W DOC AIRBUS | AMM A320F

Installation of the Fuselage Tail Cone


TASK 53-58-11-400-007-A
Installation of the Fuselage Tail Cone


WARNING: PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
  • THE FLIGHT CONTROLS
  • THE FLIGHT CONTROL SURFACES
  • THE LANDING GEAR AND THE RELATED DOORS
  • COMPONENTS THAT MOVE.
MOVEMENT OF COMPONENTS CAN KILL OR CAUSE INJURY TO PERSONS AND/OR CAN CAUSE DAMAGE TO THE EQUIPMENT.
WARNING: BE VERY CAREFUL WHEN YOU MOVE A FULL FIRE EXTINGUISHER BOTTLE. A SUDDEN OR HEAVY SHOCK TO A FULL BOTTLE CAN CAUSE UNWANTED DISCHARGE AND INJURY TO PERSONS.
WARNING: BE CAREFUL WHEN YOU REMOVE OR INSTALL THIS EQUIPMENT. THIS EQUIPMENT IS HEAVY (MORE THAN 12 KG (26.5 lb)) AND CAN CAUSE INJURY AND/OR DAMAGE.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION: THIS PART IS A REMOVABLE STRUCTURAL COMPONENT (RSC), WHICH CAN BE MOVED BETWEEN AIRCRAFT. THUS IT CAN HAVE DIFFERENT OPERATION CONDITIONS AND A DIFFERENT LIFE RECORD (FLIGHT HOURS/FLIGHT CYCLES/CALENDAR) FROM THE AIRCRAFT IT IS INSTALLED ON OR REMOVED FROM. THE OPERATOR IS RESPONSIBLE FOR THE SPECIFIC TRACKING AND CONTINUED AIRWORTHINESS OF REMOVABLE STRUCTURAL COMPONENTS. INCORRECT MAINTENANCE OF THESE COMPONENTS CAN CAUSE A RISK FOR THE FLIGHT SAFETY.
ZONE: 310
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
AR
WARNING NOTICE(S)
No specific
Torque wrench: range to between 0.57 and 0.46 m.daN (50.44 and 40.71 lbf.in ) T
No specific
Torque wrench: range to between 1.75 and 1.40 m.daN (12.91 and 10.32 lbf.ft ) T
98A53407566005
1
EXTRACTOR - ATTACH. BOLTS, TAIL CONE
98A55308440000
1
SLING-UNIVERSAL,TAIL PLANE
98D28207510000
1
SLIDE CONE - APU FUEL
98V53809003000
1
TRESTLE-SUPP,TAIL CONE
 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.03FAB1)
Mineral Oil base Grease-- Vaseline or Petrolatum -
(Material No.03HBD9)
Synthetic Ester base Grease-General Purpose Low Temp -
(Material No.05TNB1)
Adhesive Tape-Hoisting points PVC Disks -
(Material No.06LCG9)
Non Hardening Jointing Putty-Medium Temp. Area - -
(Material No.06LDG2)
Non Hardening Jointing Putty-High Temp. Area - Structure
(Material No.12ABB1)
Corrosion Preventive Compound-Water Displacing Hard Film -
(Material No.12ACB1)
Corrosion Preventive Compound-Heavy Duty Hard Film -
(Material No.12ACC1)
Corrosion Preventive Compound-Heavy Duty Soft Film -
(Material No.14QEB1)
Wire-Locking Dia: 0.6 mm CRES Nickel Alloy -
(Material No.14QFB1)
Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
310
FUSLG TAIL SECTION AFT OF AFT PRESS BHD
314AR, 315AL, 316AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
51
O-RINGS
AIPC 28-22-04-11-050
51
O-RINGS
AIPC 28-22-84-11-050
9
AIR SEAL
AIPC 36-12-04-48-130
9
AIR SEAL
AIPC 36-12-84-32-020
73
COTTER PINS
AIPC 53-58-04-01-040
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 07-11-00-586-002-A
Lowering of the Aircraft for Maintenance Operations
TASK 20-21-12-911-001-A
Tightening Torques for Pipe Unions (not for OXYGEN Unions)
TASK 20-28-00-912-802-A
Electrical Bonding - General Maintenance Procedure
TASK 26-13-00-710-001-A
Operational Test of the APU Fire and Overheat Detection System
TASK 27-34-00-710-001-A
Operational Test of the Elevator and Hydraulic Actuation
TASK 28-22-00-710-001-A
Operational Test of the APU Fuel-Pump System on Ground to Purge the Fuel Line
TASK 29-10-00-864-001-A
Depressurize the Green Hydraulic System
TASK 29-10-00-864-002-A
Depressurize the Yellow Hydraulic System
TASK 29-10-00-864-003-A
Depressurize the Blue Hydraulic System
TASK 33-31-00-710-001-A
Operational Test of the Service Area Lighting
TASK 33-41-00-710-001-A
Operational Test of the Navigation Lights
TASK 33-48-00-710-002-A
Operational Test of the Anti-Collision/Strobe Lighting
TASK 36-12-00-710-001-A
Operational Test of the APU Bleed Air Supply and Crossbleed Systems
TASK 36-22-17-400-001-A
Installation of the APU Overheat Sensing-Elements
TASK 49-00-00-710-008-A
Operational Test of the APU
TASK 49-00-00-710-010-A
Operational Test of the APU
TASK 49-16-00-710-003-A
Operational Test of the Air Intake Flap and Diverter (131-9(A))
TASK 49-16-00-710-004-A
Operational Test of the Air Intake Flap and Diverter (APS 3200)
TASK 49-16-43-400-002-A
Installation of the Air Intake Flap (APS 3200)
TASK 49-16-43-400-003-A
Installation of the Air Intake Flap (131-9(A))
TASK 51-75-13-916-002-A
Repair to a layer of Corrosion Preventive Compound
TASK 51-78-00-615-002-A
Aircraft Cleaning after a Hydraulic Fluid Leakage
TASK 52-41-00-410-001-A
Close the APU Doors after Access
TASK 52-41-23-410-801-A
Closing of Access Door 314AR
3. Job Set-up
Subtask 53-58-11-864-053-A
A. Make sure that the Green, Yellow and Blue hydraulic systems are depressurized (Ref. AMM TASK 29-10-00-864-001), (Ref. AMM TASK 29-10-00-864-002), (Ref. AMM TASK 29-10-00-864-003).
Subtask 53-58-11-865-053-A
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B11
49VUFLIGHT CONTROLS/THS/ACTR/MOT219CE2B09
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B08
49VUAUTO FLT/FAC1/28VDC5CC1B04
49VUAUTO FLT/FAC1/26VAC14CC1B03
** ON A/C ALL
49VUAPU/FUEL/BLOW OFF/PUMP2QCB14
49VUAIR BLEED/X FEED/VALVE/BAT2HVD13
** ON A/C NOT FOR ALL
49VUFLIGHT CONTROLS/ELAC1/NORM/SPLY15CE1B06
49VUFLIGHT CONTROLS/THS/ACTR/MOT219CE2B04
49VUFLIGHT CONTROLS/SEC1/NORM/SPLY21CE1B03
49VUAUTO FLT/FAC1/28VDC5CC1H10
49VUAUTO FLT/FAC1/26VAC14CC1H09
** ON A/C ALL
105VUFLIGHT CONTROLS/ELAC2/STBY SPLY16CE2A02
105VUFLT CTL/ELAC1/STBY SPLY16CE1A01
105VUFLT CTL/SEC1/STBY SPLY22CEB01
** ON A/C NOT FOR ALL
121VUAPU/FUEL/BLOW OFF/CTL1QCK39
** ON A/C ALL
121VUAPU/FIRE AND OVHT/DET/LOOP B2WGL44
121VUAPU/FIRE AND OVHT/DET/LOOP A1WGL43
121VUAPU/APU/CTL2KDL42
121VUAPU/ECB/SPLY1KDL41
121VUAPU/AUTO/EXTIG/GND/TEST30WFL40
121VUAPU/FIRE/EXTIG/SQUIB/B2WFL39
121VUAPU/FIRE/EXTIG/SQUIB/A1WFL38
121VUAPU/FIRE/LP VALVE/NORM4WFM42
121VUAPU/FIRE/LP VALVE/STBY3WFM41
121VUAPU/FUEL/LP VALVE/CTL1QFM40
121VUAPU/FUEL/LP VALVE/SPLY2QFM39
121VUAPU/FUEL/PUMP/CTL3QCM38
121VUAUTO FLT/RUDDER/TRIM/IND15CCM20
121VUAUTO FLT/FAC2/28VDC5CC2M19
121VUAUTO FLT/FAC2/26VAC14CC2M18
121VUFLIGHT CONTROLS/SEC3/SPLY21CE3Q19
121VUFLIGHT CONTROLS/SEC2/SPLY21CE2Q18
121VUFLIGHT CONTROLS/THS ACTR/MOT319CE3Q17
121VUFLIGHT CONTROLS/THS ACTR/MOT119CE1Q16
121VUFLIGHT CONTROLS/ELAC2/NORM/SPLY15CE2R20
** ON A/C NOT FOR ALL
121VUAPU/FUEL/BLOW OFF/CTL1QCP38
** ON A/C NOT FOR ALL
122VUAPU GEN/EGIU2/28VDC26XU2Y31
122VUGEN2/EGIU2/28VDC24XU2Y30
122VUELEC/APU/GCU6XSY25
** ON A/C NOT FOR ALL
122VULIGHTING/EXT LT/NAV1/AND LOGO/LT1LAT03
** ON A/C ALL
122VUAIR BLEED/X FEED VALVE/NORM1HVZ20
** ON A/C NOT FOR ALL
122VULIGHT/EXT LT NAV1/AND LOGO/LT1LAT03
Subtask 53-58-11-865-057-A
C. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
PANELDESIGNATIONFINLOCATION
** ON A/C ALL
2001VULIGHT-APU2LJE08
Subtask 53-58-11-869-053-A
D. Aircraft Maintenance Configuration
   (1) Make sure that the aircraft is in the same configuration as for the removal task.
   (2) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to move the flight controls.
4. Procedure
Subtask 53-58-11-210-059-A
A. Preparation for Installation.
   (1) Clean the component interfaces and the adjacent area.
   (2) Do an inspection of the component interfaces and the adjacent area.
   (3) Examine the fuselage to tail-cone seal (65).
   (4) Make sure that the parts retained from the removed component are clean and in the correct condition.
Subtask 53-58-11-420-054-A
B. Installation of the Tail Cone sling
   (1) Put the crane in position.
   (2) Attach the 98A55308440000 SLING-UNIVERSAL,TAIL PLANE.
   (3) Attach the universal sling at the tail cone.
NOTE: Do not use the hoisting lugs with this sling.
Subtask 53-58-11-420-055-A ** ON A/C NOT FOR ALL
C. Installation of the Tail Cone
F Tail Cone Attachment ** ON A/C NOT FOR ALL
   (1) Carefully operate the crane to lift the tail cone from the 98V53809003000 TRESTLE-SUPP,TAIL CONE.
   (2) Put the tail cone in the installation position on the aircraft.
   (3) Make sure that the tail cone bearing (67) aligns with the fuselage spigot (66).
   (4) Remove the installation adaptors (77) from the 98A53407566005 EXTRACTOR - ATTACH. BOLTS, TAIL CONE and install them on the bolts (70).
NOTE: The extractor with part number 98A53407566005 is an alternative to the extractor with part number 98A53407566002. If only the extractor with part number 98A53407566002 is available, then it is recommended to use it.
   (5) Apply Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) on the bolts (70).
   (6) Install the bolts (70) in the upper fittings and the lower fittings. Make sure that you install the bolts (70) in the upper fittings first.
   (7) Remove the installation adaptors (77) from the bolts (70).
   (8) Install the nuts (72).
   (9) TORQUE the nuts (72) to between 1.75 and 1.40 m.daN (12.91 and 10.32 lbf.ft ) T.
   (10) Safety the nuts (72) with the new
AIPC 53-58-04-01-040 COTTER PINS (73).
   (11) Put the access covers (69) in position and install the screws (68).
   (12) Tighten the screws (68).
   (13) Install the bolts (75), the bonding straps (71), the washers (76) and the nuts (74) (
Ref. AMM TASK 20-28-00-912-802).
   (14) Tighten the nuts (74).
   (15) Disconnect the sling from the tail cone.
   (16) If you removed the hoisting lugs, apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) or Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) on them.
   (17) Install the hoisting lugs in the hoisting points with the eye end.
   (18) Apply Adhesive Tape-Hoisting points PVC Disks - (Material No.05TNB1) on the hoisting points.
Subtask 53-58-11-420-055-C ** ON A/C NOT FOR ALL
C. Installation of the Tail Cone
F Tail Cone Attachment ** ON A/C NOT FOR ALL
   (1) Carefully operate the crane to lift the tail cone from the 98V53809003000 TRESTLE-SUPP,TAIL CONE.
   (2) Put the tail cone in the installation position on the aircraft.
   (3) Make sure that the tail cone bearing (67) aligns with the fuselage spigot (66).
   (4) Remove the installation adaptors (77) from the 98A53407566005 EXTRACTOR - ATTACH. BOLTS, TAIL CONE and install them on the bolts (70).
NOTE: The extractor with part number 98A53407566005 is an alternative to the extractor with part number 98A53407566002. If only the extractor with part number 98A53407566002 is available, then it is recommended to use it.
   (5) Apply Synthetic Ester base Grease-General Purpose Low Temp - (Material No.03HBD9) on the bolts (70).
   (6) Install the bolts (70) in the upper fittings and the lower fittings. Make sure that you install the bolts (70) in the upper fittings first.
   (7) Remove the installation adaptors (77) from the bolts (70).
   (8) Install the nuts (72).
   (9) TORQUE the nuts (72) to between 1.75 and 1.40 m.daN (12.91 and 10.32 lbf.ft ) T.
   (10) Safety the nuts (72) with the new
AIPC 53-58-04-01-040 COTTER PINS (73).
   (11) Apply Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.
12ACC1) on the threads of the bolts (70) (Ref. AMM TASK 51-75-13-916-002).
   (12) Apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) or Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) on the screws (68).
   (13) Put the access covers (69) in position and install the screws (68).
   (14) Tighten the screws (68).
   (15) Install the bolts (75), the bonding straps (71), the washers (76) and the nuts (74) (Ref. AMM TASK 20-28-00-912-802).
   (16) Tighten the nuts (74).
   (17) Disconnect the sling from the tail cone.
   (18) If you removed the hoisting lugs, apply Non Hardening Jointing Putty-Medium Temp. Area - - (Material No.06LCG9) or Non Hardening Jointing Putty-High Temp. Area - Structure (Material No.06LDG2) to them.
   (19) Install the hoisting lugs in the hoisting points with the eye end.
   (20) Apply Adhesive Tape-Hoisting points PVC Disks - (Material No.05TNB1) on the hoisting points.
Subtask 53-58-11-420-056-A
D. Connection of the APU fuel line
   (1) Apply the Mineral Oil base Grease-- Vaseline or Petrolatum - (Material No.03FAB1) to the new AIPC 28-22-04-11-050 O-RINGS (51) or AIPC 28-22-84-11-050 O-RINGS (51) and install them on the shrouds (38) and (33).
   (2) Install the shroud (38) with the sleeve (54) over the fuel hose (37).
   (3) Remove the
98D28207510000 SLIDE CONE - APU FUEL and connect the nut (35) to the fitting (36).
   (4) Tighten the nut (35) and safety with the lockwire 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
   (5) Slide the sleeve (54) over the shroud (38) and the shroud (33).
   (6) Install the retaining springs (34) and safety with the lockwire 14QEB1Wire-Locking Dia: 0.6 mm CRES Nickel Alloy -.
   (7) Align the shroud (38) with the sleeve (54) and the shroud (33). Install the clamp (52).
   (8) Put the bonding straps (32), (46) and (53) in position. Install and tighten the bolts (43), the washers (44) and the nuts (49) (Ref. AMM TASK 20-28-00-912-802).
Subtask 53-58-11-420-057-B
E. Installation of the APU air-intake flap
   (1) Install the APU air-intake flap (Ref. AMM TASK 49-16-43-400-001) or (Ref. AMM TASK 49-16-43-400-003).
Subtask 53-58-11-420-058-C Subtask 53-58-11-420-059-A
G. Connection of the hydraulic hoses 1102GM, 1103GM, 3102GM and 3103GM
   (1) Remove the blanking plugs from the hoses.
   (2) Connect the hoses (Ref. AMM TASK 20-21-12-911-001) and paint a red mark on the connections.
   (3) Remove the hydraulic fluid leakage (Ref. AMM TASK 51-78-00-615-002).
Subtask 53-58-11-420-060-A
H. Connection of the Electrical Systems
   (1) Remove the CAP-BLANKING from each electrical connector and receptacle.
   (2) Make sure that all the electrical connections are clean and in the correct condition.
   (3) Put electrical harnesses 6533VN/DC1 and 4643VB/3P in position between FR78 and FR79 and install and tighten the clamps.
   (4) Connect electrical connector 7138VC/3E.
   (5) Safety the electrical connector:
WARNING: USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
     (a) Safety electrical connector 7138VC/3E with the 14QFB1Wire-Locking Dia: 0.8 mm CRES Nickel Alloy -.
   (6) Put electrical harness 4210VB/3E in position between FR77 and FR80 and install and tighten the clamps.
   (7) Connect electrical connectors 7120VC-A/1M and 7118VC-A/1S.
   (8) Connect electrical connectors 7116VC and 11LJ.
   (9) Connect the electrical wiring to switch 8QC.
   (10) Connect the electrical connector:
WARNING: BEFORE YOU TOUCH THE POWER DEVICE CARTRIDGE, MAKE SURE THAT YOU ARE GROUNDED AND THAT YOU INSTALL A SHUNT DEVICE ON IT. USE A CAP OR PLUG AS SHUNT DEVICE (THE CAP OR PLUG WILL SHUNT THE PINS TOGETHER ON THE CARTRIDGE). DO NOT USE A FOIL SHUNT. IF YOU TOUCH A POWER DEVICE CARTRIDGE THAT DOES NOT HAVE A SHUNT DEVICE INSTALLED, AN EXPLOSION CAN OCCUR AND CAUSE INJURIES TO YOU.
     (a) Remove the CAP-BLANKING from each electrical connector and receptacle.
     (b) Remove the MS25043-10DA CARTRIDGE CAP or the 6971-0010 CAP SHUNT-FIRE BOTTLE from cartridge 12WF.
     (c) Connect electrical connector 12WF-A to cartridge 12WF.
   (11) Connect the electrical connector:
CAUTION: MAKE SURE THAT THE ELECTRICAL CONNECTORS ARE CLEAN BEFORE YOU DISCONNECT OR CONNECT THEM. CONTAMINATION ON THE ELECTRICAL CONNECTORS CAN CAUSE DAMAGE TO EQUIPMENT.
     (a) Remove the CAP-BLANKING from each electrical connector and receptacle.
     (b) Connect electrical connector 11WF-A.
   (12) Connect electrical harnesses 6528VN/DC2, 6760VN/B1, 6761VN/DC1 and 6757VN/DC1.
   (13) Install and tighten the clamps on electrical harnesses 4213VB/1M and 4207VB/1M.
   (14) Connect electrical harness 7519VP.
   (15) Install electrical cable 6750VN/DC1.
   (16) Connect electrical connectors 21WG-A and 22WG-A.
   (17) Connect the cable lugs of electrical harness 4622VB/3G to terminal block 7508VT.
   (18) Install and tighten the clamps on electrical harness 4622VB/3G between FR77 and FR79.
   (19) Connect electrical connector 7527VC to the APU air-intake actuator.
   (20) Install and tighten the clamps on electrical harness 4631VB/1M.
Subtask 53-58-11-916-055-A ** ON A/C NOT FOR ALL
I. Protective Treatment
   (1) Apply the Corrosion Preventive Compound-Heavy Duty Soft Film - (Material No.12ACC1) to the inside of the tail cone (Ref. AMM TASK 51-75-13-916-002).
Subtask 53-58-11-916-055-C ** ON A/C NOT FOR ALL
I. Protective Treatment
   (1) Apply a layer of the Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) and a layer of the Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the inside of the tail cone. Do this from FR78 to FR80 below the STGR 13 LH and RH (Ref. AMM TASK 51-75-13-916-002).
   (2) Apply a layer of the Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) to the inside of the tail cone. Do this from FR80 to FR84 below the STGR 13 LH and RH (Ref. AMM TASK 51-75-13-916-002).
   (3) Apply a layer of the Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) and a layer of the Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) to the inside of the tail cone. Do this from FR84 to FR86 below the STGR 15 LH and RH (Ref. AMM TASK 51-75-13-916-002).
   (4) Apply a layer of the Corrosion Preventive Compound-Water Displacing Hard Film - (Material No.12ABB1) and a layer of the Corrosion Preventive Compound-Heavy Duty Hard Film - (Material No.12ACB1) around all of the forward face of the FR86 (Ref. AMM TASK 51-75-13-916-002).
Subtask 53-58-11-710-052-D ** ON A/C NOT FOR ALL
J. Do these Tests:
   (1) Do the operational test of the elevator (Ref. AMM TASK 27-34-00-710-001) and examine the hydraulic hoses 1102GM, 1103GM, 3102GM and 3103GM for leaks.
   (2) Do the operational test of the APU fire detection system (Ref. AMM TASK 26-13-00-710-001).
   (3) Do the operational test of the APU air-intake flap (Ref. AMM TASK 49-16-00-710-004).
   (4) Do the operational test of the APU fuel system (Ref. AMM TASK 28-22-00-710-001) and examine the APU fuel line for leaks.
   (5) Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-008).
   (6) Do the operational test of the APU bleed-air system (Ref. AMM TASK 36-12-00-710-001).
   (7) Do the operational test of the APU compartment lighting (Ref. AMM TASK 33-31-00-710-001).
   (8) Do the operational test of the navigation lights (Ref. AMM TASK 33-41-00-710-001).
   (9) Do the operational test of the anti-collision/strobe lighting (Ref. AMM TASK 33-48-00-710-002).
Subtask 53-58-11-710-052-E ** ON A/C NOT FOR ALL
J. Do these Tests:
   (1) Do the operational test of the elevator (Ref. AMM TASK 27-34-00-710-001) and examine the hydraulic hoses 1102GM, 1103GM, 3102GM and 3103GM for leaks.
   (2) Do the operational test of the APU fire detection system (Ref. AMM TASK 26-13-00-710-001).
   (3) Do the operational test of the APU air-intake flap (Ref. AMM TASK 49-16-00-710-003).
   (4) Do the operational test of the APU fuel system (Ref. AMM TASK 28-22-00-710-001) and examine the APU fuel line for leaks.
   (5) Do the operational test of the APU (Ref. AMM TASK 49-00-00-710-010).
   (6) Do the operational test of the APU bleed-air system (Ref. AMM TASK 36-12-00-710-001).
   (7) Do the operational test of the APU compartment lighting (Ref. AMM TASK 33-31-00-710-001).
   (8) Do the operational test of the navigation lights (Ref. AMM TASK 33-41-00-710-001).
   (9) Do the operational test of the anti-collision/strobe lighting (Ref. AMM TASK 33-48-00-710-002).
5. Close-up
Subtask 53-58-11-586-051-A
A. Aircraft Lowering
   (1) Lower the aircraft (Ref. AMM TASK 07-11-00-586-002).
Subtask 53-58-11-410-057-A
B. Make sure that the work area is clean and clear of tools and other items.
   (1) Close the access door 314AR (Ref. AMM TASK 52-41-23-410-801)
   (2) Close the access doors 315AL and 316AR (Ref. AMM TASK 52-41-00-410-001).
   (3) Remove the access platform(s).
   (4) Remove the WARNING NOTICE(S).
   (5) Remove the ground support and maintenance equipment, the special and standard tools and all other items.