Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) through the CFDS


TASK 23-73-00-740-005-B
Interface and Power-Up Test of the Cabin Intercommunication Data System (CIDS) through the CFDS


ZONE: 200
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
200
UPPER HALF FUSELAGE
 B. Referenced Information
REFERENCE
DESIGNATION
TASK 23-33-00-710-008-A
Procedure to Prepare the In-Flight Entertainment (IFE) System for Operation
TASK 23-73-00-861-001-A
Energize the Cabin Intercommunication Data System (CIDS)
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
TASK 31-32-00-860-003-A
Procedure to Get Access to the SYSTEM REPORT/TEST/COM Page
TASK 31-60-00-860-001-A
EIS Start Procedure
TASK 31-60-00-860-002-A
EIS Stop Procedure
3. Job Set-up
Subtask 23-73-00-860-211-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
   (3) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
   (4) Energize the Centralized Fault Display System (CFDS)
(Ref. AMM TASK 31-32-00-860-003).
   (5) Make sure that a minimum of one cabin door is open.
Subtask 23-73-00-860-211-B ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
   (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
   (2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
   (3) Make sure that the Cabin Intercommunication Data System (CIDS) is energized
(Ref. AMM TASK 23-73-00-861-001).
   (4) Energize the Centralized Fault Display System (CFDS).
(Ref. AMM TASK 31-32-00-860-003).
   (5) Do the procedure to make the In-Flight Entertainment (IFE) system ready for operation (Ref. AMM TASK 23-33-00-710-008).
   (6) Make sure that a minimum of one cabin door is open.
Subtask 23-73-00-860-212-A ** ON A/C NOT FOR ALL
B. Make sure that the EMER EXIT LT switch 4WL on the overhead panel 25VU is in the OFF position.
Subtask 23-73-00-865-241-A ** ON A/C NOT FOR ALL
C. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUENGINE/2/FADEC A/AND EIU 22KS2A05
49VUENGINE/1/FADEC A/AND EIU 12KS1A04
49VUAIR COND/CAB/PRESS/CTL11HLD09
** ON A/C NOT FOR ALL
121VUENGINE/ENG2/FADEC B4KS2Q40
** ON A/C NOT FOR ALL
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R41
** ON A/C NOT FOR ALL
121VUHYDRAULIC/LGCIU/SYS22GAQ35
** ON A/C NOT FOR ALL
121VUENGINE/ENG2/FADEC B/AND EIU24KS2Q40
** ON A/C NOT FOR ALL
121VUENGINE/ENG2/FADEC B/AND EIU24KS2R41
121VUENGINE/ENG1/FADEC B/AND EIU 14KS1R40
** ON A/C NOT FOR ALL
122VUAIR COND/CAB PRESS/CTL/22HLY22
4. Procedure
Subtask 23-73-00-740-061-A ** ON A/C NOT FOR ALL
A. Do this test
ACTION
RESULT
1.On the MCDU:
On the MCDU:
  • push the MCDU MENU pushbutton.
  • the MCDU MENU page shows.
  • push the CFDS related line select key.
  • the CFDS page shows.
  • push the SYSTEM REPORT/TEST line select key.
  • the SYSTEM REPORT/TEST page shows.
  • push the COM related line select key.
  • the SYSTEM REPORT/TEST COM page shows.
  • push the CIDS1 related line select key.
  • the CIDS1 page shows.
  • push the SYSTEM TESTS related line select key.
  • the CIDS1 SYSTEM TESTS DIR1 ACTIVE page shows.
  • push the INTERFACE + POWER-UP TEST line select key.
  • the CIDS1 INTERFACE + POWER-UP TEST, DIR1 ACTIVE page with the message 'TEST IN PROGRESS 6 MIN' shows.

  • if the Interface and Power-Up test is complete, the message 'TEST OK' shows.
  • push the MCDU MENU pushbutton.
  • the MCDU MENU page shows.
5. Close-up
Subtask 23-73-00-860-213-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
   (2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).