Installation of the NLG Electrical Harness 1M
TASK 32-21-43-400-002-A
Installation of the NLG Electrical Harness 1M
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 32-21-43-860-055-A
Subtask 32-21-43-410-052-A
Subtask 32-21-43-942-052-A
[Rev.10 from 2021]
2026.04.01 00:42:42 UTC
Installation of the NLG Electrical Harness 1M
WARNING:
MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING GEAR. THIS WILL PREVENT UNWANTED MOVEMENT OF THE LANDING GEAR, AND THUS POSSIBLE INJURY TO PERSONS AND DAMAGE TO THE AIRCRAFT AND/OR EQUIPMENT.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE |
| No specific | AR | CAP - BLANKING |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.06LDG2) | Non Hardening Jointing Putty-High Temp. Area - Structure |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 4 | BRAID | AIPC 32-21-43-31-160 |
| 66 | BRAID | AIPC 32-21-43-31-160 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 32-00-00-481-001-A | Installation of the Safety Devices on the Landing Gears |
| TASK 32-00-00-481-002-A | Installation of the Safety Devices on the Landing Gear Doors |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
| TASK 32-22-00-010-001-A | Nose Gear Doors - Ground Doors Opening |
| TASK 32-22-00-410-001-A | Nose Gear Doors - Ground Doors Closing |
| TASK 32-51-00-710-001-A | Operational Test of the Nose Wheel Steering with the CFDS |
| TASK 32-69-00-740-001-A | BITE Check of Landing-Gear Control Interface-Unit (LGCIU) With Use of MCDU to Ensure that Continuous BITE is Operative |
| TASK 33-43-00-710-001-A | Operational Test of the Runway Turnoff Lights |
| TASK 33-46-00-710-001-A | Operational Test of the Taxi and Take Off Lights |
Subtask 32-21-43-860-055-A
A. Aircraft Maintenance Configuration
(1) Make sure that the safety devices are installed on the landing gears (Ref. AMM TASK 32-00-00-481-001).
(2) Make sure that the WARNING NOTICE(S) is(are) in position:
(4) Make sure that the safety devices are correctly installed on the landing gear doors (Ref. AMM TASK 32-00-00-481-002).
(5) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position adjacent to the NLG.
(6) If the electrical power is not necessary for other tasks, make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002). Then, it is not necessary to operate the circuit breakers below.
Subtask 32-21-43-865-057-A (1) Make sure that the safety devices are installed on the landing gears (Ref. AMM TASK 32-00-00-481-001).
(2) Make sure that the WARNING NOTICE(S) is(are) in position:
- on the right center instrument-panel 400VU, to tell persons not to operate the landing gear control lever.
- on the NWS handwheels and the rudder pedals to tell persons not to operate them.
(4) Make sure that the safety devices are correctly installed on the landing gear doors (Ref. AMM TASK 32-00-00-481-002).
(5) Make sure that the ACCESS PLATFORM 2M (6 FT) - ADJUSTABLE is in position adjacent to the NLG.
(6) If the electrical power is not necessary for other tasks, make sure that the aircraft electrical circuits are de-energized (Ref. AMM TASK 24-41-00-862-002). Then, it is not necessary to operate the circuit breakers below.
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 32-21-43-869-063-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| 122VU | LIGHTING/EXT LT/TAXI AND TAKE OFF/TO | 3LR | W07 |
| 122VU | LIGHTING/EXT LT/RWY TURN OFF/L | 1LC1 | W06 |
C. Flight Configuration Precautions
(1) If the electrical power is necessary for maintenance tasks, do the precautions for flight configuration (Ref. AMM TASK 32-00-00-860-001) after you have opened the circuit breakers.
4. Procedure(1) If the electrical power is necessary for maintenance tasks, do the precautions for flight configuration (Ref. AMM TASK 32-00-00-860-001) after you have opened the circuit breakers.
Subtask 32-21-43-410-052-A
A. Close Access
(1) Remove the access platform(s).
(2) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
Subtask 32-21-43-420-052-A (1) Remove the access platform(s).
(2) Close the NLG doors (Ref. AMM TASK 32-22-00-410-001).
B. Installation of the Upper Harness 1M
(a) Put the clamp (62) in position on the bracket (59), install the washers (63) the screws (64), the washers (61), the nuts (60) and tighten them.
(b) Connect the electrical connector (65) to the connector on the A/C interface 1300VCA.
(c) Safety the grommet (67) with the AIPC 32-21-43-31-160 BRAID (66).
(d) Install the clamp (56), the washers (57) and the screw (58) to the bracket (55).
(e) Connect the electrical connector (53) to the proximity sensor 18GAA on the bracket (54).
(f) Install the clamp (48), the strut (47), the washer (46) and the screw (45) to the bracket (52).
(g) Install the clamp (51), the washer (50) and the screw (49) to the bracket (52).
(h) Install the clamp (44), the washer (39) the screw (38), the washer (43) and the nut (42).
(i) Connect the electrical connector (37) to the connector on the take off light 7LRA (41).
(j) Install the clamp (32), the washer (34) and the screw (33) to the bracket (27).
(k) Install the clamp (29), the washer (30) and the screw (31) to the bracket (27).
(l) Connect the electrical connectors (36) to the feedback sensor 3GCA (35).
(m) Safety the grommets (2) with the AIPC 32-21-43-31-160 BRAID (4).
(n) Install the clamp (5), the washer (6) and the screw (7) to the bracket (1).
(o) Install the clamp (3), the washer (8) and the screw (9) to the bracket (1).
(p) Install the clamp (12), the washers (11) and the screw (10) to the bracket (1).
(q) Connect the electrical connector (16) to the left runway turnoff light 3LC1A (17).
(r) Install the clamp (13), the washer (14) and the screw (15) to the bracket.
(s) Connect the electrical connector (19) to the connector (18).
(t) Install the clamp (22), the washer (23) and the screw (24) to the bracket (21).
(u) Connect the electrical connectors (26) to the NLG proximity sensor 24GAA (25).
Subtask 32-21-43-865-058-A NOTE: Remove the CAP - BLANKING from the electrical connectors immediately before you connect them.
NOTE: Apply a layer of Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to the threads of all the nuts and bolts before you install them.
(1) Hold the upper harness 1M (28) in position and: (a) Put the clamp (62) in position on the bracket (59), install the washers (63) the screws (64), the washers (61), the nuts (60) and tighten them.
(b) Connect the electrical connector (65) to the connector on the A/C interface 1300VCA.
(c) Safety the grommet (67) with the AIPC 32-21-43-31-160 BRAID (66).
(d) Install the clamp (56), the washers (57) and the screw (58) to the bracket (55).
(e) Connect the electrical connector (53) to the proximity sensor 18GAA on the bracket (54).
(f) Install the clamp (48), the strut (47), the washer (46) and the screw (45) to the bracket (52).
(g) Install the clamp (51), the washer (50) and the screw (49) to the bracket (52).
(h) Install the clamp (44), the washer (39) the screw (38), the washer (43) and the nut (42).
(i) Connect the electrical connector (37) to the connector on the take off light 7LRA (41).
(j) Install the clamp (32), the washer (34) and the screw (33) to the bracket (27).
(k) Install the clamp (29), the washer (30) and the screw (31) to the bracket (27).
(l) Connect the electrical connectors (36) to the feedback sensor 3GCA (35).
(m) Safety the grommets (2) with the AIPC 32-21-43-31-160 BRAID (4).
(n) Install the clamp (5), the washer (6) and the screw (7) to the bracket (1).
(o) Install the clamp (3), the washer (8) and the screw (9) to the bracket (1).
(p) Install the clamp (12), the washers (11) and the screw (10) to the bracket (1).
(q) Connect the electrical connector (16) to the left runway turnoff light 3LC1A (17).
(r) Install the clamp (13), the washer (14) and the screw (15) to the bracket.
(s) Connect the electrical connector (19) to the connector (18).
(t) Install the clamp (22), the washer (23) and the screw (24) to the bracket (21).
(u) Connect the electrical connectors (26) to the NLG proximity sensor 24GAA (25).
C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-21-43-869-058-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| 122VU | LIGHTING/EXT LT/TAXI AND TAKE OFF/TO | 3LR | W07 |
| 122VU | LIGHTING/EXT LT/RWY TURN OFF/L | 1LC1 | W06 |
D. After you close the LGCIU circuit breakers, put the aircraft back to the correct (ground) condition (Ref. AMM TASK 32-00-00-860-002).
Subtask 32-21-43-710-060-A E. Test
(1) Do the operational test of the taxi and take off light (Ref. AMM TASK 33-46-00-710-001).
(2) Do the operational test of the runway turnoff lights (Ref. AMM TASK 33-43-00-710-001).
(3) Do the operational test of the nose wheel steering (Ref. AMM TASK 32-51-00-710-001).
(4) Do the BITE test of the landing gear (Ref. AMM TASK 32-69-00-740-001).
5. Close-up(1) Do the operational test of the taxi and take off light (Ref. AMM TASK 33-46-00-710-001).
(2) Do the operational test of the runway turnoff lights (Ref. AMM TASK 33-43-00-710-001).
(3) Do the operational test of the nose wheel steering (Ref. AMM TASK 32-51-00-710-001).
(4) Do the BITE test of the landing gear (Ref. AMM TASK 32-69-00-740-001).
Subtask 32-21-43-942-052-A
A. Removal of Equipment
(1) Remove the WARNING NOTICE(S).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Remove the WARNING NOTICE(S).
(2) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
NLG - Electrical Harness 1M