30VU:
(a) Make sure that the ENG 1(2) BLEED pushbutton-switch is released (OFF legend is on).
(b) Make sure that the APU BLEED pushbutton-switch is released (ON legend is off).
(c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
(3) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
(4) On access door 191DB, on the HP ground connector:
(a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
Subtask 36-11-51-865-070-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) On AIR COND panel 30VU:
(a) Make sure that the ENG 1(2) BLEED pushbutton-switch is released (OFF legend is on).
(b) Make sure that the APU BLEED pushbutton-switch is released (ON legend is off).
(c) Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
(3) Make sure that you did the procedure to prevent engine motoring
(Ref. AMM TASK 71-00-00-860-833).
(4) On access door 191DB, on the HP ground connector:
(a) Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 36-11-51-010-092-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
C. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR
(2) Make sure that the right thrust-reverser cowl-door is open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
Subtask 36-11-51-040-075-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR
(2) Make sure that the right thrust-reverser cowl-door is open (Ref. AMM TASK 78-36-00-010-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
D. Deactivation of the Thrust Reverser System for Ground Maintenance
4. ProcedureWARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Make sure that you did the deactivation of the thrust reverser system for ground maintenance (Ref. AMM TASK 78-30-00-040-805). Subtask 36-11-51-420-060-A ** ON A/C NOT FOR ALL
A. Installation of the HPV
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(a) Remove the COVER - PROTECTION from the HPV (1), harness assembly connector (4000HA-A), HPV muscle sense-tube and HP duct.
(b) Visually examine the HPV (1) as follows:
1 Look for the unwanted objects, cracks, corrosion, other damage and correct assembly.
(c) Put the new AIPC 36-11-86-20-270 SEAL (3) with the HPV (1) in the correct position on the HP duct.
(d) Make sure that the flow direction arrow on the valve is pointed in the correct direction.
(e) Attach the HPV (1) to the HP duct with the V-band coupling (2) as follows:
1 Put the V-band coupling (2) latch adjacent to the latch arrow on the HP duct.
2 Make sure that you do not torque the V-band coupling (2) at this time.
(f) Install the mid-Y duct and the intermediate pressure check-valve (Ref. AMM TASK 36-11-41-400-802):
1 Do not install the HPV muscle sense-tube at this time.
2 Do not tighten the V-band couplings, bolts, nuts, pylon HPV sense-tube or link assemblies at this time.
(h) Carefully install the HPV muscle sense-tube on the HPV (1) and the mid-Y duct:
1 Make sure that you do not torque the muscle sense-tube fittings at this time.
(k) Torque the V-band couplings, bolts, nuts, link assemblies and pylon HPV sense-tube-fitting (Ref. AMM TASK 36-11-41-400-802).
(l) Put the V-band coupling (2) in the approximate position. Refer to sheet 2 in the Figure.
(m) Tighten the V-band coupling (2) that attaches the HPV (1) as follows:
1 TORQUE the V-band coupling (2) to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
.
2 Tap around the outer surface of the V-band coupling (2) with a HAMMER - FIBER.
3 TORQUE the V-band coupling (2) again to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
.
4 Tap around the outer surface of the V-band coupling (2) again with a HAMMER - FIBER.
5 TORQUE the V-band coupling (2) a third time to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
.
6 Tap around the outer surface of the V-band coupling (2) again with a HAMMER - FIBER.
7 TORQUE the V-band coupling (2) to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
.
8 Make sure that the two full threads are shown on the V-band coupling (2).
1 Make sure that the electrical connector is clean and in the correct condition.
2 Connect the ECS harness connector (4000HA-A) to the HPV (1).
3 Tighten the connector finger as follows:
a Turn the connector 1/4 turn more with the PLIERS - CONNECTOR, JAW, SOFT.
(o) Make sure that the HPV (1), pylon HPV sense-tube, PRV muscle sense-tube and HPV muscle sense-tube are correctly installed as follows:
1 Make sure that the HPV (1), pylon HPV sense-tube, PRV muscle sense-tube and HPV muscle sense-tube are not damaged.
2 Make sure that the V-band coupling (2) is in the correct position and correctly engages and aligns with the HPV (1) and the adjacent ducts.
3 Make sure that the HPV (1), the mid-Y duct and the HP duct are correctly aligned.
4 Make sure that the V-band couplings are engaged in the correct position.
Subtask 36-11-51-865-071-A ** ON A/C NOT FOR ALL (1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
CAUTION:
REMOVE THE PROTECTION COVERS FROM THE OPENINGS AS NECESSARY TO PREVENT ENGINE DAMAGE.
CAUTION:
WIPE CLEAN ALL PARTS AND TOOLS AS NECESSARY TO REMOVE UNWANTED DEBRIS AND PREVENT DAMAGE TO THE ENGINE.
(3) Install the HPV (1) as follows:(a) Remove the COVER - PROTECTION from the HPV (1), harness assembly connector (4000HA-A), HPV muscle sense-tube and HP duct.
(b) Visually examine the HPV (1) as follows:
1 Look for the unwanted objects, cracks, corrosion, other damage and correct assembly.
(c) Put the new AIPC 36-11-86-20-270 SEAL (3) with the HPV (1) in the correct position on the HP duct.
(d) Make sure that the flow direction arrow on the valve is pointed in the correct direction.
(e) Attach the HPV (1) to the HP duct with the V-band coupling (2) as follows:
1 Put the V-band coupling (2) latch adjacent to the latch arrow on the HP duct.
2 Make sure that you do not torque the V-band coupling (2) at this time.
(f) Install the mid-Y duct and the intermediate pressure check-valve (Ref. AMM TASK 36-11-41-400-802):
1 Do not install the HPV muscle sense-tube at this time.
2 Do not tighten the V-band couplings, bolts, nuts, pylon HPV sense-tube or link assemblies at this time.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
DO NOT GET THE ANTI-SEIZE COMPOUND IN THE SENSE LINES. MAKE SURE THAT YOU APPLY THE ANTI-SEIZE COMPOUND ONLY TO THE THREADS OF THE FITTINGS. IF YOU DO NOT OBEY THESE INSTRUCTIONS, DAMAGE TO THE VALVES CAN OCCUR.
(g) Apply a layer of anti-seize compound (Material No.PU5-0005) or Royco 81 MS Anti-Seize Compound (Material No.PU5-0005A) or PT 605 Anti-Seize Compound (Material No.PU5-0005B) to the threads of the fittings on the HPV muscle sense-tube, the HPV (1) and the mid-Y duct. (h) Carefully install the HPV muscle sense-tube on the HPV (1) and the mid-Y duct:
1 Make sure that you do not torque the muscle sense-tube fittings at this time.
CAUTION:
MAKE SURE THAT:
(i) As necessary, adjust the HPV (1), Pressure Regulating Valve (PRV), Environmental Control System (ECS) ducts and sense lines to remove the load on the ECS system (Ref. AMM TASK 36-11-49-400-822) and (Ref. AMM TASK 36-11-49-400-823). - THERE IS NO TENSION ON THE LINK ASSEMBLIES FOR THE ECS DUCTS
- THE MATING SURFACES BETWEEN THE DUCTS CORRECTLY ALIGN.
CAUTION:
USE A SECOND WRENCH TO HOLD THE MATING PARTS WHEN YOU LOOSEN OR TIGHTEN THE TUBE OR HOSE NUTS. IF YOU DO NOT OBEY THIS INSTRUCTION, YOU CAN TWIST THE TUBES OR HOSES OR CAUSE DAMAGE TO THEM.
(j) Torque the HPV muscle sense-tube-fittings (Ref. AMM TASK 36-11-49-400-823). (k) Torque the V-band couplings, bolts, nuts, link assemblies and pylon HPV sense-tube-fitting (Ref. AMM TASK 36-11-41-400-802).
(l) Put the V-band coupling (2) in the approximate position. Refer to sheet 2 in the Figure.
(m) Tighten the V-band coupling (2) that attaches the HPV (1) as follows:
1 TORQUE the V-band coupling (2) to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
. 2 Tap around the outer surface of the V-band coupling (2) with a HAMMER - FIBER.
3 TORQUE the V-band coupling (2) again to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
. 4 Tap around the outer surface of the V-band coupling (2) again with a HAMMER - FIBER.
5 TORQUE the V-band coupling (2) a third time to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
. 6 Tap around the outer surface of the V-band coupling (2) again with a HAMMER - FIBER.
7 TORQUE the V-band coupling (2) to between 125 and 115 lbf.in (1.41 and 1.30 m.daN )
. 8 Make sure that the two full threads are shown on the V-band coupling (2).
CAUTION:
MAKE SURE THAT THE ELECTRICAL CONNECTOR IS CLEAN BEFORE YOU CONNECT IT. DIRTY ELECTRICAL CONNECTORS CAN CAUSE THRUST REVERSER PROBLEMS.
CAUTION:
USE TEFLON-JAWED PLIERS TO LOOSEN/TIGHTEN ELECTRICAL CONNECTORS. DO NOT USE METAL-JAWED PLIERS. IF YOU DO NOT OBEY THIS INSTRUCTION, DAMAGE TO THE ELECTRICAL CONNECTORS CAN OCCUR.
(n) Connect the ECS electrical harness as follows:1 Make sure that the electrical connector is clean and in the correct condition.
2 Connect the ECS harness connector (4000HA-A) to the HPV (1).
3 Tighten the connector finger as follows:
a Turn the connector 1/4 turn more with the PLIERS - CONNECTOR, JAW, SOFT.
(o) Make sure that the HPV (1), pylon HPV sense-tube, PRV muscle sense-tube and HPV muscle sense-tube are correctly installed as follows:
1 Make sure that the HPV (1), pylon HPV sense-tube, PRV muscle sense-tube and HPV muscle sense-tube are not damaged.
2 Make sure that the V-band coupling (2) is in the correct position and correctly engages and aligns with the HPV (1) and the adjacent ducts.
3 Make sure that the HPV (1), the mid-Y duct and the HP duct are correctly aligned.
4 Make sure that the V-band couplings are engaged in the correct position.
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-11-51-720-074-A ** ON A/C NOT FOR ALL 5. Close-up| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 2/MONG | 3HA2 | D12 |
| 49VU | AIR BLEED/ENG 1/CTL | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 1/MONG | 3HA1 | Z23 |
| 122VU | AIR BLEED/ENG 2/CTL | 2HA2 | Z22 |
Subtask 36-11-51-410-087-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust-reverser cowl-door (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
Subtask 36-11-51-440-069-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the right thrust-reverser cowl-door (Ref. AMM TASK 78-36-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR
B. Do the reactivation of the thrust reverser system after ground maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 36-11-51-410-088-A ** ON A/C NOT FOR ALL C. Close Access
(1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
Subtask 36-11-51-862-066-A ** ON A/C NOT FOR ALL (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL 438AR
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
D. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
HP Bleed Valve