Installation of the Decoder/Encoder Unit B
TASK 23-73-47-400-001-A
Installation of the Decoder/Encoder Unit B
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 23-73-47-860-050-A ** ON A/C NOT FOR ALL
Subtask 23-73-47-410-052-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.03.31 23:18:52 UTC
Installation of the Decoder/Encoder Unit B
ZONE: 200
FIN: 300RH1
FIN: 300RH3 ** ON A/C NOT FOR ALL
FIN: 300RH4 ** ON A/C NOT FOR ALL
FIN: 300RH5 ** ON A/C NOT FOR ALL
FIN: 300RH6
FIN: 300RH7 ** ON A/C NOT FOR ALL
FIN: 300RH8 ** ON A/C NOT FOR ALL
1. Reason for the JobFIN: 300RH1
FIN: 300RH3 ** ON A/C NOT FOR ALL
FIN: 300RH4 ** ON A/C NOT FOR ALL
FIN: 300RH5 ** ON A/C NOT FOR ALL
FIN: 300RH6
FIN: 300RH7 ** ON A/C NOT FOR ALL
FIN: 300RH8 ** ON A/C NOT FOR ALL
Self Explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | STEPLADDER 0.5 M (1.6 FT) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 200 | UPPER HALF FUSELAGE |
| FOR [300RH1] (DEU-B) | |
| 221BC | |
| FOR [300RH4] (DEU-B) | |
| 251KC | |
| 242QW | |
| 231JC | |
| FOR [300RH5] (DEU-B) | |
| FOR [300RH6] (DEU-B) | |
| 251KC | |
| 261CC | |
| FOR [300RH6] (DEU-B) | |
| 251KC | |
| 242WW | |
| FOR [300RH7] (DECODER/ENCODER UNIT B) | |
| 231JC | |
| FOR [300RH7] (DECODER/ENCODER UNIT B) | |
| FOR [300RH8] (DEU-B) | |
| 261DF | |
| 261CC | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 23-73-00-740-005-A | BITE-Test of the Cabin Intercommunication Data System (CIDS) through the CFDS |
| TASK 23-73-00-740-005-B | Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) through the CFDS |
| TASK 23-73-00-861-001-A | Energize the Cabin Intercommunication Data System (CIDS) |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 26-10-00-740-801-A | BITE Test of the Smoke Detection Function - System Test |
| FOR [300RH1] (DEU-B) | |
| TASK 25-23-42-000-001-A | Removal of the Ceiling Panels - Forward Utility Area |
| TASK 25-23-42-400-001-A | Installation of the Ceiling Panels - Forward Utility Area |
| FOR [300RH4] (DEU-B) | |
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-43-000-001-A | Removal of the Upper Sidewall Panel |
| TASK 25-23-43-400-001-A | Installation of the Upper Sidewall Panel |
| FOR [300RH5] (DEU-B) | |
| FOR [300RH6] (DEU-B) | |
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-42-000-002-A | Removal of the Ceiling Panels - Aft Utility Area |
| TASK 25-23-42-400-002-A | Installation of the Ceiling Panels - Aft Utility Area |
| FOR [300RH6] (DEU-B) | |
| TASK 25-23-41-000-001-A | Removal of the Ceiling Panels |
| TASK 25-23-41-400-001-A | Installation of the Ceiling Panels |
| TASK 25-23-48-000-001-A | Removal of the Cove Light Panel |
| TASK 25-23-48-400-001-A | Installation of the Cove Light Panel |
| FOR [300RH7] (DECODER/ENCODER UNIT B) | |
| TASK 25-23-42-000-001-A | Removal of the Ceiling Panels - Forward Utility Area |
| TASK 25-23-42-400-001-A | Installation of the Ceiling Panels - Forward Utility Area |
| FOR [300RH7] (DECODER/ENCODER UNIT B) | |
| FOR [300RH8] (DEU-B) | |
| TASK 25-23-42-000-002-A | Removal of the Ceiling Panels - Aft Utility Area |
| TASK 25-23-42-400-002-A | Installation of the Ceiling Panels - Aft Utility Area |
Subtask 23-73-47-860-050-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility-area ceiling panel is removed.
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001)
(4) Make sure that the upper sidewall panel is removed.
(a) FOR [300RH4] (DEU-B)
242QW (Ref. AMM TASK 25-23-43-000-001)
(5) Make sure that the aft utility-area ceiling panel is removed.
(a) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002)
Subtask 23-73-47-860-050-B ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility-area ceiling panel is removed.
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001)
(4) Make sure that the upper sidewall panel is removed.
(a) FOR [300RH4] (DEU-B)
242QW (Ref. AMM TASK 25-23-43-000-001)
(5) Make sure that the aft utility-area ceiling panel is removed.
(a) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002)
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility-area ceiling panel is removed.
(a) FOR [300RH1] (DEU-B)
221BC
(b) FOR [300RH7] (DECODER/ENCODER UNIT B)
231JC (Ref. AMM TASK 25-23-42-000-001)
(4) Make sure that the aft utility-area ceiling panel is removed.
(a) FOR [300RH4] (DEU-B)
251KC
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002)
Subtask 23-73-47-860-050-J ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility-area ceiling panel is removed.
(a) FOR [300RH1] (DEU-B)
221BC
(b) FOR [300RH7] (DECODER/ENCODER UNIT B)
231JC (Ref. AMM TASK 25-23-42-000-001)
(4) Make sure that the aft utility-area ceiling panel is removed.
(a) FOR [300RH4] (DEU-B)
251KC
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002)
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility area - ceiling panel is removed:
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001).
(4) Make sure that the ceiling panel is removed:
(a) FOR [300RH4] (DEU-B)
231JC (Ref. AMM TASK 25-23-41-000-001).
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
251KC (Ref. AMM TASK 25-23-41-000-001).
(5) Make sure that the aft utility area - ceiling panel is removed.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
261DF (Ref. AMM TASK 25-23-42-000-002).
Subtask 23-73-47-860-050-M ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility area - ceiling panel is removed:
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001).
(4) Make sure that the ceiling panel is removed:
(a) FOR [300RH4] (DEU-B)
231JC (Ref. AMM TASK 25-23-41-000-001).
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
251KC (Ref. AMM TASK 25-23-41-000-001).
(5) Make sure that the aft utility area - ceiling panel is removed.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
261DF (Ref. AMM TASK 25-23-42-000-002).
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility area - ceiling panel is removed:
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001).
(4) Make sure that the ceiling panel is removed:
(a) FOR [300RH4] (DEU-B)
231JC (Ref. AMM TASK 25-23-41-000-001).
(b) FOR [300RH6] (DEU-B)
251KC (Ref. AMM TASK 25-23-41-000-001).
(5) Make sure that the aft utility area - ceiling panel is removed.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002).
Subtask 23-73-47-860-050-N ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility area - ceiling panel is removed:
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001).
(4) Make sure that the ceiling panel is removed:
(a) FOR [300RH4] (DEU-B)
231JC (Ref. AMM TASK 25-23-41-000-001).
(b) FOR [300RH6] (DEU-B)
251KC (Ref. AMM TASK 25-23-41-000-001).
(5) Make sure that the aft utility area - ceiling panel is removed.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002).
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility area - ceiling panel is removed:
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001).
(4) Make sure that the cove light panel is removed:
(a) FOR [300RH6] (DEU-B)
242WW (Ref. AMM TASK 25-23-48-000-001).
(5) Make sure that the aft utility area - ceiling panel is removed.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002).
Subtask 23-73-47-860-050-Q ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility area - ceiling panel is removed:
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001).
(4) Make sure that the cove light panel is removed:
(a) FOR [300RH6] (DEU-B)
242WW (Ref. AMM TASK 25-23-48-000-001).
(5) Make sure that the aft utility area - ceiling panel is removed.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002).
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility area - ceiling panel is removed:
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001).
(4) Make sure that the ceiling panel is removed:
(a) FOR [300RH4] (DEU-B)
231JC (Ref. AMM TASK 25-23-41-000-001).
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
251KC (Ref. AMM TASK 25-23-41-000-001).
(5) Make sure that the aft utility area - ceiling panel is removed:
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002).
Subtask 23-73-47-865-051-A (1) Make sure that the aircraft electrical circuits are energized
(Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that the STEPLADDER 0.5 M (1.6 FT) is below the related access panel.
(3) Make sure that the forward utility area - ceiling panel is removed:
(a) FOR [300RH1] (DEU-B)
221BC (Ref. AMM TASK 25-23-42-000-001).
(4) Make sure that the ceiling panel is removed:
(a) FOR [300RH4] (DEU-B)
231JC (Ref. AMM TASK 25-23-41-000-001).
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
251KC (Ref. AMM TASK 25-23-41-000-001).
(5) Make sure that the aft utility area - ceiling panel is removed:
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
261CC (Ref. AMM TASK 25-23-42-000-002).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B/ESS | 153RH | G03 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B ESS/R | 420RH | G05 |
| 49VU | COM/CIDS/DEU B ESS/L | 419RH | G04 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M08 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM / CIDS / DEU B / NORM FWD | 193RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B NORM/R | 620RH | M08 |
| 121VU | COM NAV/CIDS/DEU B NORM/L | 619RH | M07 |
| 121VU | COM/CIDS/DEU B BAT/R | 720RH | Q11 |
| 121VU | COM/CIDS/DEU B BAT/L | 719RH | Q10 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM/CIDS/DEU B/BAT | 143RH | N12 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WATER SYSTEM-QANT-IND | 1MA | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-QUANT-IND | 1MA | B06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-DRAIN | 1MP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYS-DRAIN | 1MP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | CIDS-DEU B-NORM-AFT | 194RH | C08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
CAUTION:
REFER TO THE MATCH MARKS MADE DURING THE REMOVAL WHEN YOU CONNECT THE ELECTRICAL WIRES.
IF YOU MAKE AN ERROR WHEN YOU CONNECT THE WIRES YOU WILL CAUSE DAMAGE TO EQUIPMENT.
Subtask 23-73-47-420-050-A ** ON A/C NOT FOR ALL A. Installation of the Decoder/Encoder Unit (DEU) B
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (2), (3) and (4).
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Carefully install the DEU B (1) into the mounting tray (6). Make sure that the DEU B (1) is correctly aligned to prevent damage to the electrical connector (4).
(6) Connect the electrical connectors (2) and (3) to the DEU B (1) and safety with the locking springs (7).
Subtask 23-73-47-420-050-B ** ON A/C NOT FOR ALL (1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Remove the blanking caps from the electrical connectors (2), (3) and (4).
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Carefully install the DEU B (1) into the mounting tray (6). Make sure that the DEU B (1) is correctly aligned to prevent damage to the electrical connector (4).
(6) Connect the electrical connectors (2) and (3) to the DEU B (1) and safety with the locking springs (7).
A. Installation of the Decoder/Encoder Unit (DEU) B
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the DEU B (6) in the correct position.
(4) Tighten the nylatches (5).
(5) Remove the CAP-BLANKING from each electrical connector and receptacle.
(6) Make sure that all the electrical connections are clean and in the correct condition.
(7) Connect the electrical connectors (2) to the DEU B (6).
(8) Safety the electrical connectors (2).
(9) Make sure that the coding switches are in the positions recorded during the removal procedure.
(10) Install the connection/termination box (4) and tighten the nylatches (3).
Subtask 23-73-47-865-052-A
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL
Decoder/Encoder Unit B ** ON A/C NOT FOR ALL (2) Do an inspection of the component interfaces and the adjacent area.
(3) Put the DEU B (6) in the correct position.
(4) Tighten the nylatches (5).
(5) Remove the CAP-BLANKING from each electrical connector and receptacle.
(6) Make sure that all the electrical connections are clean and in the correct condition.
(7) Connect the electrical connectors (2) to the DEU B (6).
(8) Safety the electrical connectors (2).
CAUTION:
MAKE SURE THAT THE SPRING LATCHES CORRECTLY HOLD THE CONNECTOR IN THE FULLY ENGAGED POSITION. THE SPRING LATCHES PREVENT UNWANTED MOVEMENT OF THE CONNECTOR, AND THUS THE RISK OF ARCING, WHICH CAN CAUSE DAMAGE TO THE UNIT.
(a) Safety the electrical connectors (2) with the spring latches (1). (9) Make sure that the coding switches are in the positions recorded during the removal procedure.
(10) Install the connection/termination box (4) and tighten the nylatches (3).
B. Remove the safety clips and tags and close these circuit breakers in this sequence:
Subtask 23-73-47-869-050-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-DRAIN | 1MP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER-SYS-DRAIN | 1MP | B05 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 45MG | A02 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 45MG | A02 |
| 2001VU | VACU TOIL SYS-LAV PWR-F | 39MG | A03 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-D | 39MG | A03 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-SYS | 35MG | A06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-M | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-G | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-E | 34MG | A04 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACU-GEN | 33MG | A08 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-VACUUM-GEN | 33MG | A08 |
| ** ON A/C ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-A | 32MG | A01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | VACU TOIL SYS-LAV PWR-L | 23MG | A05 |
| ** ON A/C NOT FOR ALL | |||
| 2000VU | WATER SYSTEM-QANT-IND | 1MA | B01 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | WATER SYS-QUANT-IND | 1MA | B06 |
| ** ON A/C NOT FOR ALL | |||
| 2001VU | CIDS-DEU B-NORM-AFT | 194RH | C08 |
| 121VU | COM / CIDS / DEU B / NORM FWD | 193RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B/NORM | 162RH | M08 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | COM/CIDS/DEU B/ESS | 153RH | G03 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM/CIDS/DEU B/BAT | 143RH | N12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | COM NAV/CIDS/DEU B NORM/L | 619RH | M07 |
| 121VU | COM NAV/CIDS/DEU B NORM/R | 620RH | M08 |
| 49VU | COM/CIDS/DEU B ESS/L | 419RH | G04 |
| 49VU | COM/CIDS/DEU B ESS/R | 420RH | G05 |
| 121VU | COM/CIDS/DEU B BAT/L | 719RH | Q10 |
| 121VU | COM/CIDS/DEU B BAT/R | 720RH | Q11 |
C. Aircraft Maintenance Configuration
(1) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
(2) Do the BITE test of the CIDS through the CFDS (Ref. AMM TASK 23-73-00-740-005).
Subtask 23-73-47-869-050-B ** ON A/C NOT FOR ALL (1) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
(2) Do the BITE test of the CIDS through the CFDS (Ref. AMM TASK 23-73-00-740-005).
C. Aircraft Maintenance Configuration
(1) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
(2) Do the Interface and Power-up test of the CIDS (Ref. AMM TASK 23-73-00-740-005).
Subtask 23-73-47-740-050-A ** ON A/C NOT FOR ALL Subtask 23-73-47-869-051-A ** ON A/C NOT FOR ALL (1) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
(2) Do the Interface and Power-up test of the CIDS (Ref. AMM TASK 23-73-00-740-005).
E. Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU is in the OFF position.
Subtask 23-73-47-710-050-B ** ON A/C NOT FOR ALL F. Do this test
Subtask 23-73-47-710-050-C ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.In the cockpit, on the circuit breaker panel 121VU: | |
| |
| 2.In the cockpit, on the circuit breaker panel 49VU: | In the cockpit, on the ECAM upper display unit: |
|
|
| |
| 3.In the cockpit, on the circuit breaker panel 121VU: | |
|
NOTE: Wait 5 minutes before you start the next test step. |
| |
|
| 4.On the CFDS MCDU: | On the CFDS MCDU: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
F. Do this test
5. Close-up| ACTION | RESULT |
|---|---|
| 1.In the cockpit, on the circuit breaker panel 121VU: | |
| |
| 2.In the cockpit, on the circuit breaker panel 49VU: | In the cockpit, on the ECAM upper display unit: |
|
|
| |
| 3.In the cockpit, on the circuit breaker panel 121VU: | |
|
NOTE: Wait 5 minutes before you start the next test step. |
| |
|
| 4.On the CFDS MCDU: | On the CFDS MCDU: |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
Subtask 23-73-47-410-052-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility-area ceiling panel.
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001)
(3) Install the upper sidewall panel.
(a) FOR [300RH4] (DEU-B)
install 242QW (Ref. AMM TASK 25-23-43-400-001)
(4) Install the aft utility-area ceiling panel.
(a) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002)
Subtask 23-73-47-410-052-B ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility-area ceiling panel.
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001)
(3) Install the upper sidewall panel.
(a) FOR [300RH4] (DEU-B)
install 242QW (Ref. AMM TASK 25-23-43-400-001)
(4) Install the aft utility-area ceiling panel.
(a) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002)
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility-area ceiling panel.
(a) FOR [300RH1] (DEU-B)
install 221BC
(b) FOR [300RH7] (DECODER/ENCODER UNIT B)
install 231JC (Ref. AMM TASK 25-23-42-400-001)
(3) Install the aft utility-area ceiling panel.
(a) FOR [300RH4] (DEU-B)
install 251KC
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002)
Subtask 23-73-47-410-052-J ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility-area ceiling panel.
(a) FOR [300RH1] (DEU-B)
install 221BC
(b) FOR [300RH7] (DECODER/ENCODER UNIT B)
install 231JC (Ref. AMM TASK 25-23-42-400-001)
(3) Install the aft utility-area ceiling panel.
(a) FOR [300RH4] (DEU-B)
install 251KC
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002)
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility area - ceiling panel:
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001).
(3) Install the ceiling panel :
(a) FOR [300RH4] (DEU-B)
install 231JC (Ref. AMM TASK 25-23-41-400-001).
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
install 251KC (Ref. AMM TASK 25-23-41-400-001).
(4) Install the aft utility area - ceiling panel.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).
Subtask 23-73-47-410-052-M ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility area - ceiling panel:
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001).
(3) Install the ceiling panel :
(a) FOR [300RH4] (DEU-B)
install 231JC (Ref. AMM TASK 25-23-41-400-001).
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
install 251KC (Ref. AMM TASK 25-23-41-400-001).
(4) Install the aft utility area - ceiling panel.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility area - ceiling panel:
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001).
(3) Install the ceiling panel :
(a) FOR [300RH4] (DEU-B)
install 231JC (Ref. AMM TASK 25-23-41-400-001).
(b) FOR [300RH6] (DEU-B)
install 251KC (Ref. AMM TASK 25-23-41-400-001).
(4) Install the aft utility area - ceiling panel.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).
Subtask 23-73-47-410-052-N ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility area - ceiling panel:
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001).
(3) Install the ceiling panel :
(a) FOR [300RH4] (DEU-B)
install 231JC (Ref. AMM TASK 25-23-41-400-001).
(b) FOR [300RH6] (DEU-B)
install 251KC (Ref. AMM TASK 25-23-41-400-001).
(4) Install the aft utility area - ceiling panel.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility area - ceiling panel:
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001).
(3) Install the cove light panel :
(a) FOR [300RH6] (DEU-B)
install 242WW (Ref. AMM TASK 25-23-48-400-001).
(4) Install the aft utility area - ceiling panel.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).
Subtask 23-73-47-410-052-Q ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility area - ceiling panel:
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001).
(3) Install the cove light panel :
(a) FOR [300RH6] (DEU-B)
install 242WW (Ref. AMM TASK 25-23-48-400-001).
(4) Install the aft utility area - ceiling panel.
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility area - ceiling panel:
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001).
(3) Install the ceiling panel :
(a) FOR [300RH4] (DEU-B)
install 231JC (Ref. AMM TASK 25-23-41-400-001).
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
install 251KC (Ref. AMM TASK 25-23-41-400-001).
(4) Install the aft utility area - ceiling panel:
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).
Subtask 23-73-47-862-050-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Install the forward utility area - ceiling panel:
(a) FOR [300RH1] (DEU-B)
install 221BC (Ref. AMM TASK 25-23-42-400-001).
(3) Install the ceiling panel :
(a) FOR [300RH4] (DEU-B)
install 231JC (Ref. AMM TASK 25-23-41-400-001).
(b) FOR [300RH5] (DEU-B), [300RH6] (DEU-B)
install 251KC (Ref. AMM TASK 25-23-41-400-001).
(4) Install the aft utility area - ceiling panel:
(a) FOR [300RH7] (DECODER/ENCODER UNIT B), [300RH8] (DEU-B)
install 261CC (Ref. AMM TASK 25-23-42-400-002).
(5) Remove the STEPLADDER 0.5 M (1.6 FT).