Visual Inspection of the Modulated Turbine Cooling Actuator (PRE and POST SB LEAP 72-00-0112) [CFML]
TASK 75-23-05-210-801-A
Visual Inspection of the Modulated Turbine Cooling Actuator (PRE and POST SB LEAP 72-00-0112)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 75-23-05-941-054-A
Subtask 75-23-05-210-050-A
Subtask 75-23-05-410-054-A
[Rev.10 from 2021]
2026.04.01 03:14:30 UTC
Visual Inspection of the Modulated Turbine Cooling Actuator (PRE and POST SB LEAP 72-00-0112)
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | WARNING NOTICE(S) |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| 400 | POWER PLANT, NACELLES AND PYLONS |
| FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-70-00-910-804-A | Electrical Standard Practices |
| TASK 71-13-00-010-803-A | Opening of the Fan Cowl Doors |
| TASK 71-13-00-410-803-A | Closing of the Fan Cowl Doors |
| TASK 73-21-60-000-808-A | Removal of the HJ5A Engine Wiring Harness |
| TASK 73-21-60-000-809-A | Removal of the HJ5B Engine Wiring Harness |
| TASK 73-21-60-000-813-A | Removal of the HJ8A Engine Wiring Harness |
| TASK 73-21-60-000-814-A | Removal of the HJ8B Engine Wiring Harness |
| TASK 73-21-60-400-808-A | Installation of the HJ5A Engine Wiring Harness |
| TASK 73-21-60-400-809-A | Installation of the HJ5B Engine Wiring Harness |
| TASK 73-21-60-400-813-A | Installation of the HJ8A Engine Wiring Harness |
| TASK 73-21-60-400-814-A | Installation of the HJ8B Engine Wiring Harness |
| TASK 75-23-05-000-801-A | Removal of the Left Modulated Turbine Cooling (MTC) Actuator |
| TASK 75-23-05-400-801-A | Installation of the Left Modulated Turbine Cooling (MTC) Actuator |
| TASK 78-30-00-040-809-A | Deactivation of the Thrust Reverser System for Ground Maintenance |
| TASK 78-30-00-440-809-A | Reactivation of the Thrust Reverser System after Ground Maintenance |
| TASK 78-36-00-010-806-A | Opening of the Thrust Reverser Cowl Doors |
| TASK 78-36-00-410-806-A | Closing of the Thrust Reverser Cowl Doors |
Subtask 75-23-05-941-054-A
A. Safety Precautions
(1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Put a WARNING NOTICE(S) in position to tell persons not to operate:
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put the WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
Subtask 75-23-05-010-058-A (1) On the center pedestal, on ENG panel 115VU:
(a) Make sure that the ENG/MODE selector switch is in the NORM position.
(b) Make sure that the ENG/MASTER 1(2) control switch was in the OFF position not less than five minutes before you do this procedure.
(c) Put a WARNING NOTICE(S) in position to tell persons not to operate:
- The ENG/MODE selector switch
- The ENG/MASTER 1(2) control switch.
(a) Make sure that the ON legend of the FADEC GND PWR/1(2) pushbutton switch is off.
(b) Put the WARNING NOTICE(S) in position to tell persons not to energize FADEC 1(2).
B. Get Access
(1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR.
Subtask 75-23-05-040-054-A (1) Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-803):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
437AL 438AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
447AL 448AR.
C. Deactivation of the Thrust Reverser (T/R) System for Maintenance
Subtask 75-23-05-010-059-A WARNING:
YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
(1) Do the deactivation of the T/R system for maintenance (Ref. AMM TASK 78-30-00-040-809). D. Get Access
(1) Open the T/R cowl doors (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR.
4. Procedure(1) Open the T/R cowl doors (Ref. AMM TASK 78-36-00-010-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR.
Subtask 75-23-05-210-050-A
A. Visual Inspection of the Modulated Turbine Cooling Actuator
5. Close-upNOTE: For POST LEAP-1A Service Bulletin 72-00-0112 "Elimination of the Right Side Modulated Turbine Cooling Valve" engines, the right side modulated turbine cooling valve and actuator (aft looking forward) are removed.
| INSPECT/CHECK | MAXIMUM SERVICEABLE LIMITS | REMARKS |
|---|---|---|
| 1.Fuel leaks on the actuator body and valve shaft | a) A fuel leak that makes drops of fuel is not permitted. b) A fuel stain (wetting) on the actuator body or actuator valve shaft is permitted, if you do not find drops of fuel. | Replace the modulated turbine cooling actuator (Ref. AMM TASK 75-23-05-000-801) and (Ref. AMM TASK 75-23-05-400-801) or for PRE SB LEAP 72-00-0112 only (Ref. AMM TASK 75-23-05-000-802). |
| 2.Loose modulated turbine cooling actuator | Not permitted. | Tighten the bolts and nuts (Ref. AMM TASK 75-23-05-400-801) and for PRE SB LEAP 72-00-0112 only (Ref. AMM D/O 75-23-05-40). Replace the modulated turbine cooling actuator (Ref. AMM TASK 75-23-05-000-801) and (Ref. AMM TASK 75-23-05-400-801) or for PRE SB LEAP 72-00-0112 only (Ref. AMM TASK 75-23-05-000-802). |
| 3.Cracks and dents on the modulated turbine cooling actuator | Not serviceable. | Replace the modulated turbine cooling actuator (Ref. AMM TASK 75-23-05-000-801) and (Ref. AMM TASK 75-23-05-400-801) or for PRE SB LEAP 72-00-0112 only (Ref. AMM TASK 75-23-05-000-802). |
| 4.Scores on the piston rod of the modulated turbine cooling actuator | Not serviceable. | Replace the modulated turbine cooling actuator (Ref. AMM TASK 75-23-05-000-801) and (Ref. AMM TASK 75-23-05-400-801) or for PRE SB LEAP 72-00-0112 only (Ref. AMM TASK 75-23-05-000-802). |
| 5.Bent modulated turbine cooling actuator piston rod | Not serviceable. | Replace the modulated turbine cooling actuator (Ref. AMM TASK 75-23-05-000-801) and (Ref. AMM TASK 75-23-05-400-801) or for PRE SB LEAP 72-00-0112 only (Ref. AMM TASK 75-23-05-000-802). |
| 6.Leakage or signs of wetting around the electrical connector | Not serviceable. | Replace the modulated turbine cooling actuator (Ref. AMM TASK 75-23-05-000-801) and (Ref. AMM TASK 75-23-05-400-801) or for PRE SB LEAP 72-00-0112 only (Ref. AMM TASK 75-23-05-000-802). |
| 7.Loose electrical connector | Not permitted. | Tighten the electrical connector (Ref. AMM TASK 70-70-00-910-804). |
| 8.Damaged electrical connector | Not permitted. | Replace the wiring harness (Ref. AMM TASK 73-21-60-000-808) and (Ref. AMM TASK 73-21-60-400-808) or for PRE SB LEAP 72-00-0112 only (Ref. AMM TASK 73-21-60-000-809) and (Ref. AMM TASK 73-21-60-400-809) or (Ref. AMM TASK 73-21-60-000-813) and (Ref. AMM TASK 73-21-60-400-813) or for PRE SB LEAP 72-00-0112 only (Ref. AMM TASK 73-21-60-000-814) and (Ref. AMM TASK 73-21-60-400-814). |
| 9.Damage to the modulated turbine cooling actuator electrical receptacle | Small damage to the modulated turbine cooling actuator receptacle threads is permitted. | Repair the damage so that the connector can be tightened and hold torque. |
Subtask 75-23-05-410-054-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the T/R cowl doors (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR.
Subtask 75-23-05-440-052-A Subtask 75-23-05-410-055-A (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the T/R cowl doors (Ref. AMM TASK 78-36-00-410-806):
(a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENGINE 1)
451AL 452AR.
(b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENGINE 2)
461AL 462AR.