Installation of the Landing Gear Safety-Valve
TASK 32-31-17-400-001-A
Installation of the Landing Gear Safety-Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 32-31-17-860-051-A
Subtask 32-31-17-420-050-A
Subtask 32-31-17-410-050-A
[Rev.10 from 2021]
2026.04.01 12:31:03 UTC
Installation of the Landing Gear Safety-Valve
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WORK ON THE HYDRAULIC SYSTEMS CAN BE DANGEROUS.
WARNING:
DO NOT GET HYDRAULIC FLUID ON YOUR SKIN, IN YOUR EYES OR IN YOUR MOUTH. HYDRAULIC FLUID IS POISONOUS AND CAN GO THROUGH YOUR SKIN AND INTO YOUR BODY. FLUSH HYDRAULIC FLUID FROM YOUR EYES, MOUTH OR SKIN WITH WATER. GET MEDICAL AID IF YOU GET HYDRAULIC FLUID IN YOUR EYES OR MOUTH.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 49GA
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 2 | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 1.4 and 1.2 m.daN (123.89 and 106.19 lbf.in ) ![]() |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.04SAB2) | Varnish Polyurethane-- Marking Structure |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 16 | PACKING | AIPC 32-31-17-01-050 |
| 15 | BACK-UP RING | AIPC 32-31-17-01-060 |
| 13 | BACK-UP RING | AIPC 32-31-17-01-070 |
| 12 | SQUARE SEAL | AIPC 32-31-17-01-080 |
| 2 | PACKING | AIPC 32-31-17-01-100 |
| 3 | BACK-UP RING | AIPC 32-31-17-01-110 |
| 5 | BACK-UP RING | AIPC 32-31-17-01-120 |
| 6 | SQUARE SEAL | AIPC 32-31-17-01-130 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 20-23-21-911-001-A | Removal/Installation of the Bobbins from their Housings and Installation of O-rings, Square Seals, and Back-up Rings on the Bobbins |
| TASK 20-28-00-912-802-A | Electrical Bonding - General Maintenance Procedure |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-31-00-710-005-A | Operational Check to Ensure Safety Valve Closes at 260 Knots |
| TASK 32-31-00-710-005-A-01 | Operational Check to Ensure Safety Valve Closes at 260 Knots |
| TASK 32-31-00-710-005-A-02 | Operational Check to Ensure Safety Valve Closes at 260 Knots |
| TASK 32-31-00-710-013-A | Operational Check of the Safety Valve that uses the APU |
| TASK 32-31-00-710-013-A-01 | Operational Check of the Safety Valve that uses the Aircraft Batteries |
| TASK 32-31-00-710-013-A-02 | Operational Check of the Safety Valve that uses the GND PWR Contactor Override Box |
| TASK 51-75-13-916-002-A | Repair to a layer of Corrosion Preventive Compound |
Subtask 32-31-17-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(2) Make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002)
(3) Make sure that the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
(4) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
(5) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
Subtask 32-31-17-865-052-A (1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(2) Make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002)
(3) Make sure that the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
(4) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
(5) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 32-31-17-860-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
C. Safety Precautions
(1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
Subtask 32-31-17-560-050-A (1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
- On panel 40VU in the cockpit
- On the ground service panel of the Green hydraulic system.
D. Preparation for Installation
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new:
4. ProcedureWARNING:
USE PROTECTIVE CLOTHING WHEN YOU USE HYDRAULIC FLUID. HYDRAULIC FLUID CAN CAUSE SKIN IRRITATION.
(1) Clean the component interfaces and the adjacent area.(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to the new:
Subtask 32-31-17-420-050-A
A. Installation of the Safety Valve
(1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Install the new back-up rings (3) and (15) and the new packings (2) and (16) on the bobbins (4) and (14).
(3) If the bobbins (4) and (14) were removed from the safety valve (7):
(5) Put the safety valve (7) in position on the manifold (1) and install the washers (9) and the bolts (10).
(6) TORQUE the bolts (10) to between 1.4 and 1.2 m.daN (123.89 and 106.19 lbf.in )
.
(7) Install the bonding strap (19) to the safety valve (7):
(9) Do a bonding check and protect the bonding strap (19) (Ref. AMM TASK 20-28-00-912-802).
(10) Remove the CAP-BLANKING from each electrical connector and receptacle.
(11) Make sure that all the electrical connections are clean and in the correct condition.
(12) Connect the electrical connector (8) to the safety valve (7).
Subtask 32-31-17-865-051-A (1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Install the new back-up rings (3) and (15) and the new packings (2) and (16) on the bobbins (4) and (14).
(3) If the bobbins (4) and (14) were removed from the safety valve (7):
- Install the new back-up rings (5) and (13) and the new square seals (6) and (12) (Ref. AMM TASK 20-23-21-911-001).
(5) Put the safety valve (7) in position on the manifold (1) and install the washers (9) and the bolts (10).
(6) TORQUE the bolts (10) to between 1.4 and 1.2 m.daN (123.89 and 106.19 lbf.in )
. (7) Install the bonding strap (19) to the safety valve (7):
- Put the bonding strap (19) in position on the bonding bracket (20) and install the washer (18), the bolt (17) and the nut (21).
(9) Do a bonding check and protect the bonding strap (19) (Ref. AMM TASK 20-28-00-912-802).
(10) Remove the CAP-BLANKING from each electrical connector and receptacle.
(11) Make sure that all the electrical connections are clean and in the correct condition.
(12) Connect the electrical connector (8) to the safety valve (7).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-31-17-860-053-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
C. Aircraft Maintenance Configuration
(1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(2) If the flight configuration precautions were obeyed, put the aircraft back to the serviceable condition (Ref. AMM TASK 32-00-00-860-002).
(3) Remove the container.
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
(6) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(7) If necessary fill the reservoir of the Green hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
Subtask 32-31-17-720-050-A (1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(2) If the flight configuration precautions were obeyed, put the aircraft back to the serviceable condition (Ref. AMM TASK 32-00-00-860-002).
(3) Remove the container.
(4) Remove the access platform(s).
(5) Remove the WARNING NOTICE(S).
(6) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(7) If necessary fill the reservoir of the Green hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
D. Operational Test
(1) Do the applicable test of the Safety Valve 49GA (7).
(a) Do the operational check of the safety valve (7) (Ref. AMM TASK 32-31-00-710-013) if:
(3) Make sure that there is no hydraulic fluid leakage from the safety-valve (7).
5. Close-up(1) Do the applicable test of the Safety Valve 49GA (7).
(a) Do the operational check of the safety valve (7) (Ref. AMM TASK 32-31-00-710-013) if:
- The cause of removal is a hydraulic leak of the safety valve (7).
- The cause of removal is not only a hydraulic leak of the safety valve (7).
(3) Make sure that there is no hydraulic fluid leakage from the safety-valve (7).
Subtask 32-31-17-410-050-A
A. Close Access
(1) Apply corrosion preventive compound to the heads of the bolts (10) and (17) and the adjacent area (Ref. AMM TASK 51-75-13-916-002).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Apply corrosion preventive compound to the heads of the bolts (10) and (17) and the adjacent area (Ref. AMM TASK 51-75-13-916-002).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Landing Gear Safety-Valve 49GA