Installation of the Bleed Pressure-Regulator Valve
TASK 36-11-52-400-010-B
Installation of the Bleed Pressure-Regulator Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Expendable Parts
E. Referenced Information
3. Job Set-up
Subtask 36-11-52-860-064-A ** ON A/C NOT FOR ALL
Subtask 36-11-52-420-057-B ** ON A/C NOT FOR ALL
Subtask 36-11-52-410-056-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 04:09:56 UTC
Installation of the Bleed Pressure-Regulator Valve
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V01-002) | cleaning fluid |
| (Material No.V02-147) | lockwire |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 453 | HOT SECTION |
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 5 | SEAL | AIPC 36-11-52-80-030 |
| 6 | SEAL | AIPC 36-11-52-80-030 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 36-11-49-000-016-A | Removal of the Sense Line between the Bleed Pressure-Regulator Valve (PRV) and the Pylon Interface |
| TASK 36-11-49-400-016-A | Installation of the Sense Line between the Bleed Pressure-Regulator Valve (PRV) and the Pylon Interface |
| TASK 36-11-49-820-010-A | Rig the Bleed Air Ducts |
| TASK 36-11-52-000-010-B | Removal of the Bleed Pressure-Regulator Valve |
| TASK 36-11-52-790-010-A | Leak Test of the Bleed-Pressure Regulator Valve with the Engine in Operation |
| TASK 36-11-52-790-010-A-03 | Leak Test of the Bleed-Pressure Regulator Valve with the APU in Operation and with the Bleed Test Set P/N 98L36103002000 |
| TASK 36-11-52-790-010-A-04 | Leak Test of the Bleed-Pressure Regulator Valve with the Ground Air-Supply Unit and with the Bleed Test Set P/N 98L36103002000 |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 70-23-11-911-013-A | General Torque Tightening Techniques |
| TASK 70-23-13-911-010-A | Procedures for the Installation of Preformed Packings |
| TASK 70-23-15-912-010-A | Connection of Electrical Connectors |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 78-30-00-040-012-A | Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance |
| TASK 78-30-00-440-012-A | Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance |
| TASK 78-32-00-010-010-A | Opening of the Thrust Reverser Halves |
| TASK 78-32-00-410-010-A | Closing of the Thrust Reverser Halves |
Subtask 36-11-52-860-064-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that engine 1(2) is shutdown for a minimum of 5 minutes before you do this procedure.
(3) On AIR COND panel 30VU:
Subtask 36-11-52-010-070-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that engine 1(2) is shutdown for a minimum of 5 minutes before you do this procedure.
(3) On AIR COND panel 30VU:
- Make sure that the ENG 1(2) BLEED pushbutton-switch is released (the OFF legend is on).
- Make sure that the APU BLEED pushbutton-switch is released (the ON legend is off).
- Make sure that the WARNING NOTICE(S) is in position to tell persons not to operate the pneumatic system.
- Make sure that the WARNING NOTICE(S) is in position to tell persons not to start engine 1(2).
- Make sure that the WARNING NOTICE(S) is in position to tell persons not to pressurize the pneumatic system.
- Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton-switch is off.
- Make sure that the WARNING NOTICE(S) is in position to tell persons not to energize FADEC 1(2).
B. Get Access
(1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
Subtask 36-11-52-040-059-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Make sure that the thrust reverser doors are open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
C. Make sure that the thrust reverser Hydraulic Control Unit (HCU) is deactivated (Ref. AMM TASK 78-30-00-040-012).
Subtask 36-11-52-865-058-A ** ON A/C NOT FOR ALL D. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 36-11-52-110-051-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
E. Clean these parts
(1) Use a Textile-Lint free Cotton - (Material No.14SBA1) made moist with the cleaning fluid (Material No.V01-002) , to clean these parts:
(a) The ends of the ducts.
(b) The electrical connector.
(c) The electrical receptacle.
(d) The pressure sense line.
(e) The valve.
Subtask 36-11-52-020-072-A ** ON A/C NOT FOR ALL (1) Use a Textile-Lint free Cotton - (Material No.14SBA1) made moist with the cleaning fluid (Material No.V01-002) , to clean these parts:
(a) The ends of the ducts.
(b) The electrical connector.
(c) The electrical receptacle.
(d) The pressure sense line.
(e) The valve.
F. Removal of the Sense Line
4. ProcedureCAUTION:
BE CAREFUL WITH THE SEMI-FLEXIBLE SENSE LINE. DEFORMATION OF THE RIGID PART OR LARGE DEFORMATION OF THE FLEXIBLE PART CAN QUICKLY CAUSE LEAKAGE.
CAUTION:
USE TWO WRENCHES DURING DISCONNECTION OF THE SENSE LINE, ONE TO MAINTAIN THE FIXED NUT AND THE SECOND ONE TO LOOSEN/TIGHTEN THE SENSE LINE COUPLING.
(1) Make sure that the sense line between the bleed Pressure-Regulator Valve (PRV) and the pylon interface is removed (Ref. AMM TASK 36-11-49-000-016). Subtask 36-11-52-420-057-B ** ON A/C NOT FOR ALL
A. Installation of the Bleed Pressure-Regulator Valve (PRV)
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Remove the PLUG-BLANKING from each disconnected line end.
(6) Install the PRV as follows:
(a) Install a new AIPC 36-11-52-80-030 SEAL (5) and a new AIPC 36-11-52-80-030 SEAL (6) on the valve (1) (Ref. AMM TASK 70-23-13-911-010).
(b) Put the valve (1) in the correct position for the installation (Ref. AMM TASK 36-11-52-000-010).
(c) Install the couplings (4) and (7).
(d) Tighten the couplings (4) and (7) sufficiently to hold the valve (1) in position.
(e) Make sure that there is a clearance between the valve (1) and the bleed air duct.
(f) TORQUE the coupling nuts to between 85 and 75 lbf.in (0.96 and 0.85 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
Post SB 70-0614
(7) Install the heatshield assembly as follows:
(b) Put the hose clamps (10) and (11) in their position that is almost the same as shown in
(c) Install the lockwire:
End of Post SB 70-0614
Pre SB ENG 36-0007
(a) Connect the pressure sense line (3) to the valve.
End of Pre SB ENG 36-0007
Post SB ENG 36-0007
(b) Connect the pressure sense line (12) to the valve.
End of Post SB ENG 36-0007
(c) Connect the pressure sense line (8) to the valve.
(d) TORQUE the pressure sense line nuts to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013).
(9) Connect the electrical connector (2) to the valve (1) (Ref. AMM TASK 70-23-15-912-010).
Subtask 36-11-52-420-068-A ** ON A/C NOT FOR ALL (1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Remove the CAP-BLANKING from each electrical connector and receptacle.(4) Make sure that all the electrical connections are clean and in the correct condition.
(5) Remove the PLUG-BLANKING from each disconnected line end.
(6) Install the PRV as follows:
(a) Install a new AIPC 36-11-52-80-030 SEAL (5) and a new AIPC 36-11-52-80-030 SEAL (6) on the valve (1) (Ref. AMM TASK 70-23-13-911-010).
(b) Put the valve (1) in the correct position for the installation (Ref. AMM TASK 36-11-52-000-010).
(c) Install the couplings (4) and (7).
(d) Tighten the couplings (4) and (7) sufficiently to hold the valve (1) in position.
(e) Make sure that there is a clearance between the valve (1) and the bleed air duct.
(f) TORQUE the coupling nuts to between 85 and 75 lbf.in (0.96 and 0.85 m.daN )
(Ref. AMM TASK 70-23-11-911-013). CAUTION:
MAKE SURE THAT THE CLEARANCE BETWEEN THE VALVE AND THE ENGINE CORE IS CORRECT. DAMAGE TO THE VALVE CAN OCCUR IF CLEARANCE IS LESS THAN 0.39 IN. (10 MM).
(g) Do a check of the clearance between the valve (1) and the engine core flange. If necessary, do the rigging of the bleed air ducts (Ref. AMM TASK 36-11-49-820-010). Post SB 70-0614
(7) Install the heatshield assembly as follows:
NOTE: If the Vendor Service Bulletin (VSB) V2500-NAC-70-0614 is applied on the engine, the heatshield assembly is installed on the valve.
(a) Install the upper heatshield assembly (9) on the PRV (4001HA) between the valve and the engine case with the hose clamps (10) and (11). (b) Put the hose clamps (10) and (11) in their position that is almost the same as shown in
(c) Install the lockwire:
WARNING:
USE PROTECTIVE GOGGLES AND GLOVES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.
1 Safety the hose clamps (10) and (11) with lockwire (Material No.V02-147) . End of Post SB 70-0614
CAUTION:
BE CAREFUL WITH THE SEMI-FLEXIBLE SENSE LINE. DEFORMATION OF THE RIGID PART OR LARGE DEFORMATION OF THE FLEXIBLE PART CAN QUICKLY CAUSE LEAKAGE.
CAUTION:
USE TWO WRENCHES DURING DISCONNECTION OF THE SENSE LINE, ONE TO MAINTAIN THE FIXED NUT AND THE SECOND ONE TO LOOSEN/TIGHTEN THE SENSE LINE COUPLING.
(8) Install the pressure sense lines as follows: NOTE: Some interchangeable PRVs have a second pneumatic port on the regulator assembly.
Do not use the second pneumatic port. If necessary, install a PLUG - BLANKING on it.Pre SB ENG 36-0007
(a) Connect the pressure sense line (3) to the valve.
End of Pre SB ENG 36-0007
Post SB ENG 36-0007
(b) Connect the pressure sense line (12) to the valve.
End of Post SB ENG 36-0007
(c) Connect the pressure sense line (8) to the valve.
(d) TORQUE the pressure sense line nuts to between 145 and 135 lbf.in (1.64 and 1.53 m.daN )
(Ref. AMM TASK 70-23-11-911-013). (9) Connect the electrical connector (2) to the valve (1) (Ref. AMM TASK 70-23-15-912-010).
B. Installation of the Sense Line
Subtask 36-11-52-720-052-A ** ON A/C NOT FOR ALL CAUTION:
BE CAREFUL WITH THE SEMI-FLEXIBLE SENSE LINE. DEFORMATION OF THE RIGID PART OR LARGE DEFORMATION OF THE FLEXIBLE PART CAN QUICKLY CAUSE LEAKAGE.
CAUTION:
USE TWO WRENCHES DURING DISCONNECTION OF THE SENSE LINE, ONE TO MAINTAIN THE FIXED NUT AND THE SECOND ONE TO LOOSEN/TIGHTEN THE SENSE LINE COUPLING.
(1) Install the sense line between the bleed Pressure-Regulator Valve (PRV) and the pylon interface (Ref. AMM TASK 36-11-49-400-016). C. Do the Leak Test of the Bleed Pressure Regulator Valve (4001HA) with the Engine in Operation (Ref. AMM TASK 36-11-52-790-010).
5. Close-upNOTE: As an alternative procedure, you can do this leak test without engines in operation.
Subtask 36-11-52-410-056-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser halves (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
(3) Remove the access platform(s).
Subtask 36-11-52-440-058-A ** ON A/C NOT FOR ALL Subtask 36-11-52-410-066-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser halves (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR
(3) Remove the access platform(s).
C. Close Access
(1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
Subtask 36-11-52-862-051-A ** ON A/C NOT FOR ALL (1) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR
(2) Remove the WARNING NOTICE(S).
D. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
Bleed Pressure-Regulator Valve