W DOC AIRBUS | AMM A320F

Installation of the NLG Uplock Assy


TASK 32-31-21-400-001-A
Installation of the NLG Uplock Assy


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 124
FIN: 2530GM
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
CONTAINER 5 L (1.32 USGAL)
No specific
AR
SAFETY BARRIER(S)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.649 and 0.531 m.daN (57.43 and 46.99 lbf.in ) T
No specific
Torque wrench: range to between 0.8 and 0.7 m.daN (70.80 and 61.95 lbf.in ) T
No specific
Torque wrench: range to between 1.6 and 1.4 m.daN (11.80 and 10.32 lbf.ft ) T
No specific
Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) T
98A27901002000
1
PIN-RIGGING,RUDDER CONTROL
98A32301000000
1
RIGGING PIN
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03GBB1)
Synthetic Oil base Grease-General Purpose Clay Thickened -
(Material No.03HBD9)
Synthetic Ester base Grease-General Purpose Low Temp -
(Material No.08BBB1)
Non Aqueous Cleaner-- Petroleum Based -
(Material No.12ACC1)
Corrosion Preventive Compound-Heavy Duty Soft Film -
No specific
lockwire corrosion resistant steel dia. 0.8 mm (0.03in)
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
124
NOSE GEAR WELL
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
3
COTTER PIN
AIPC 32-31-01-07-010
4
COTTER PIN
AIPC 32-31-01-07-010
7
WASHERS
AIPC 32-31-01-07-050
7
WASHERS
AIPC 32-31-01-07-060
3
COTTER PIN
AIPC 32-31-81-07-010
4
COTTER PIN
AIPC 32-31-81-07-010
13
COTTER PIN
AIPC 32-33-01-07-010
27
COTTER PIN
AIPC 32-33-01-07-010
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 12-12-29-611-001-A
Fill the Hydraulic Fluid Reservoir with a Hand Pump
TASK 20-23-22-910-001-A
Marking of the Unions after Application of Standard or Specific Tightening Torque
TASK 29-00-00-864-001-A
Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action
TASK 29-14-00-614-001-A
Depressurization of the Hydraulic Reservoirs
TASK 32-00-00-860-001-A
Flight Configuration Precautions with Electrical Power
TASK 32-00-00-860-001-A-01
Flight Configuration Precautions without Electrical Power
TASK 32-00-00-860-002-A
Ground Configuration after Flight Configuration with Electrical Power
TASK 32-00-00-860-002-A-01
Ground Configuration after Flight Configuration without Electrical Power
TASK 32-22-00-010-001-A
Nose Gear Doors - Ground Doors Opening
TASK 32-22-00-410-001-A
Nose Gear Doors - Ground Doors Closing
TASK 32-30-00-867-001-A
Retraction of the Landing Gears for Maintenance
TASK 32-30-00-867-002-A
Extension of the Landing Gears after Maintenance
TASK 32-31-00-720-003-A
Functional Test of the Normal Extension and Retraction of the Nose Landing Gear
TASK 32-33-00-720-001-A
Functional Check of Free-Fall Extension
TASK 32-33-00-720-004-A
Functional Test of the NLG Free-Fall Extension
TASK 12-22-00-00
LUBRICATION - DESCRIPTION AND OPERATION
F NLG Uplock Assy ** ON A/C NOT FOR ALL
F NLG Uplock Assy ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 32-31-21-860-051-A
A. Aircraft Maintenance Configuration
   (1) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration.
(Ref. AMM TASK 29-00-00-864-001)
   (2) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
   (3) In the cockpit, on the panel 400VU, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to operate the landing gear control lever.
   (4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
  • on the panel 40VU in the cockpit,
  • on the ground service panel of the Green hydraulic system, access door (197CB).
   (5) Make sure that the SAFETY BARRIER(S) are in position.
   (6) Make sure that the CONTAINER 5 L (1.32 USGAL) is in position below the NLG uplock assy (2530GM).
   (7) Make sure that the doors of the nose landing gear are open (Ref. AMM TASK 32-22-00-010-001).
   (8) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position in zone 123.
   (9) Make sure that you obeyed the flight configuration precautions (Ref. AMM TASK 32-00-00-860-001).
Subtask 32-31-21-865-051-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
4. Procedure
Subtask 32-31-21-110-050-A
A. Preparation for Installation
   (1) Clean the surfaces and the connection elements with Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) and dry with filtered compressed air.
   (2) Apply a light coat of Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) or Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) on the hardware.
NOTE: For lubricant grease specification and lubrication requirements, refer to (Ref. AMM D/O 12-22-00-00).
Subtask 32-31-21-420-050-A ** ON A/C NOT FOR ALL Subtask 32-31-21-420-050-B ** ON A/C NOT FOR ALL Subtask 32-31-21-420-052-A
C. Connection of the Rod
   (1) Install the
98A32301000000 RIGGING PIN (18) on the uplock assy (12).
   (2) Install the 98A27901002000 PIN-RIGGING,RUDDER CONTROL (19) on the bellcrank (24).
   (3) Put the rod (23) in position on the lever (16). Make sure that you can install the screw (20).
   (4) If you cannot install the screw (20), adjust the rod (23) as follows:
     (a) Remove and discard the lockwire.
     (b) Remove the nuts (21).
     (c) Release the washers (22) and adjust the rod (23) length to make the screw (20) installation easier.
     (d) TORQUE the nuts (21) to between 0.649 and 0.531 m.daN (57.43 and 46.99 lbf.in ) T.
     (e) Safety the nuts (21) with lockwire corrosion resistant steel dia. 0.8 mm (0.03in).
     (f) Put the rod (23) in position and install the screw (20).
   (5) Install the washer (25) and the nut (26).
   (6) TORQUE the nut (26) to between 0.8 and 0.7 m.daN (70.80 and 61.95 lbf.in )
T.
   (7) Safety it with the new
AIPC 32-33-01-07-010 COTTER PIN (27).
   (8) Remove the blanking caps and install the hydraulic lines (10) and (11).
   (9) TORQUE the hydraulic lines (10) and (11) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
T.
   (10) Identify the tightened union nuts with a red line
(
Ref. AMM TASK 20-23-22-910-001).
   (11) Remove the blanking plugs and connect the electrical connectors (8) and (9).
   (12) Remove the 98A27901002000 PIN-RIGGING,RUDDER CONTROL (19) and 98A32301000000 RIGGING PIN (18).
   (13) Apply a light coat of Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) in zones E.
Subtask 32-31-21-865-053-A
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
49VUL/G/LGCIU/SYS1/NORM1GAC09
121VUHYDRAULIC/LGCIU/SYS22GAQ35
121VUHYDRAULIC/LGCIU/SYS1/GRND SPLY52GAQ34
Subtask 32-31-21-869-053-A
E. After you close the LGCIU circuit breakers, put the aircraft back to the correct (ground) condition (Ref. AMM TASK 32-00-00-860-002).
Subtask 32-31-21-941-053-A
F. Preparation for the Test
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Remove the container below the NLG uplock assy (2530GM).
   (3) Make sure that the NLG uplock assy (2530GM) is in the OPEN configuration.
   (4) Make sure that the travel range of the landing gear is clean.
   (5) Remove the access platform below the NLG uplock assy (2530GM).
   (6) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
   (7) Do five full retraction and extension cycles of the nose landing gear at low speed to bleed the system (Ref. AMM TASK 32-30-00-867-001) and (Ref. AMM TASK 32-30-00-867-002).
     (a) Make sure that each retraction and extension cycle is of more than 30 seconds.
Subtask 32-31-21-720-050-A
G. Functional Test
   (1) Do the functional test of the NLG normal extension and retraction (Ref. AMM TASK 32-31-00-720-003).
   (2) Do one of the two steps that follow:
     (a) Do the functional check of the free-fall system (Ref. AMM TASK 32-33-00-720-001).
     (b) Do the functional test of the NLG free-fall extension (Ref. AMM TASK 32-33-00-720-004).
   (3) Open the NLG doors (Ref. AMM TASK 32-22-00-010-001).
   (4) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position below the NLG uplock assy (12).
   (5) Make sure that there are no leaks on the disconnected line ends.
   (6) If necessary, fill the reservoir of the Green hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
5. Close-up
Subtask 32-31-21-410-050-A
A. Close Access
   (1) Remove the WARNING NOTICE(S).
   (2) Remove the access platform(s).
   (3) Make sure that the work area is clean and clear of tools and other items.
   (4) Close the doors of the nose landing gear (Ref. AMM TASK 32-22-00-410-001).
[Rev.10 from 2021] 2026.04.01 04:10:50 UTC