Operational Check of Free-Fall Mechanical Control
TASK 32-33-00-710-001-A
Operational Check of Free-Fall Mechanical Control
Refer to the MPD TASK: 323300-05
OPERATIONAL CHECK OF FREE-FALL MECHANICAL CONTROL
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 32-33-00-941-058-A
Subtask 32-33-00-710-050-A ** ON A/C NOT FOR ALL
Subtask 32-33-00-710-050-B ** ON A/C NOT FOR ALL
5. Close-up
Subtask 32-33-00-410-061-A
[Rev.10 from 2021]
2026.04.01 12:31:05 UTC
Operational Check of Free-Fall Mechanical Control
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Refer to the MPD TASK: 323300-05
OPERATIONAL CHECK OF FREE-FALL MECHANICAL CONTROL
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | 1 | ROD - NON METALLIC |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | 1 | WARNING NOTICE(S) |
| 98A32301000000 | 3 | RIGGING PIN |
| 98DNSA20208040 | 1 | RIGGING PIN |
| 98DNSA20208060 | 5 | RIGGING PIN |
| 98DNSA20208150 | 6 | RIGGING PIN |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 713 | MAIN DOORS |
| 714 | MAIN DOORS |
| 734 | MAIN DOOR |
| 744 | MAIN DOOR |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 32-00-00-081-002-A | Removal of the Safety Devices from the Landing Gear Doors |
| TASK 32-00-00-481-001-A | Installation of the Safety Devices on the Landing Gears |
| TASK 32-00-00-481-002-A | Installation of the Safety Devices on the Landing Gear Doors |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
| TASK 32-22-00-410-001-A | Nose Gear Doors - Ground Doors Closing |
| TASK 32-33-00-820-002-A | Adjustment of the NLG Free-Fall Extension Mechanical System (for corrective action) |
| TASK 32-33-00-820-004-A | Adjustment of the MLG Free-Fall Extension Mechanical System (for corrective action) |
Subtask 32-33-00-941-058-A
A. Safety Precautions
(1) Put the SAFETY BARRIER(S) in position.
(2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On panel 400VU:
Subtask 32-33-00-865-064-A (1) Put the SAFETY BARRIER(S) in position.
(2) Make sure that the ground safety locks are on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On panel 400VU:
- Make sure that the landing-gear control-lever is in the DOWN position
- Put a WARNING NOTICE(S) in position to tell persons not to operate the landing gear.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 32-33-00-860-061-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R33 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R32 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R32 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R31 |
C. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On panel 402VU, make sure that the LDG GEAR down and locked indicator lights are on (green).
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
(4) On the ECAM CP, push (in) the WHEELS pushbutton switch (P/BSW).
(5) On the ECAM lower DU, make sure that:
Subtask 32-33-00-010-056-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On panel 402VU, make sure that the LDG GEAR down and locked indicator lights are on (green).
(3) Do the EIS start procedure (Upper ECAM DU and lower ECAM DU only) (Ref. AMM TASK 31-60-00-860-001).
(4) On the ECAM CP, push (in) the WHEELS pushbutton switch (P/BSW).
(5) On the ECAM lower DU, make sure that:
- The door symbols show the closed position (green in-line)
- The landing gear symbols show the down and locked position (green triangles).
D. Get Access
(1) Open the NLG doors (Ref. AMM TASK 32-22-00-010-001).
(2) Open the MLG doors (Ref. AMM TASK 32-12-00-010-001).
(3) Make sure that the safety devices are installed on the landing gear doors (Ref. AMM TASK 32-00-00-481-002).
Subtask 32-33-00-860-059-A (1) Open the NLG doors (Ref. AMM TASK 32-22-00-010-001).
(2) Open the MLG doors (Ref. AMM TASK 32-12-00-010-001).
(3) Make sure that the safety devices are installed on the landing gear doors (Ref. AMM TASK 32-00-00-481-002).
E. Aircraft Maintenance Configuration
(Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(2) Lock the MLG door ground-control-handle (31) in the CLOSE position as follows:
(c) Push and hold the pushbutton (32) and move the MLG door ground-control-handle (31) up.
(d) Release the pushbutton (32) to lock the MLG door ground-control-handle (31) in the CLOSE position.
(e) Install the safety pin (33).
(3) Lock the NLG ground door-opening-handle (36) in the CLOSE position as follows:
(c) Push the pusher (35) and move the NLG ground door-opening-handle (36) to the CLOSE position.
(d) Release the pusher (35) to lock the NLG ground door-opening-handle (36) in the CLOSE position.
(e) Install the quick release pin (34).
(4) Depressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
Subtask 32-33-00-860-058-A ** ON A/C NOT FOR ALL WARNING:
MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM. UNWANTED MOVEMENT OF HYDRAULICALLY OPERATED ITEMS CAN CAUSE SERIOUS INJURY AND/OR DAMAGE.
(1) Pressurize the Green hydraulic system(Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(2) Lock the MLG door ground-control-handle (31) in the CLOSE position as follows:
NOTE: The MLG doors will stay open during this step because the safety devices are installed on the MLG doors.
(a) When you lock the MLG door ground-control-handle (31) in the CLOSE position, make sure that:- The safety devices are installed on the MLG doors (Ref. AMM TASK 32-00-00-481-002).
- You do not close the MLG doors manually.
(c) Push and hold the pushbutton (32) and move the MLG door ground-control-handle (31) up.
(d) Release the pushbutton (32) to lock the MLG door ground-control-handle (31) in the CLOSE position.
(e) Install the safety pin (33).
(3) Lock the NLG ground door-opening-handle (36) in the CLOSE position as follows:
NOTE: The NLG doors will stay open during this step because the safety devices are installed on the NLG doors.
(a) When you lock the NLG door ground-control-handle (36) in the CLOSE position, make sure that:- The safety devices are installed on the NLG doors (Ref. AMM TASK 32-00-00-481-002).
- You do not close the NLG doors manually.
(c) Push the pusher (35) and move the NLG ground door-opening-handle (36) to the CLOSE position.
(d) Release the pusher (35) to lock the NLG ground door-opening-handle (36) in the CLOSE position.
(e) Install the quick release pin (34).
(4) Depressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-864-001) or (Ref. AMM TASK 29-23-00-864-001).
F. Preparation for Test
(5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
Subtask 32-33-00-860-058-C ** ON A/C NOT FOR ALL WARNING:
DO NOT PUT YOUR FINGERS IN THE UPLOCK MECHANISM. THIS IS DANGEROUS.
(1) Install the rigging pins in the NLG free-fall system as follow: - The 98A32301000000 RIGGING PIN at the PIN 1 position in the NLG uplock
- The 98A32301000000 RIGGING PIN at the PIN 2 position in the NLG vent valve
- The 98A32301000000 RIGGING PIN at the PIN 4 position in the NLG door uplock.
NOTE: The rigging pin is not installed at the PIN 3 position during this step.
(2) Install the rigging pins in the MLG free-fall system as follow: - The 98DNSA20208060 RIGGING PIN or the 98DNSA20208150 RIGGING PIN at the PIN 4 and PIN 8 positions in the MLG uplocks
- The 98DNSA20208060 RIGGING PIN or the 98DNSA20208150 RIGGING PIN at the PIN 5 position in the MLG cut-out valve
- The 98DNSA20208060 RIGGING PIN or the 98DNSA20208150 RIGGING PIN at the PIN 6 and PIN 9 positions in the MLG door uplocks
- The 98DNSA20208040 RIGGING PIN or the 98DNSA20208150 RIGGING PIN at the PIN 10 position in the MLG vent valve.
NOTE: The rigging pins are not installed at the PINs 1, 2, 3, 7, 11 and 12 positions during this step.
(3) If necessary, adjust the applicable free-fall system: - For the NLG system (Ref. AMM TASK 32-33-00-820-002)
- For the MLG system (Ref. AMM TASK 32-33-00-820-004).
(5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
- For the MLG, below zone 734(744)
- For the NLG, below zone 713(714).
CAUTION:
MAKE SURE THAT THE RIGGING PINS ARE REMOVED BEFORE OPERATION OF THE FREE FALL SYSTEM. DAMAGE WILL OCCUR IF THE RIGGING PINS ARE INSTALLED DURING SYSTEM OPERATION.
(6) Do this test: | ACTION | RESULT |
|---|---|
1.On the aircraft:
| In the cockpit, at the same time:
|
| | On the ECAM upper DU, the message L/G GEAR UPLOCK FAULT shows. |
| | On the ECAM lower DU:
|
| | On panel 402VU, the LDG GEAR UNLK warning lights come on (red). |
| 2.In the cockpit, push and release the MAST CAUT pushbutton switch. | The MAST CAUT indicator lights go off. |
F. Preparation for Test
MLG Free-Fall Extension - System Adjustment ** ON A/C NOT FOR ALL
MLG Free-Fall Extension - System Adjustment ** ON A/C NOT FOR ALL
(5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
4. ProcedureWARNING:
DO NOT PUT YOUR FINGERS IN THE UPLOCK MECHANISM. THIS IS DANGEROUS.
(1) Install the rigging pins in the NLG free-fall system as follow:- The 98A32301000000 RIGGING PIN at the PIN 1 position in the NLG uplock
- The 98A32301000000 RIGGING PIN at the PIN 2 position in the NLG vent valve
- The 98A32301000000 RIGGING PIN at the PIN 4 position in the NLG door uplock.
NOTE: The rigging pin is not installed at the PIN 3 position during this step.
(2) Install the rigging pins in the MLG free-fall system as follow:
MLG Free-Fall Extension - System Adjustment ** ON A/C NOT FOR ALL
MLG Free-Fall Extension - System Adjustment ** ON A/C NOT FOR ALL - The 98DNSA20208060 RIGGING PIN or the 98DNSA20208150 RIGGING PIN at the PIN 4 and PIN 8 positions in the MLG uplocks
- The 98DNSA20208060 RIGGING PIN or the 98DNSA20208150 RIGGING PIN at the PIN 5 position in the MLG cut-out valve
- The 98DNSA20208060 RIGGING PIN or the 98DNSA20208150 RIGGING PIN at the PIN 6 and PIN 9 positions in the MLG door uplocks
- The 98DNSA20208040 RIGGING PIN or the 98DNSA20208150 RIGGING PIN at the PIN 10 positions in the MLG vent valve.
NOTE: The rigging pins are not installed at the PINs 1, 2, 3, 7, 11 and 12 positions during this step.
(3) If necessary, adjust the applicable free-fall system: - For the NLG system (Ref. AMM TASK 32-33-00-820-002)
- For the MLG system (Ref. AMM TASK 32-33-00-820-004).
(5) Put the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE in position:
- For the MLG, below zone 734(744)
- For the NLG, below zone 713(714).
CAUTION:
MAKE SURE THAT THE RIGGING PINS ARE REMOVED BEFORE OPERATION OF THE FREE FALL SYSTEM. DAMAGE WILL OCCUR IF THE RIGGING PINS ARE INSTALLED DURING SYSTEM OPERATION.
(6) Do this test: | ACTION | RESULT |
|---|---|
1.On the aircraft:
| In the cockpit, at the same time:
|
| | On the ECAM upper DU, the message L/G GEAR UPLOCK FAULT shows. |
| | On the ECAM lower DU:
|
| | On panel 402VU, the LDG GEAR UNLK warning lights come on (red). |
| 2.In the cockpit, push and release the MAST CAUT pushbutton switch. | The MAST CAUT indicator lights go off. |
Subtask 32-33-00-710-050-A ** ON A/C NOT FOR ALL
CAUTION:
MAKE SURE THAT THE RIGGING PINS ARE REMOVED BEFORE OPERATION OF THE FREE FALL SYSTEM. DAMAGE WILL OCCUR IF THE RIGGING PINS ARE INSTALLED DURING SYSTEM OPERATION.
A. Operational Test of the Free-Fall Mechanical Control | ACTION | RESULT |
|---|---|
1.On panel 110VU:
| On the aircraft:
|
| | On panel 402VU:
|
| | On the ECAM lower DU:
|
| | On the ECAM upper DU, the message L/G GEAR UPLOCK FAULT goes out of view. |
2.Do a visual inspection of the uplock hooks to make sure that they are in the fully open position:
| |
3.On panel 110VU:
| On the aircraft:
|
CAUTION:
MAKE SURE THAT THE RIGGING PINS ARE REMOVED BEFORE OPERATION OF THE FREE FALL SYSTEM. DAMAGE WILL OCCUR IF THE RIGGING PINS ARE INSTALLED DURING SYSTEM OPERATION.
A. Operational Test of the Free-Fall Mechanical Control | ACTION | RESULT |
|---|---|
1.On panel 110VU:
| On the aircraft:
|
| | On panel 402VU:
|
| | On the ECAM lower DU:
|
| | On the ECAM upper DU, the message L/G GEAR UPLOCK FAULT goes out of view. |
2.Do a visual inspection of the uplock hooks to make sure that they are in the fully open position:
| |
3.On panel 110VU:
| On the aircraft:
|
Subtask 32-33-00-410-061-A
A. Close Access
(1) Put and lock the MLG door ground-control handle (31) in the OPEN position as follows:
(a) Remove the safety pin (33).
(b) Push and hold the pushbutton (32) and move the MLG door ground-control-handle (31) down.
(c) Release the pushbutton (32) to lock the MLG door ground-control-handle (31) in the OPEN position.
(d) Install the safety pin (33).
(2) Put and lock the NLG ground door-opening-handle (36) in the OPEN position as follows:
(a) Remove the quick release pin (34).
(b) Push the pusher (35) and move the NLG ground door-opening-handle (36) to the OPEN position.
(c) Release the pusher (35) to lock the NLG ground door-opening-handle (36) in the OPEN position.
(d) Install the quick release pin (34).
(3) Remove the safety devices from the landing gear doors (Ref. AMM TASK 32-00-00-081-002).
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
(6) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
(7) On the ECAM lower DU, make sure that the L/G door symbols change to the closed and locked position (green in-line).
(8) On panel 402VU, make sure that the LDG GEAR down and locked indicator lights are ON (green triangles).
Subtask 32-33-00-860-062-A (1) Put and lock the MLG door ground-control handle (31) in the OPEN position as follows:
(a) Remove the safety pin (33).
(b) Push and hold the pushbutton (32) and move the MLG door ground-control-handle (31) down.
(c) Release the pushbutton (32) to lock the MLG door ground-control-handle (31) in the OPEN position.
(d) Install the safety pin (33).
(2) Put and lock the NLG ground door-opening-handle (36) in the OPEN position as follows:
(a) Remove the quick release pin (34).
(b) Push the pusher (35) and move the NLG ground door-opening-handle (36) to the OPEN position.
(c) Release the pusher (35) to lock the NLG ground door-opening-handle (36) in the OPEN position.
(d) Install the quick release pin (34).
(3) Remove the safety devices from the landing gear doors (Ref. AMM TASK 32-00-00-081-002).
(4) Make sure that the work area is clean and clear of tools and other items.
(5) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
(6) Close the MLG doors (Ref. AMM TASK 32-12-00-410-001).
(7) On the ECAM lower DU, make sure that the L/G door symbols change to the closed and locked position (green in-line).
(8) On panel 402VU, make sure that the LDG GEAR down and locked indicator lights are ON (green triangles).
B. Aircraft Maintenance Configuration
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
Subtask 32-33-00-942-060-A (1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
C. Removal of Equipment
(1) Remove the SAFETY BARRIER(S).
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the SAFETY BARRIER(S).
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.