Installation of the Sense Line between the Bleed Pressure-Regulator Valve (PRV) and the Pylon Interface
TASK 36-11-49-400-016-A
Installation of the Sense Line between the Bleed Pressure-Regulator Valve (PRV) and the Pylon Interface
This procedure is related to the installation of the third sense line installed between the bleed Pressure-Regulator Valve (PRV) and the pylon interface.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Work Zones and Access Panels
D. Referenced Information
3. Job Set-up
Subtask 36-11-49-860-100-A ** ON A/C NOT FOR ALL
Subtask 36-11-49-420-108-A ** ON A/C NOT FOR ALL
Subtask 36-11-49-410-152-A ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 01:11:14 UTC
Installation of the Sense Line between the Bleed Pressure-Regulator Valve (PRV) and the Pylon Interface
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
BE CAREFUL WHEN YOU DO WORK ON THE ENGINE PARTS AFTER THE ENGINE SHUTDOWN. USE APPLICABLE THERMAL GLOVES. THE ENGINE PARTS CAN STAY HOT FOR ONE HOUR AFTER SHUTDOWN AND CAN BURN YOU.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
CAUTION:
MAKE SURE THAT YOU USE THE CORRECT PLUG TO DO THE REGULATION FUNCTION OF PRV P/N 6774G010000. IF YOU DO NOT USE THE CORRECT PLUG, THERE IS A RISK OF OVERPRESSURE AND/OR POSSIBLE DUAL BLEED LOSS.
1. Reason for the JobThis procedure is related to the installation of the third sense line installed between the bleed Pressure-Regulator Valve (PRV) and the pylon interface.
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.V02-147) | lockwire |
| (Material No.03PBB1) | Lubricant-Anti Seize High Temp. - |
| (Material No.03QBC1) | Dry lubricant-General Assembly Molybdenum Disulfide & Silicone - |
| (Material No.08BBE1) | Non Aqueous Cleaner-- Methyl Alcohol - |
| (Material No.14SBA1) | Textile-Lint free Cotton - |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| FOR [1000EM1] (ENGINE-1) | |
| 437AL, 438AR, 451AL, 452AR | |
| FOR [1000EM2] (ENGINE-2) | |
| 447AL, 448AR, 461AL, 462AR | |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 36-11-52-790-010-A | Leak Test of the Bleed-Pressure Regulator Valve with the Engine in Operation |
| TASK 36-11-52-790-010-A-03 | Leak Test of the Bleed-Pressure Regulator Valve with the APU in Operation and with the Bleed Test Set P/N 98L36103002000 |
| TASK 36-11-52-790-010-A-04 | Leak Test of the Bleed-Pressure Regulator Valve with the Ground Air-Supply Unit and with the Bleed Test Set P/N 98L36103002000 |
| TASK 49-00-00-860-009-A | APU Shutdown by External Power (131-9(A)) |
| TASK 49-00-00-860-009-A-01 | APU Shutdown by Batteries (131-9(A)) |
| TASK 71-13-00-010-010-A | Opening of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 71-13-00-410-010-A | Closing of the Fan Cowls 437AL(447AL),438AR(448AR) |
| TASK 78-30-00-040-012-A | Deactivation of the Thrust Reverser Hydraulic Control Unit (HCU) for Ground Maintenance |
| TASK 78-30-00-440-012-A | Re-activation of the Thrust Reverser Hydraulic Control Unit (HCU) after Ground Maintenance |
| TASK 78-32-00-010-010-A | Opening of the Thrust Reverser Halves |
| TASK 78-32-00-410-010-A | Closing of the Thrust Reverser Halves |
Sense Line between the Bleed Pressure-Regulator Valve (PRV) and the Pylon Interface ** ON A/C NOT FOR ALL | |
Subtask 36-11-49-860-100-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that engine 1(2) is shutdown for a minimum of 5 minutes before you do this procedure.
(3) In the cockpit, on AIR COND panel 30VU:
(a) Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on).
(b) Make sure that the APU BLEED pushbutton switch is released (the ON legend is off).
(c) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to operate the pneumatic system.
(4) In the cockpit, on ENG panel 115VU:
(a) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to start engine 1(2).
(5) On the HP ground connector:
(a) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to pressurize the pneumatic system.
(6) On the ENG section of maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton-switch is off.
(b) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to energize FADEC 1(2).
(7) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position below the engine.
Subtask 36-11-49-010-175-A ** ON A/C NOT FOR ALL (1) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002) or (Ref. AMM TASK 24-41-00-861-002).
(2) Make sure that engine 1(2) is shutdown for a minimum of 5 minutes before you do this procedure.
(3) In the cockpit, on AIR COND panel 30VU:
(a) Make sure that the ENG 1(2) BLEED pushbutton switch is released (the OFF legend is on).
(b) Make sure that the APU BLEED pushbutton switch is released (the ON legend is off).
(c) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to operate the pneumatic system.
(4) In the cockpit, on ENG panel 115VU:
(a) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to start engine 1(2).
(5) On the HP ground connector:
(a) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to pressurize the pneumatic system.
(6) On the ENG section of maintenance panel 50VU:
(a) Make sure that the ON legend of the ENG/FADEC GND PWR 1(2) pushbutton-switch is off.
(b) Make sure that the WARNING NOTICE(S) is(are) in position to tell persons not to energize FADEC 1(2).
(7) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position below the engine.
B. Get Access
(1) Make sure that the fan cowls are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
(2) Make sure that the thrust reverser halves are open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
Subtask 36-11-49-040-129-A ** ON A/C NOT FOR ALL (1) Make sure that the fan cowls are open (Ref. AMM TASK 71-13-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
(2) Make sure that the thrust reverser halves are open (Ref. AMM TASK 78-32-00-010-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
C. Make sure that the Hydraulic Control Unit (HCU) of the thrust reverser is deactivated (Ref. AMM TASK 78-30-00-040-012).
Subtask 36-11-49-865-155-A ** ON A/C NOT FOR ALL D. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
Subtask 36-11-49-420-108-A ** ON A/C NOT FOR ALL
A. Installation of the Sense Line between the Bleed PRV and the Pylon Interface
(1) If you use the APU to energize the electrical circuits, stop the APU:
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
(4) Clean the component interfaces and the adjacent area.
(5) Remove the plug (5) from the port (2) of the valve (1).
(6) Clean the threads of the storage port (4) with a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) .
(7) Apply lubricating material in the storage port (4) of the valve (1) before installation of the plug (5) to prevent clogging as follows:
(8) Put the plug (5) in position on the storage port (4) of the valve (1).
(9) TORQUE the plug (5) to between 0.25 and 0.2 m.daN (22.12 and 17.70 lbf.in )
.
(10) Remove the plug (9) from the port (11) on the pylon interface.
(11) Clean the threads of the storage port (10) with a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) .
(12) Apply lubricating material in the storage port (10) of the pylon interface before installation of the plug (9) to prevent clogging as follows:
(13) Put the plug (9) in position on the storage port (10) of the pylon interface, through the warning loop of the sense line (3).
(14) TORQUE the plug (9) to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft )
.
(15) Clean the threads of the unions (2) and (11) with a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) or Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) .
(17) Remove the PLUG-BLANKING from each disconnected line end.
(18) Put the sense line (3) in position between the port (11) of the pylon interface and the port (2) of the valve (1).
(19) Tighten the unions manually.
(20) TORQUE the unions of the sense line (3) as follows:

(b) At the port (2) of the valve (1), to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
.
(21) Loosen the unions of the sense line (3) and do the TORQUE procedure again.
(22) Put the clamp (8) in position on the sense line (3).
(23) Put the screw (6), the washer (7) and the nut (12) in position on the clamp (8).
(a) TORQUE the screw (6) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
.
Subtask 36-11-49-480-058-A ** ON A/C NOT FOR ALL (1) If you use the APU to energize the electrical circuits, stop the APU:
- For GTCP 36-300 APU (Ref. AMM D/O 49-00-00-86)
- For APS 3200 APU (Ref. AMM D/O 49-00-00-86)
- For 131-9(A) APU (Ref. AMM TASK 49-00-00-860-009).
(a) Make sure that the pressure and the temperature of the bleed-air duct system are in ambient conditions.
WARNING:
MAKE SURE THAT THE PNEUMATIC SYSTEM IS DEPRESSURIZED BEFORE YOU START WORK. PRESSURIZED AIR CAN CAUSE INJURY TO PERSONNEL.
WARNING:
DO NOT TOUCH THE UNIT UNTIL IT IS SUFFICIENTLY COOL TO PREVENT BURNS WHEN YOU DO THE MAINTENANCE TASK(S).
(3) Do an inspection of the component interfaces and the adjacent area.(4) Clean the component interfaces and the adjacent area.
(5) Remove the plug (5) from the port (2) of the valve (1).
(6) Clean the threads of the storage port (4) with a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) .
(7) Apply lubricating material in the storage port (4) of the valve (1) before installation of the plug (5) to prevent clogging as follows:
CAUTION:
BEFORE YOU APPLY LUBRICANT, PUT TAPE ON THE UNION HOLES OF THE VALVE AND THE PYLON INTERFACE TO PREVENT LUBRICANT CONTAMINATION OF THE PNEUMATIC CONNECTION.
CAUTION:
APPLY ONLY A THIN LAYER OF GREASE TO THE THREADS OF THE HOSE-ASSEMBLY COUPLING NUTS, AND REMOVE THE UNWANTED GREASE TO PREVENT CONTAMINATION OF THE HOSE ASSEMBLY. IF YOU USE TOO MUCH GREASE, IT CAN CAUSE CLOGGING OF THE HOSE ASSEMBLY OR DAMAGE TO THE RELATED COMPONENTS.
(a) Apply a thin layer of Dry lubricant-General Assembly Molybdenum Disulfide & Silicone - (Material No.03QBC1) or Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threads of the storage port (4). (8) Put the plug (5) in position on the storage port (4) of the valve (1).
(9) TORQUE the plug (5) to between 0.25 and 0.2 m.daN (22.12 and 17.70 lbf.in )
. (10) Remove the plug (9) from the port (11) on the pylon interface.
(11) Clean the threads of the storage port (10) with a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) and Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) .
(12) Apply lubricating material in the storage port (10) of the pylon interface before installation of the plug (9) to prevent clogging as follows:
CAUTION:
BEFORE YOU APPLY LUBRICANT, PUT TAPE ON THE UNION HOLES OF THE VALVE AND THE PYLON INTERFACE TO PREVENT LUBRICANT CONTAMINATION OF THE PNEUMATIC CONNECTION.
CAUTION:
APPLY ONLY A THIN LAYER OF GREASE TO THE THREADS OF THE HOSE-ASSEMBLY COUPLING NUTS, AND REMOVE THE UNWANTED GREASE TO PREVENT CONTAMINATION OF THE HOSE ASSEMBLY. IF YOU USE TOO MUCH GREASE, IT CAN CAUSE CLOGGING OF THE HOSE ASSEMBLY OR DAMAGE TO THE RELATED COMPONENTS.
(a) Apply a thin layer of Dry lubricant-General Assembly Molybdenum Disulfide & Silicone - (Material No.03QBC1) or Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threads of the storage port (10). (13) Put the plug (9) in position on the storage port (10) of the pylon interface, through the warning loop of the sense line (3).
(14) TORQUE the plug (9) to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft )
. (15) Clean the threads of the unions (2) and (11) with a lint-free cotton cloth Textile-Lint free Cotton - (Material No.14SBA1) or Non Aqueous Cleaner-- Methyl Alcohol - (Material No.08BBE1) .
CAUTION:
BEFORE YOU APPLY LUBRICANT, PUT TAPE ON THE UNION HOLES OF THE VALVE AND THE PYLON INTERFACE TO PREVENT LUBRICANT CONTAMINATION OF THE PNEUMATIC CONNECTION.
CAUTION:
APPLY ONLY A THIN LAYER OF GREASE TO THE THREADS OF THE HOSE-ASSEMBLY COUPLING NUTS, AND REMOVE THE UNWANTED GREASE TO PREVENT CONTAMINATION OF THE HOSE ASSEMBLY. IF YOU USE TOO MUCH GREASE, IT CAN CAUSE CLOGGING OF THE HOSE ASSEMBLY OR DAMAGE TO THE RELATED COMPONENTS.
(16) Apply a thin layer of Dry lubricant-General Assembly Molybdenum Disulfide & Silicone - (Material No.03QBC1) or Lubricant-Anti Seize High Temp. - (Material No.03PBB1) to the threads of the unions (2) and (11).(17) Remove the PLUG-BLANKING from each disconnected line end.
(18) Put the sense line (3) in position between the port (11) of the pylon interface and the port (2) of the valve (1).
(19) Tighten the unions manually.
(20) TORQUE the unions of the sense line (3) as follows:
WARNING:
TIGHTEN THE UNION(S) TO THE CORRECT TORQUE VALUE. IF YOU DO NOT TIGHTEN THEM SUFFICIENTLY, HOT AIR LEAKAGE CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
(a) At the port (11) of the pylon interface, to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft ) 
(b) At the port (2) of the valve (1), to between 1.7 and 1.5 m.daN (12.54 and 11.06 lbf.ft )
. (21) Loosen the unions of the sense line (3) and do the TORQUE procedure again.
(22) Put the clamp (8) in position on the sense line (3).
(23) Put the screw (6), the washer (7) and the nut (12) in position on the clamp (8).
(a) TORQUE the screw (6) to between 0.48 and 0.37 m.daN (42.48 and 32.74 lbf.in )
. B. Prepare for the leak test
(1) Do the steps that follow to install FOIL - ALUMINUM on the pylon interface around the unions of the sense line, around the plug on the storage port (10) and around the port (11):
Subtask 36-11-49-410-149-A ** ON A/C NOT FOR ALL (1) Do the steps that follow to install FOIL - ALUMINUM on the pylon interface around the unions of the sense line, around the plug on the storage port (10) and around the port (11):
- Wind the foil wrap around the joint one time.
- Twist the seam of the foil wrap tight.
- Make the foil wrap as tight as possible on the tube but do not cause damage to the wrap.
- Attach the foil wrap at the two sides of the pneumatic joint with lockwire (Material No.V02-147) .
C. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser halves (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
Subtask 36-11-49-440-098-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Close the thrust reverser halves (Ref. AMM TASK 78-32-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
451AL 452AR
(b) FOR [1000EM2] (ENGINE-2)
461AL 462AR.
D. Do the activation of the Hydraulic Control Unit (HCU) of the thrust reverser (Ref. AMM TASK 78-30-00-440-012).
Subtask 36-11-49-865-156-A ** ON A/C NOT FOR ALL E. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 36-11-49-720-079-A ** ON A/C NOT FOR ALL | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 49VU | AIR BLEED/ENG 1/CTL | 3HA1 | D12 |
| 49VU | AIR BLEED/ENG 1/MONG | 2HA1 | D11 |
| 122VU | AIR BLEED/ENG 2/CTL | 3HA2 | Z23 |
| 122VU | AIR BLEED/ENG 2/MONG | 2HA2 | Z22 |
F. Leak Test
(1) Do the leak test of the related PRV (Ref. AMM TASK 36-11-52-790-010).
(a) Make sure that there are no leaks at the unions of the sense line.
5. Close-up(1) Do the leak test of the related PRV (Ref. AMM TASK 36-11-52-790-010).
(a) Make sure that there are no leaks at the unions of the sense line.
NOTE: There is a leak when the foil installed on the sense line breaks or when it is too hot.
(b) Remove the materials used to do the leak test. Subtask 36-11-49-410-152-A ** ON A/C NOT FOR ALL
A. Close Access
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
Subtask 36-11-49-862-095-A ** ON A/C NOT FOR ALL (1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the WARNING NOTICE(S).
(3) Remove the access platform(s).
(4) Close the fan cowls (Ref. AMM TASK 71-13-00-410-010):
(a) FOR [1000EM1] (ENGINE-1)
437AL 438AR
(b) FOR [1000EM2] (ENGINE-2)
447AL 448AR.
B. De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
(Ref. AMM TASK 24-41-00-862-002) or (Ref. AMM TASK 24-41-00-862-002).
Sense Line between the Bleed Pressure-Regulator Valve (PRV) and the Pylon Interface