Operational Test of the Runway Turnoff Lights
TASK 33-43-00-710-001-A
Operational Test of the Runway Turnoff Lights
1. Reason for the Job
Make sure that the turnoff lights operate correctly.
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 33-43-00-861-051-A Subtask 33-43-00-865-050-A
Subtask 33-43-00-710-050-A
Subtask 33-43-00-942-054-A
[Rev.10 from 2021]
2026.04.01 08:26:17 UTC
Operational Test of the Runway Turnoff Lights
1. Reason for the Job
Make sure that the turnoff lights operate correctly.
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
Subtask 33-43-00-861-051-A Subtask 33-43-00-865-050-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 122VU | LIGHTING/EXT LT/TAXI AND TAKE OFF/CTL | 2LR | W09 |
| 122VU | LIGHTING/EXT LT/RWY TURN OFF/L | 1LC1 | W06 |
| 122VU | LIGHTING/EXT LT/RWY TURN OFF/R | 1LC2 | W05 |
Subtask 33-43-00-710-050-A
A. Operational Test of Lights
Subtask 33-43-00-862-051-A 5. Close-up| ACTION | RESULT |
|---|---|
On the panel 25VU:
| On the nose landing gear:
|
|
|
Subtask 33-43-00-942-054-A
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(1) Make sure that the work area is clean and clear of tools and other items.