Electrical Standard Practices [CFML]
TASK 70-70-00-910-804-A
Electrical Standard Practices
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 70-70-00-860-055-A
Subtask 70-70-00-910-057-A
[Rev.10 from 2021]
2026.04.01 05:45:46 UTC
Electrical Standard Practices
1. Reason for the Job
Self explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 70-27-00-910-809-A | Cleaning of Contact Points and Wiring Harness (with Pre-Clean) |
| TASK 70-70-00-910-806-A | Vendor Code, Name and Address |
| TASK 70-70-00-910-807-A | Backshell Lockwire Procedure |
| TASK 70-71-31-910-801-A | Harness General |
Subtask 70-70-00-860-055-A
A. Not Applicable
4. ProcedureSubtask 70-70-00-910-057-A
A. Electrical Standard Practices
NOTE: This chapter is not applicable to the European Conformity Certificate (ECC) Control Harnesses.
(1) All the data in Chapter/Section 70-7X are related to the CFM LEAP-1A Power Plant only. The location of the data for the repair of all the harness connectors and wires is shown below: | SUBJECT | TAKS |
|---|---|
| Harness General | (Ref. AMM TASK 70-71-31-910-801) |
| Harness Cleaning | (Ref. AMM TASK 70-27-00-910-809) |
| Vendor Code, Name and Address | (Ref. AMM TASK 70-70-00-910-806) |
| Backshell Lockwire Procedure | (Ref. AMM TASK 70-70-00-910-807) |