Installation of the Mechanical Support Assy of the NLG Door Uplock
TASK 32-31-18-400-801-A
Installation of the Mechanical Support Assy of the NLG Door Uplock
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 32-31-18-860-051-A
Subtask 32-31-18-420-055-A Subtask 32-31-18-420-051-A
Subtask 32-31-18-410-050-A
[Rev.10 from 2021]
2026.04.01 00:44:39 UTC
Installation of the Mechanical Support Assy of the NLG Door Uplock
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
WARNING:
MAKE SURE THAT THE SAFETY DEVICES AND THE WARNING NOTICES ARE IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | CONTAINER 5 L (1.32 USGAL) |
| No specific | AR | PLUG - BLANKING |
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| No specific | Torque wrench: range to between 1.43 and 1.17 m.daN (126.55 and 103.54 lbf.in ) ![]() | |
| No specific | Torque wrench: range to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft ) ![]() | |
| No specific | Torque wrench: range to between 3 and 2.5 m.daN (22.12 and 18.44 lbf.ft ) ![]() | |
| 98D32303000000 | 1 | ADAPTER-WRENCH KIT |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.03GBB1) | Synthetic Oil base Grease-General Purpose Clay Thickened - |
| (Material No.03GBC1) | Synthetic Oil base Grease-General Purpose Lithium Thickened Low Temp. - |
| (Material No.06ABB1) | Polysulfide Sealant-Fuel Tank Fillet - |
| (Material No.06LCG9) | Non Hardening Jointing Putty-Medium Temp. Area - - |
| (Material No.08BBB1) | Non Aqueous Cleaner-- Petroleum Based - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 123 | NOSE GEAR WELL |
| 124 | NOSE GEAR WELL |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 22 | LOCKWASHER | AIPC 32-31-01-03-070 |
| 5 | COTTER PINS | AIPC 32-31-01-12-010 |
| 32 | COTTER PIN | AIPC 32-31-01-13-040 |
| 22 | LOCKWASHER | AIPC 32-31-81-03-070 |
| 5 | COTTER PINS | AIPC 32-31-81-12-010 |
| 32 | COTTER PIN | AIPC 32-31-81-13-010 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-22-32-640-002-A | Lubrication of Nose Landing Gear and Doors |
| TASK 29-00-00-864-001-A | Put the Related Hydraulic System in the Depressurized Configuration before Maintenance Action |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-14-00-614-002-A | Pressurization of the Hydraulic Reservoirs through the Ground Connector |
| TASK 29-14-00-614-002-A-01 | Pressurization of the Hydraulic Reservoirs with the Auxiliary Power Unit (APU) |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
| TASK 32-22-00-410-001-A | Nose Gear Doors - Ground Doors Closing |
| TASK 32-31-00-710-002-A | Operational Test of the Landing Gear Doors (With False Targets) |
| TASK 32-31-00-710-002-A-01 | Operational Test of the Landing Gear Doors (Without False Targets) |
| TASK 32-31-14-400-001-A | Installation of the NLG Door Uplock Assy |
| TASK 32-31-41-400-001-A | Installation of the NLG Main-Door Control-Rod |
| TASK 32-31-73-200-002-A | Inspection of the NLG Proximity Sensor and Target Clearances |
Subtask 32-31-18-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration (Ref. AMM TASK 29-00-00-864-001).
(2) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(3) In the cockpit, on the right center instrument panel 400VU, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to operate the landing-gear control lever.
(4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
(6) Make sure that the CONTAINER 5 L (1.32 USGAL) is in position below the NLG door uplock-assy (2534GM).
(7) Make sure that the doors of the NLG are open (Ref. AMM TASK 32-22-00-010-001).
(8) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below zone 123(124).
(9) Make sure that you obeyed the flight configuration precautions (Ref. AMM TASK 32-00-00-860-001).
Subtask 32-31-18-865-051-A (1) Make sure that the Green hydraulic system is depressurized and put it in the maintenance configuration (Ref. AMM TASK 29-00-00-864-001).
(2) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
(3) In the cockpit, on the right center instrument panel 400VU, make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to operate the landing-gear control lever.
(4) Make sure that the WARNING NOTICE(S) is (are) in position to tell persons not to pressurize the Green hydraulic system:
- In the cockpit, on the hydraulic panel 40VU
- On the ground service panel of the Green hydraulic system, on access door 197CB.
(6) Make sure that the CONTAINER 5 L (1.32 USGAL) is in position below the NLG door uplock-assy (2534GM).
(7) Make sure that the doors of the NLG are open (Ref. AMM TASK 32-22-00-010-001).
(8) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position below zone 123(124).
(9) Make sure that you obeyed the flight configuration precautions (Ref. AMM TASK 32-00-00-860-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
Subtask 32-31-18-420-055-A Subtask 32-31-18-420-051-A
B. Installation of the Mechanical Support Assy of the NLG Door Uplock
(1) Put the mechanical support assy with the NLG door uplock in position on the support fitting (12).
(2) Install the bolts (13) and nuts (20) and tighten them.
(3) Install the clamps of the electrical cables.
(a) Install the washers (15), clamps (16) and spacer (17) on the bolts (14).
(b) Install the bolts (14) and nuts (18) and tighten them.
Subtask 32-31-18-420-052-A (1) Put the mechanical support assy with the NLG door uplock in position on the support fitting (12).
(2) Install the bolts (13) and nuts (20) and tighten them.
(3) Install the clamps of the electrical cables.
(a) Install the washers (15), clamps (16) and spacer (17) on the bolts (14).
(b) Install the bolts (14) and nuts (18) and tighten them.
C. Installation of the Latch Support Fitting
(1) Apply a thin layer of Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the bolt (29).
(2) Put the latch fitting support (30) in position on the clevis (28).
(3) Install the bolt (29), washer (31) and nut (33).
(4) TORQUE the bolt (29) to between 3 and 2.5 m.daN (22.12 and 18.44 lbf.ft )
.
(5) Safety the nut (33) with the new AIPC 32-31-01-13-040 COTTER PIN (32) or AIPC 32-31-81-13-010 COTTER PIN (32).
(6) Apply a layer of Polysulfide Sealant-Fuel Tank Fillet - (Material No.06ABB1) to the head of the bolt (29) and on the nut (33).
Subtask 32-31-18-420-053-A (1) Apply a thin layer of Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) to the threads of the bolt (29).
(2) Put the latch fitting support (30) in position on the clevis (28).
(3) Install the bolt (29), washer (31) and nut (33).
(4) TORQUE the bolt (29) to between 3 and 2.5 m.daN (22.12 and 18.44 lbf.ft )
. (5) Safety the nut (33) with the new AIPC 32-31-01-13-040 COTTER PIN (32) or AIPC 32-31-81-13-010 COTTER PIN (32).
(6) Apply a layer of Polysulfide Sealant-Fuel Tank Fillet - (Material No.06ABB1) to the head of the bolt (29) and on the nut (33).
D. Installation of the NLG Door Actuating-Cylinder
(1) Prepare for installation
(a) Clean the mating surfaces with Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(b) Apply a thin layer of Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) or Synthetic Oil base Grease-General Purpose Lithium Thickened Low Temp. - (Material No.03GBC1) on the threads of the slotted nut (21) and bolt (25).
(a) Put the end of the actuating cylinder rod (27) in position on the bellcrank (19).
(b) Install the bolt (25), washer (26), bush (24) and washer (23).
(c) Install the new lockwasher (22) and slotted nut (21).
(d) TORQUE the slotted nut (21) to between 1.43 and 1.17 m.daN (126.55 and 103.54 lbf.in )
with the 98D32303000000 ADAPTER-WRENCH KIT (98D32303000201).
(e) Safety the slotted nut (21) with the new AIPC 32-31-01-03-070 LOCKWASHER (22) or AIPC 32-31-81-03-070 LOCKWASHER (22).
(f) Lubricate the attaching points of the actuating cylinder (Ref. AMM TASK 12-22-32-640-002).
Subtask 32-31-18-420-054-A (1) Prepare for installation
(a) Clean the mating surfaces with Non Aqueous Cleaner-- Petroleum Based - (Material No.08BBB1) and the Textile-Lint free Cotton - (Material No.14SBA1) .
(b) Apply a thin layer of Synthetic Oil base Grease-General Purpose Clay Thickened - (Material No.03GBB1) or Synthetic Oil base Grease-General Purpose Lithium Thickened Low Temp. - (Material No.03GBC1) on the threads of the slotted nut (21) and bolt (25).
NOTE: You must not mix Material No. 04-004 with Material No. 04-022. You can use Material No. 04-022 as an alternative to Material No. 04-004. You must clean and degrease the parts before you use Material No. 04-022.
(2) Connection of the NLG door actuating-cylinder (a) Put the end of the actuating cylinder rod (27) in position on the bellcrank (19).
(b) Install the bolt (25), washer (26), bush (24) and washer (23).
(c) Install the new lockwasher (22) and slotted nut (21).
(d) TORQUE the slotted nut (21) to between 1.43 and 1.17 m.daN (126.55 and 103.54 lbf.in )
with the 98D32303000000 ADAPTER-WRENCH KIT (98D32303000201). (e) Safety the slotted nut (21) with the new AIPC 32-31-01-03-070 LOCKWASHER (22) or AIPC 32-31-81-03-070 LOCKWASHER (22).
(f) Lubricate the attaching points of the actuating cylinder (Ref. AMM TASK 12-22-32-640-002).
E. Connection of the Control Rods
(2) Do the installation and rigging of the upper rod ends of the control rods (8) with washers (7), nuts (6), new AIPC 32-31-01-12-010 COTTER PINS (5) or AIPC 32-31-81-12-010 COTTER PINS (5) and bolts (11) (Ref. AMM TASK 32-31-41-400-001).
Subtask 32-31-18-420-056-A WARNING:
MAKE SURE THAT THE NLG DOWNLOCK SAFETY PIN AND THE TWO DOOR SAFETY PINS ARE INSTALLED.
CAUTION:
CONNECT THE ROD FROM THE LEFT DOOR TO THE REAR BELLCRANK (LEFT SIDE) AND THE ROD FROM THE RIGHT DOOR TO THE FRONT BELLCRANK (RIGHT SIDE).
IF YOU CONNECT THE RODS TO THE WRONG BELLCRANKS, THE RODS WILL BECOME DAMAGED DURING OPERATION OF THE DOORS.
CAUTION:
INSTALL THE BOLTS AT THE TOP OF THE CONTROL RODS WITH THE HEADS ON THE INNER SIDE OF THE MECHANISM.
(1) Remove the tie wrap from the control rods (8). - IF NOT, THE NUTS CAN TOUCH THE CRANK LEVERS AND CAUSE DAMAGE WHEN THE MECHANISM OPERATES.
(2) Do the installation and rigging of the upper rod ends of the control rods (8) with washers (7), nuts (6), new AIPC 32-31-01-12-010 COTTER PINS (5) or AIPC 32-31-81-12-010 COTTER PINS (5) and bolts (11) (Ref. AMM TASK 32-31-41-400-001).
F. Connection of the Hydraulic and Electrical lines
(1) Remove the PLUG - BLANKING. Connect the hydraulic lines (3) and (4).
(2) TORQUE the hydraulic lines (3) and (4) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
.
(3) Remove the CAP - BLANKING. Connect the electrical lines (1) and (2).
Subtask 32-31-18-865-052-A (1) Remove the PLUG - BLANKING. Connect the hydraulic lines (3) and (4).
(2) TORQUE the hydraulic lines (3) and (4) to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. (3) Remove the CAP - BLANKING. Connect the electrical lines (1) and (2).
G. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-31-18-941-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
H. Preparation for the Test
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Make sure that the NLG door uplock-assy (2534GM) is in the open configuration.
(3) Remove the container below the NLG door uplock-assy (2534GM).
(4) Make sure that the travel range of the NLG doors is clean and clear of tools and other items.
(5) Remove the access platform(s).
(6) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(7) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(8) Put the aircraft in the ground configuration (Ref. AMM TASK 32-00-00-860-002).
Subtask 32-31-18-720-050-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Make sure that the NLG door uplock-assy (2534GM) is in the open configuration.
(3) Remove the container below the NLG door uplock-assy (2534GM).
(4) Make sure that the travel range of the NLG doors is clean and clear of tools and other items.
(5) Remove the access platform(s).
(6) Pressurize the Green hydraulic system (Ref. AMM TASK 29-10-00-863-001) or (Ref. AMM TASK 29-23-00-863-001).
(7) Pressurize the reservoir of the Green hydraulic system (Ref. AMM TASK 29-14-00-614-002).
(8) Put the aircraft in the ground configuration (Ref. AMM TASK 32-00-00-860-002).
I. Test
(1) Adjust the hydraulic power unit for minimum pressure and flow rate.
(2) Do 5 full DOOR CLOSE/DOOR OPEN cycles (Ref. AMM TASK 32-22-00-010-001) (Ref. AMM TASK 32-22-00-410-001) to bleed the hydraulic system.
(3) Do an operational test of the landing gear doors (Ref. AMM TASK 32-31-00-710-002).
Subtask 32-31-18-720-050-B ** ON A/C NOT FOR ALL (1) Adjust the hydraulic power unit for minimum pressure and flow rate.
(2) Do 5 full DOOR CLOSE/DOOR OPEN cycles (Ref. AMM TASK 32-22-00-010-001) (Ref. AMM TASK 32-22-00-410-001) to bleed the hydraulic system.
(3) Do an operational test of the landing gear doors (Ref. AMM TASK 32-31-00-710-002).
I. Test
(1) Adjust the hydraulic power unit for minimum pressure and flow rate.
(2) Do an inspection of the NLG proximity sensor and target clearance (Ref. AMM TASK 32-31-73-200-002).
(3) Do 5 full DOOR CLOSE/DOOR OPEN cycles (Ref. AMM TASK 32-22-00-010-001) (Ref. AMM TASK 32-22-00-410-001) to bleed the hydraulic system.
(4) Do an operational test of the landing gear doors (Ref. AMM TASK 32-31-00-710-002).
5. Close-up(1) Adjust the hydraulic power unit for minimum pressure and flow rate.
(2) Do an inspection of the NLG proximity sensor and target clearance (Ref. AMM TASK 32-31-73-200-002).
(3) Do 5 full DOOR CLOSE/DOOR OPEN cycles (Ref. AMM TASK 32-22-00-010-001) (Ref. AMM TASK 32-22-00-410-001) to bleed the hydraulic system.
(4) Do an operational test of the landing gear doors (Ref. AMM TASK 32-31-00-710-002).
Subtask 32-31-18-410-050-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Remove the safety barrier(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(5) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Remove the safety barrier(s).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(5) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
Mechanical Support Assy of the NLG Door Uplock