W DOC AIRBUS | AMM A320F

Operational Test of the Runway Turnoff Lights


TASK 33-43-00-710-001-A
Operational Test of the Runway Turnoff Lights


1. Reason for the Job
Make sure that the turnoff lights operate correctly.
2. Job Set-up Information
 A. Referenced Information
REFERENCE
DESIGNATION
TASK 24-41-00-861-002-A
Energize the Aircraft Electrical Circuits from the External Power
TASK 24-41-00-861-002-A-01
Energize the Aircraft Electrical Circuits from the APU
TASK 24-41-00-861-002-A-02
Energize the Aircraft Electrical Circuits from Engine 1(2)
TASK 24-41-00-862-002-A
De-energize the Aircraft Electrical Circuits Supplied from the External Power
TASK 24-41-00-862-002-A-01
De-energize the Aircraft Electrical Circuits Supplied from the APU
TASK 24-41-00-862-002-A-02
De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2)
3. Job Set-up
Subtask 33-43-00-861-051-A
A. Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
Subtask 33-43-00-865-050-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
122VULIGHTING/EXT LT/TAXI AND TAKE OFF/CTL2LRW09
122VULIGHTING/EXT LT/RWY TURN OFF/L1LC1W06
122VULIGHTING/EXT LT/RWY TURN OFF/R1LC2W05
4. Procedure
Subtask 33-43-00-710-050-A
A. Operational Test of Lights
ACTION
RESULT
On the panel 25VU:
  • set the RWY TURN OFF switch to ON,
On the nose landing gear:
  • the runway turnoff lights come on,
  • set the RWY TURN OFF switch to OFF.
  • the runway turnoff lights go off.
Subtask 33-43-00-862-051-A
B. De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
5. Close-up
Subtask 33-43-00-942-054-A
A. Close Access
   (1) Make sure that the work area is clean and clear of tools and other items.
[Rev.10 from 2021] 2026.04.01 08:26:17 UTC