W DOC AIRBUS | AMM A320F

Installation of the Pylon-to-Wing Forward Attach-Fitting at RIB4


TASK 54-51-17-400-001-A
Installation of the Pylon-to-Wing Forward Attach-Fitting at RIB4


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
WARNING: DO NOT GET FUEL IN YOUR MOUTH, EYES OR ON YOUR SKIN. DO NOT BREATHE THE FUMES FROM THE FUEL. KEEP THE FUEL AWAY FROM SPARKS, FLAME AND HEAT. FUEL IS POISONOUS AND FLAMMABLE, WHICH CAN CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT.
CAUTION: BEFORE YOU INSTALL/REMOVE THE GSE-TOOL, READ THE INSTRUCTIONS IN THE APPLICABLE GSE INSTRUCTION MANUAL. WHILE YOU OPERATE THIS TOOL, CAREFULLY OBEY THEM. IF YOU DO NOT OBEY THE INSTRUCTIONS, DAMAGE TO EQUIPMENT CAN OCCUR.
CAUTION: THIS PART IS A REMOVABLE STRUCTURAL COMPONENT (RSC), WHICH CAN BE MOVED BETWEEN AIRCRAFT. THUS IT CAN HAVE DIFFERENT OPERATION CONDITIONS AND A DIFFERENT LIFE RECORD (FLIGHT HOURS/FLIGHT CYCLES/CALENDAR) FROM THE AIRCRAFT IT IS INSTALLED ON OR REMOVED FROM. THE OPERATOR IS RESPONSIBLE FOR THE SPECIFIC TRACKING AND CONTINUED AIRWORTHINESS OF REMOVABLE STRUCTURAL COMPONENTS. INCORRECT MAINTENANCE OF THESE COMPONENTS CAN CAUSE A RISK FOR THE FLIGHT SAFETY.
ZONE: 410
ZONE: 420
ZONE: 470
ZONE: 480
FIN: 1000EM1 ** ON A/C NOT FOR ALL
FIN: 1000EM2 ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE
No specific
AR
CONTAINER 3 L(3/4 USGAL)
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 5 and 4 m.daN (36.87 and 29.50 lbf.ft ) T
98A54403024003
1
ADAPTOR-DYNAMOMETRIC AT RIB 1
98D54403000000
1
DUMMY SHACKLES-PYLON TO WING YOKES
98D54403001000
1
DUMMY SLEEVES-PYLON TO WING YOKES
98D54503000000
1
PYLON REMOVAL-WRENCH
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03FAB1)
Mineral Oil base Grease-- Vaseline or Petrolatum -
(Material No.03HBD9)
Synthetic Ester base Grease-General Purpose Low Temp -
(Material No.08BAA9)
Non Aqueous Cleaner-General - -
(Material No.14QFB1)
Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -
(Material No.14SBA1)
Textile-Lint free Cotton -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
410
ENG 1 PYLON BOX AND FORWARD FAIRING
420
ENG 2 PYLON BOX AND FORWARD FAIRING
470
ENGINE 1 AFT PYLON
480
ENGINE 2 AFT PYLON
471AL, 481AL, 521BT, 521HB, 621BT, 621HB
414FR, 423FL, 472AR, 482AR
471AR, 471BL, 471BR, 481AR, 481BL, 481BR
FOR [1000EM1] (ENGINE-1)
437AL, 438AR, 451AL, 452AR
FOR [1000EM2] (ENGINE-2)
447AL, 448AR, 461AL, 462AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
14
O-RING
AIPC 28-21-06-01-070
3
O-RING
AIPC 28-21-06-01-070
12
RETAINING RINGS
AIPC 28-21-06-01-110
13
O-RING
AIPC 28-21-06-01-170
4
O-RING
AIPC 28-21-06-01-170
5
RETAINING RINGS
AIPC 28-21-06-01-180
1
COTTER PINS
AIPC 36-11-05-07-170
28
COTTER PINS
AIPC 54-51-17-01-020
27
NUTS
AIPC 54-51-17-01-030
26
NUTS
AIPC 54-51-17-01-040
25
LOCKWASHERS
AIPC 54-51-17-01-050
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 05-57-00-200-001-A
Aircraft Stability
TASK 05-57-00-200-001-B
Aircraft Stability
TASK 05-57-00-200-001-C
Aircraft Stability
TASK 07-11-00-586-002-A
Lowering of the Aircraft for Maintenance Operations
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 28-00-00-910-001-A
Fuel Safety Procedures
TASK 28-16-42-400-001-A
Installation of the Fuel Recirculation Check-valve
TASK 54-53-11-000-002-A
Removal of the Pylon-to-Wing Access Panels
TASK 54-53-11-000-002-B
Removal of the Pylon-to-Wing Access Panels
TASK 54-53-11-400-002-A
Installation of the Pylon-to-Wing Access Panels
TASK 54-53-11-400-002-B
Installation of the Pylon-to-Wing Access Panels
TASK 57-41-37-000-009-A
Removal of the Access Panel
TASK 57-41-37-000-011-A
Removal of the Access Panel
TASK 57-41-37-400-009-A
Installation of the Access Panel
TASK 57-41-37-400-011-A
Installation of the Access Panel
TASK 71-00-00-400-040-A
Installation of the Power Plant
TASK 71-00-00-400-040-A-01
Installation of the Power Plant with the Engine Positioner TWW 75E
TASK 71-00-00-400-040-A-03
Installation of the Power Plant with Jacxson Tool
TASK 71-00-00-400-042-A
Installation of the Power Plant
TASK 71-00-00-400-042-A-01
Installation of the Power Plant with the Engine Positioner TWW 75E (MIAG)
TASK 71-00-00-400-042-A-03
Installation of the Power Plant with Jacxson Tool
TASK 71-00-20-400-040-A
Installation of the Power Plant
TASK 71-00-20-400-040-A-01
Installation of the Power Plant with the Engine Positioner TWW 75E (MIAG)
TASK 71-13-11-400-010-A
Installation of the Left Fan Cowl
TASK 71-13-11-400-040-A
Installation of the Fan Cowl Doors
TASK 71-13-11-400-041-A
Installation of the Fan Cowl Doors
TASK 71-13-16-400-010-B
Installation of the Right Fan Cowl (438AR, 448AR)
TASK 78-30-00-081-041-A
Make the Thrust Reverser Serviceable after Maintenance
TASK 78-30-00-081-041-B
Make the Thrust Reverser Serviceable after Maintenance
TASK 78-30-00-440-012-A
Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance
TASK 78-32-01-400-010-A
Installation of the Left Thrust Reverser Half - Eng No. 1
TASK 78-32-02-400-010-A
Installation of the Left Thrust Reverser Half - Eng No. 2
TASK 78-32-03-400-010-A
Installation of the Right Thrust Reverser Half - Eng No. 1
TASK 78-32-04-400-010-A
Installation of the Right Reverser Half - Eng. No. 2
TASK 78-32-11-400-002-A
Installation of the Left or Right Half Door of Thrust Reverser
TASK 78-32-11-400-040-A
Installation of the Left or Right Half Door of Thrust Reverser
F Fuel Junction in the Pylon ** ON A/C NOT FOR ALL
F Fuel Junction in the Pylon ** ON A/C NOT FOR ALL
F Fuel Junction in the Pylon ** ON A/C NOT FOR ALL
F Temperature Sensor and Rods ** ON A/C NOT FOR ALL
F Temperature Sensor and Rods ** ON A/C NOT FOR ALL
3. Job Set-up
Subtask 54-51-17-860-052-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) On the center pedestal, on ENG panel 115VU:
     (a) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to start engine 1(2).
   (2) On the ENG section of overhead maintenance panel 50VU:
     (a) Make sure that the ON legend of the FADEC GND PWR 1(2) pushbutton switch is off.
     (b) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to energize FADEC GND PWR 1(2).
   (3) Make sure that you obeyed the instructions of the fuel safety procedure (Ref. AMM TASK 28-00-00-910-001).
   (4) Make sure that the aircraft is stable (Ref. AMM TASK 05-57-00-200-001).
Subtask 54-51-17-010-061-A ** ON A/C NOT FOR ALL
B. Removal of the Access Panels
   (1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position:
     (a) For the left pylon, at zones 410 and 470
     (b) For the right pylon, at zones 420 and 480.
   (2) Make sure that the pylon-to-wing access panels are removed (Ref. AMM TASK 54-53-11-000-002):
     (a) For the left pylon: 414FR 471AL and 472AR
     (b) For the right pylon: 423FL 481AL and 482AR.
   (3) Make sure that the access panels are removed (Ref. AMM TASK 57-41-37-000-009) (Ref. AMM TASK 57-41-37-000-011):
     (a) For the left wing: 521BT and 521HB
     (b) For the right wing: 621BT and 621HB.
Subtask 54-51-17-010-061-B ** ON A/C NOT FOR ALL
B. Removal of the Access Panels
   (1) Make sure that the ACCESS PLATFORM 3M (10 FT)- ADJUSTABLE is in position:
     (a) For the left pylon, at zones 410 and 470
     (b) For the right pylon, at zones 420 and 480.
   (2) Make sure that the pylon-to-wing access panels are removed (Ref. AMM TASK 54-53-11-000-002):
     (a) For the left pylon: 471AL 471BL 471AR and 471BR
     (b) For the right pylon: 481AL 481BL 481AR and 481BR.
   (3) Make sure that the access panels are removed (Ref. AMM TASK 57-41-37-000-009) (Ref. AMM TASK 57-41-37-000-011):
     (a) For the left wing: 521BT and 521HB
     (b) For the right wing: 621BT and 621HB.
4. Procedure
Subtask 54-51-17-160-050-A ** ON A/C NOT FOR ALL
A. Preparation before Installation
   (1) Clean the parts from the removed components with Non Aqueous Cleaner-General - - (Material No.08BAA9) and the Textile-Lint free Cotton - (Material No.14SBA1) .
   (2) Before installation, make sure that the nuts (26) or (27) are in the correct condition. If necessary, replace the AIPC 54-51-17-01-040 NUTS (26) or the AIPC 54-51-17-01-030 NUTS (27).
   (3) If installed, remove the
98D54403000000 DUMMY SHACKLES-PYLON TO WING YOKES and the 98D54403001000 DUMMY SLEEVES-PYLON TO WING YOKES.
Subtask 54-51-17-420-054-A ** ON A/C NOT FOR ALL
B. Installation of the Pylon-to-Wing Forward Attach-Fitting
   (1) Apply Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) to the sleeves, the spigot and all the friction surfaces.
   (2) Put the shackles (29) in position.
   (3) Install the sleeves (24). Install the top sleeves first.
   (4) To easily install the sleeves (24), change the force that the jack (3) applies to the attach fitting.
NOTE: The installation positions of the nuts, the cotter pins and the lockwashers are:
  • For the upper attachments, in the outer side of the pylons (always symmetrically to the pylon centerline)
  • For the inner attachments, in the inner side of the pylons (always symmetrically to the pylon centerline
   (5) Install the new AIPC 54-51-17-01-050 LOCKWASHERS (25).
   (6) Install the nuts (26).
   (7) Lock the sleeves (24) with the
98D54503000000 PYLON REMOVAL-WRENCH.
   (8) Use the 98D54503000000 PYLON REMOVAL-WRENCH and a torque wrench to:
     (a) TORQUE the nuts (26) to between 5 and 4 m.daN (36.87 and 29.50 lbf.ft ) T.
   (9) Safety the nuts (26) with the lockwashers (25).
   (10) Install the bolts (23).
   (11) Lock the bolts (23) with the
98D54503000000 PYLON REMOVAL-WRENCH.
   (12) Install the nuts (27) with the 98D54503000000 PYLON REMOVAL-WRENCH.
   (13) TORQUE the nuts (27) to between 5 and 4 m.daN (36.87 and 29.50 lbf.ft ) T.
   (14) Safety the nuts (27) with the
AIPC 54-51-17-01-020 COTTER PINS (28).
Subtask 54-51-17-081-050-A ** ON A/C NOT FOR ALL
C. Removal of the Dynamometric Adaptor and Jack below the Attach Fitting
F Dynamometric Adaptor and Jack ** ON A/C NOT FOR ALL
   (1) Remove the force applied to the JACK - 500 DAN (1124 LBF), ADJUSTABLE (33).
   (2) Remove the adaptor load cell (32) of the 98A54403024003 ADAPTOR-DYNAMOMETRIC AT RIB 1.
   (3) Remove the nuts (36), the washers (35), the screws (34) and the support plate
(31) of the 98A54403024003 ADAPTOR-DYNAMOMETRIC AT RIB 1.
   (4) Remove the 98A54403024003 ADAPTOR-DYNAMOMETRIC AT RIB 1 and the JACK - 500 DAN (1124 LBF), ADJUSTABLE (33).
5. Close-up
Subtask 54-51-17-420-055-A ** ON A/C NOT FOR ALL
A. Connection of the Fuel/Defuel System Components
F Fuel Junction in the Pylon ** ON A/C NOT FOR ALL
F Fuel Junction in the Pylon ** ON A/C NOT FOR ALL
F Fuel Junction in the Pylon ** ON A/C NOT FOR ALL
WARNING: EXTREME CARE MUST BE EXERCISED WHEN INSTALLING THE O-RING SEALS. MISALIGNMENT CAN CAUSE DAMAGE WHICH CAN LEAD TO FUEL LEAKS.
   (1) Make sure that the CONTAINER 3 L(3/4 USGAL) is in position, below the fuel connections.
   (2) Connect the fuel line coupling at RIB4:
     (a) Remove the blanking caps from the disconnected fuel pipe assemblies (15) and (21).
     (b) Apply Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) on the new AIPC 28-21-06-01-070 O-RING (14), AIPC 28-21-06-01-170 O-RING (13), AIPC 28-21-06-01-070 O-RING (3) and AIPC 28-21-06-01-170 O-RING (4).
     (c) Install the new O-rings (13) and (14) on the fuel pipe assemblies (15) and (21).
     (d) Install the new
AIPC 28-21-06-01-110 RETAINING RINGS (12) on the fuel pipe assemblies (15) and (21).
     (e) Install the pipe (1) on the fuel pipe assemblies (15) and (21):
       1 Remove the blanking plugs from the disconnected line ends.
       2 Install the new O-rings (3) and (4) on the pipe (1).
       3 Install the new
AIPC 28-21-06-01-180 RETAINING RINGS (5) on the pipe (1).
       4 Align the pipe (1) with the fuel pipe assemblies (15) and (21).
       5 Make sure that clearance A1 between the fuel pipe assembly (15) and the pipe (1) is 5 +3 mm or -3 mm (0.1969 +0.1181 in. or -0.1181 in.).
       6 Make sure that clearance A1 between the fuel pipe assembly (21) and the pipe (1) is 5 +3 mm or -3 mm (0.1969 +0.1181 in. or -0.1181 in.).
       7 Install the nuts (6) and (8) on the pipe (1) and fuel pipe assemblies (15) and (21).
       8 Put and hold the connectors (7) in the correct position.
       9 Tighten the nuts (6) and (8) with your hand.
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
       10 Safety the nuts (6) and (8) on the connectors (7) with the 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
     (f) Move the sleeves (9) down.
     (g) Put the clamps (11) in position.
     (h) Install the bolts (10).
     (i) Install the nuts (16) and tighten them.
     (j) Install the clamp (17) on the pipe (1).
     (k) Do the electrical bonding of the clamp (17) at the applicable location (
Ref. AMM TASK 20-28-00-912-802).
     (l) Put the bonding straps (18) and (20) in position.
     (m) Install the bolt (2) on the clamp (17).
     (n) Install the nut (19) and tighten it.
   (3) Connect the fuel recirculation check-valve at RIB7 (Ref. AMM TASK 28-16-42-400-001).
Subtask 54-51-17-420-056-A ** ON A/C NOT FOR ALL
B. Installation of the Temperature Sensor and Rods
F Temperature Sensor and Rods ** ON A/C NOT FOR ALL
F Temperature Sensor and Rods ** ON A/C NOT FOR ALL
   (1) Put and hold the rods (5) in position.
   (2) Install the bolts (4).
   (3) Install the washers (3) and the nuts (2).
   (4) Tighten the nuts (2).
   (5) Safety the nuts (2) with the new AIPC 36-11-05-07-170 COTTER PINS (1).
   (6) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (7) Make sure that all the electrical connections are clean and in the correct condition.
   (8) Connect electrical connector 6HA1 (6HA2) to the temperature sensor (6).
  • For the left pylon: 6HA1
  • For the right pylon: 6HA2.
Subtask 54-51-17-586-050-A ** ON A/C NOT FOR ALL Subtask 54-51-17-410-050-A ** ON A/C NOT FOR ALL
D. Installation of the Access Panels
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the pylon-to-wing access panels (Ref. AMM TASK 54-53-11-400-002):
     (a) For the left pylon: 414FR 471AL and 472AR
     (b) For the right pylon: 423FL 481AL and 482AR.
   (3) Install the access panels (Ref. AMM TASK 57-41-37-400-009) (Ref. AMM TASK 57-41-37-400-011):
     (a) For the left wing: 521BT and 521HB
     (b) For the right wing: 621BT and 621HB.
Subtask 54-51-17-410-050-B ** ON A/C NOT FOR ALL
D. Installation of the Access Panels
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Install the pylon-to-wing access panels (Ref. AMM TASK 54-53-11-400-002):
     (a) For the left pylon: 471AL 471BL 471AR and 471BR
     (b) For the right pylon: 481AL 481BL 481AR and 481BR.
   (3) Install the access panels (Ref. AMM TASK 57-41-37-400-009) (Ref. AMM TASK 57-41-37-400-011):
     (a) For the left wing: 521BT and 521HB
     (b) For the right wing: 621BT and 621HB.
Subtask 54-51-17-420-057-A ** ON A/C NOT FOR ALL
E. Installation of the Components
   (1) Install the engine (Ref. AMM TASK 71-00-00-400-040).
   (2) Install the thrust-reverser cowl doors (Ref. AMM TASK 78-32-11-400-040):
     (a) FOR [1000EM1] (ENGINE-1)
     (b) FOR [1000EM2] (ENGINE-2)
   (3) Install the fan cowl doors (Ref. AMM TASK 71-13-11-400-040):
     (a) FOR [1000EM1] (ENGINE-1)
     (b) FOR [1000EM2] (ENGINE-2)
Subtask 54-51-17-420-057-B ** ON A/C NOT FOR ALL
E. Installation of the Components
   (1) Install the engine (Ref. AMM TASK 71-00-20-400-040).
   (2) Install the thrust-reverser cowl doors (Ref. AMM TASK 78-32-01-400-010) (Ref. AMM TASK 78-32-03-400-010) (Ref. AMM TASK 78-32-02-400-010) (Ref. AMM TASK 78-32-04-400-010):
     (a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
     (b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
   (3) Install the fan cowl doors (Ref. AMM TASK 71-13-11-400-010) (Ref. AMM TASK 71-13-16-400-010):
     (a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
     (b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
Subtask 54-51-17-420-057-C ** ON A/C NOT FOR ALL
E. Installation of the Components
   (1) Install the engine (Ref. AMM TASK 71-00-00-400-042).
   (2) Install the thrust-reverser cowl doors (Ref. AMM TASK 78-32-11-400-002):
     (a) FOR [1000EM1] (ENGINE-1)
     (b) FOR [1000EM2] (ENGINE-2)
   (3) Install the fan cowl doors (Ref. AMM TASK 71-13-11-400-041):
     (a) FOR [1000EM1] (ENGINE-1)
     (b) FOR [1000EM2] (ENGINE-2)
Subtask 54-51-17-440-065-A ** ON A/C NOT FOR ALL
F. Reactivation of the Thrust Reverser
   (1) Make the thrust reverser serviceable after maintenance (Ref. AMM TASK 78-30-00-081-041).
Subtask 54-51-17-440-065-B ** ON A/C NOT FOR ALL
F. Reactivation of the Thrust Reverser
   (1) Make the thrust reverser serviceable after maintenance (Ref. AMM TASK 78-30-00-440-012).
Subtask 54-51-17-942-050-A ** ON A/C NOT FOR ALL
G. Close Access
   (1) Remove the access platform(s).
   (2) Remove the WARNING NOTICE(S).
[Rev.10 from 2021] 2026.04.01 12:38:27 UTC