Operational Test of the ELAC 2 STBY PWR SPLY Availability in case of loss of Blue Hydraulic Pressure (To be done before revenue flight landing gear down)
TASK 27-93-00-710-002-A
Operational Test of the ELAC 2 STBY PWR SPLY Availability in case of loss of Blue Hydraulic Pressure (To be done before revenue flight landing gear down)
Self explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
B. Referenced Information
3. Job Set-up
Subtask 27-93-00-861-053-A Subtask 27-93-00-865-053-A
Subtask 27-93-00-710-053-B
Subtask 27-93-00-860-056-A
[Rev.10 from 2021]
2026.03.31 23:59:29 UTC
Operational Test of the ELAC 2 STBY PWR SPLY Availability in case of loss of Blue Hydraulic Pressure (To be done before revenue flight landing gear down)
ZONE: 210
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Work Zones and Access Panels
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 210 | CKPT,FWD COMPT BHD TO FLT COMPT BULKHEAD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 29-10-00-863-003-A | Pressurize the Blue Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-863-003-A-01 | Pressurize the Blue Hydraulic System with the Blue Electric Pump |
| TASK 29-10-00-864-003-A | Depressurize the Blue Hydraulic System |
| TASK 29-23-00-863-001-A | Pressurize the Green Hydraulic System from the Yellow Hydraulic System through the PTU with the Electric Pump |
| TASK 29-23-00-864-001-A | Depressurize the Green and Yellow Hydraulic Systems after Operation of the PTU |
| TASK 29-24-00-863-001-A | Pressurize the Yellow Hydraulic System with the Electric Pump |
| TASK 29-24-00-864-001-A | Depressurize the Yellow Hydraulic System |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
Subtask 27-93-00-861-053-A Subtask 27-93-00-865-053-A
B. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 27-93-00-860-055-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT1 | 19CE1 | Q16 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |
C. Aircraft Maintenance Configuration
(1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(2) On the center pedestal, on the ECAM control panel, push the F/CTL key (on the lower ECAM display unit, the F/CTL page comes into view).
(3) On the overhead panel 24VU:
(5) Obey the applicable safety precautions before you open the LGCIU circuit breakers (Ref. AMM TASK 32-00-00-860-001).
4. Procedure(1) Do the EIS start procedure (Ref. AMM TASK 31-60-00-860-001).
(2) On the center pedestal, on the ECAM control panel, push the F/CTL key (on the lower ECAM display unit, the F/CTL page comes into view).
(3) On the overhead panel 24VU:
- Make sure that the FLT CTL/ELAC 2 pushbutton switch is pushed (on this pushbutton switch, the OFF and FAULT legends are off).
(5) Obey the applicable safety precautions before you open the LGCIU circuit breakers (Ref. AMM TASK 32-00-00-860-001).
Subtask 27-93-00-710-053-B
A. Operational Test of the ELAC 2 STBY PWR SPLY Availability in case of loss of the Blue Hydraulic Pressure
5. Close-up| ACTION | RESULT |
|---|---|
| 1.Open the circuit breakers 1GA and 52GA. | On the lower ECAM display unit, the ELAC 2 indication is green. |
| 2.Open the circuit breaker 15CE2. | You can hear the single chime. |
| | On the panels 130VU and 131VU:
|
| | On the upper ECAM display unit, the ELAC 2 FAULT warning comes into view. |
| | On the lower ECAM display unit, the ELAC 2 indication changes to amber. |
| | On the overhead panel 24VU:
|
| 3.Open the circuit breaker 19CE1. | On the lower ECAM display unit, the ELAC 2 indication changes to green. |
| | On the upper ECAM display unit, the ELAC 2 FAULT warning goes out of view. |
| | On the overhead panel 24VU:
|
| | After approximately 30 seconds:
|
| 4.Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003). | On the panels 130VU and 131VU:
|
| | On the upper ECAM display unit, the ELAC 2 FAULT warning goes out of view. |
| | On the lower ECAM display unit, the ELAC 2 indication changes to green. |
Subtask 27-93-00-860-056-A
A. Put the aircraft back to its initial configuration.
(1) Put the aircraft back to the correct (ground) condition (Ref. AMM TASK 32-00-00-860-002).
(2) Depressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
Subtask 27-93-00-865-054-A (1) Put the aircraft back to the correct (ground) condition (Ref. AMM TASK 32-00-00-860-002).
(2) Depressurize the Green and Yellow hydraulic systems (Ref. AMM TASK 29-23-00-864-001) (Ref. AMM TASK 29-24-00-864-001).
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 27-93-00-860-057-A Subtask 27-93-00-862-053-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| 121VU | FLIGHT CONTROLS/THS ACTR/MOT1 | 19CE1 | Q16 |
| 121VU | FLIGHT CONTROLS/ELAC2/NORM/SPLY | 15CE2 | R20 |