Operational Test of the Nose Wheel Steering with the CFDS
TASK 32-51-00-710-001-A
Operational Test of the Nose Wheel Steering with the CFDS
Self explanatory
2. Job Set-up Information
A. Referenced Information
3. Job Set-up
Subtask 32-51-00-860-050-A
Subtask 32-51-00-710-050-A ** ON A/C NOT FOR ALL
Subtask 32-51-00-860-051-A
[Rev.10 from 2021]
2026.04.01 12:30:29 UTC
Operational Test of the Nose Wheel Steering with the CFDS
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
CAUTION:
BEFORE YOU START THE NOSE WHEEL STEERING TEST, MAKE SURE THAT NO BOARDING BRIDGES ARE CONNECTED TO THE PASSENGER/CREW DOORS. IF A BOARDING BRIDGE IS CONNECTED, DAMAGE CAN OCCUR TO THE AIRCRAFT.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Referenced Information
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-32-00-860-009-A | Procedure to Get Access to the SYSTEM REPORT/TEST/L/G Page |
| TASK 34-10-00-860-004-A | Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-01 | Automatic Inertial Reference (IR) Alignment-Procedure |
| TASK 34-10-00-860-004-A-02 | Inertial Reference (IR) Alignment-Procedure to do a Check of the Links between each Flight Management and Guidance Computer (FMGC) and the three Air Data/Inertial Reference Units (ADIRUs) |
Subtask 32-51-00-860-050-A
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the MCDU, get the SYSTEM REPORT/TEST L/G page (Ref. AMM TASK 31-32-00-860-009).
(3) Do the IR alignment procedure (Ref. AMM TASK 34-10-00-860-004).
Subtask 32-51-00-865-050-A (1) Energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-861-002).
(2) On the MCDU, get the SYSTEM REPORT/TEST L/G page (Ref. AMM TASK 31-32-00-860-009).
(3) Do the IR alignment procedure (Ref. AMM TASK 34-10-00-860-004).
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/SPLY | 4GG | M36 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS2/CTL | 3GG | M35 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/CTL | 1GG | M34 |
| 121VU | HYDRAULIC/BRAKING AND STEERING/SYS1/IND AND/SPLY | 2GG | M33 |
Subtask 32-51-00-710-050-A ** ON A/C NOT FOR ALL
A. Operational Test of the Nose Wheel Steering with the CFDS
Subtask 32-51-00-710-050-C ** ON A/C NOT FOR ALL | ACTION | RESULT |
|---|---|
| 1.On the MCDU, push the line key adjacent to the BSCU 1 indication. |
|
| 2.Push the line key adjacent to the TEST indication. |
|
| 3.Obey the instructions shown on the screen. Wait 5 seconds then push the line key adjacent to the TEST indication. | The test starts and continues for 45 seconds. If the test finds no fault: - the NO FAILURE indication comes into view. If the test results are incorrect: - a list of fault messages comes into view. |
| 4.Push the line key adjacent to the RETURN indication to get the SYSTEM REPORT/TEST L/G page. |
|
| 5.Push the line key adjacent to the BSCU 2 indication. |
|
| 6.Do the same actions as in Para. 2. and 3.. |
|
A. Operational Test of the Nose Wheel Steering with the CFDS
5. Close-upNOTE: This test is for channel 1. For channel 2, use the indications between parentheses.
| ACTION | RESULT |
|---|---|
| 1.On the MCDU, push the line key adjacent to the BSCU 1(2) indication. |
|
| 2.Push the line key adjacent to the SYSTEM TESTS indication. |
|
| 3.Push the line key adjacent to the LRU WIRING & BSCU TEST indication. |
|
| 4.Do a check of these initial conditions: | |
| On the lower ECAM DU, the ELEC page comes into view. On the ELEC page:
|
| |
| 5.Push the line key adjacent to the START TEST indication. NOTE: If the IN PROGRESS 4S indication stays in view, push the line key adjacent to the RETURN indication. Do a check of all the initial conditions and do the test again. | On the BSCU CHAN 1(2) page:
NOTE: The prompt ">" to the right of the Class number show that there are TSD pages related to this fault. Push the line key adjacent to the prompt to get access to these pages.
|
| 6.Push the line key adjacent to the RETURN indication to get the SYSTEM REPORT/TEST/L/G page. | |
Subtask 32-51-00-860-051-A
A. Put the aircraft back to its initial configuration.
(1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).
(1) On the MCDU, push the line select key adjacent to the RETURN indication until the CFDS menu page comes into view.
(2) De-energize the aircraft electrical circuits (Ref. AMM TASK 24-41-00-862-002).