Operational Test of the Air Intake Flap and Diverter (APS 3200)
TASK 49-16-00-710-004-A
Operational Test of the Air Intake Flap and Diverter (APS 3200)
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 49-16-00-860-080-A ** ON A/C NOT FOR ALL
Subtask 49-16-00-710-053-A ** ON A/C NOT FOR ALL
Subtask 49-16-00-865-103-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 12:42:32 UTC
Operational Test of the Air Intake Flap and Diverter (APS 3200)
ZONE: 310
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE |
| No specific | AR | SAFETY CLIP - CIRCUIT BREAKER |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 310 | FUSLG TAIL SECTION AFT OF AFT PRESS BHD |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 49-16-43-400-002-A | Installation of the Air Intake Flap (APS 3200) |
Subtask 49-16-00-860-080-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 49-16-00-865-102-A ** ON A/C NOT FOR ALL (1) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(2) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
B. Open, safety and tag this(these) circuit breaker(s):
Subtask 49-16-00-865-098-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | APU/FUEL/BLOW OFF/PUMP | 2QC | B14 |
| 121VU | APU/FUEL/BLOW OFF/CTL | 1QC | K39 |
| 121VU | APU/FUEL/LP VALVE/CTL | 1QF | M40 |
| 121VU | APU/FUEL/LP VALVE/SPLY | 2QF | M39 |
| 121VU | APU/FUEL/PUMP/CTL | 3QC | M38 |
C. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 49-16-00-010-073-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | APU/APU/CTL | 2KD | L42 |
| 121VU | APU/ECB/SPLY | 1KD | L41 |
D. Get Access
(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the APU Air Intake.
4. Procedure(1) Put the ACCESS PLATFORM 4M (13 FT)-ADJUSTABLE below the APU Air Intake.
Subtask 49-16-00-710-053-A ** ON A/C NOT FOR ALL
A. Operational Test of the Air Intake Flap and Diverter
5. Close-upNOTE: For adjustment of the air-intake flap (Ref. AMM TASK 49-16-43-400-002).
| ACTION | RESULT |
|---|---|
1.On the overhead panel 25VU:
| On the overhead panel 25VU:
|
2.On the ECAM panel:
| On the ECAM systems page:
|
| 3.Examine the contour of the air intake flap and the air intake structure. |
NOTE: If the air intake flap is not in line with the structure, remove the rubber cover on the lower part of the flap actuator rod for access. Disconnect the cotter pin, nut and the bolt that attaches the lower part of the actuator rod to the air intake flap. Adjust the actuator rod length to get the correct position.Then connect the actuator rod to the air intake flap. |
4.On the overhead panel 25VU:
| On the overhead panel 25VU:
|
| 5.Measure the clearance C between the air intake nose and the air intake flap. |
|
Subtask 49-16-00-865-103-A ** ON A/C NOT FOR ALL
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 49-16-00-410-075-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | APU/FUEL/BLOW OFF/PUMP | 2QC | B14 |
| 121VU | APU/FUEL/BLOW OFF/CTL | 1QC | K39 |
| 121VU | APU/FUEL/LP VALVE/CTL | 1QF | M40 |
| 121VU | APU/FUEL/LP VALVE/SPLY | 2QF | M39 |
| 121VU | APU/FUEL/PUMP/CTL | 3QC | M38 |
B. Close Access
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-001).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(5) Remove the access platform(s).
(1) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-001).
(2) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(5) Remove the access platform(s).
Air Intake System - Measurements