Installation of the Check Valve
TASK 32-31-47-400-001-A
Installation of the Check Valve
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
C. Expendable Parts
D. Referenced Information
3. Job Set-up
Subtask 32-31-47-860-051-A
Subtask 32-31-47-420-051-A
Subtask 32-31-47-410-051-A
[Rev.10 from 2021]
2026.04.01 12:31:05 UTC
Installation of the Check Valve
WARNING:
MAKE SURE THAT ALL THE CIRCUITS IN MAINTENANCE ARE ISOLATED BEFORE YOU SUPPLY ELECTRICAL POWER TO THE AIRCRAFT. UNWANTED ELECTRICAL POWER CAN BE DANGEROUS.
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING:
OBEY THE HYDRAULIC SAFETY PROCEDURES.
WARNING:
BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
FIN: 2537GM
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Consumable Materials
| REFERENCE | DESIGNATION |
|---|---|
| (Material No.02ABA1) | Phosphate Ester Hydraulic Fluid-General Power - - |
| (Material No.04JMD9) | Top Coat Polyurethane-- Decorative Furnishing |
| FIG.ITEM | DESIGNATION | IPC-CSN |
|---|---|---|
| 6 | PACKING | AIPC 32-31-03-48-030 |
| 6 | PACKING | AIPC 32-31-83-50-080 |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 12-12-29-611-001-A | Fill the Hydraulic Fluid Reservoir with a Hand Pump |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 29-00-00-910-002-A | Safety Procedures of the Hydraulic System |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 29-14-00-614-001-A | Depressurization of the Hydraulic Reservoirs |
| TASK 29-23-00-860-001-A | Disconnection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 29-23-00-860-002-A | Connection of the Isolation Coupling of the Power Transfer Unit (PTU) |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
| TASK 32-12-00-010-001-A | Open the Main Gear Doors for Access |
| TASK 32-12-00-410-001-A | Close the Main Gear Doors after Access |
| TASK 32-31-00-720-002-A | Functional Test of the Normal Extension and Retraction of the Landing Gear |
| TASK 51-75-13-916-002-A | Repair to a layer of Corrosion Preventive Compound |
Subtask 32-31-47-860-051-A
A. Aircraft Maintenance Configuration
(1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(2) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(3) Make sure that the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
(4) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
(5) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
Subtask 32-31-47-865-051-A (1) Make sure that the PTU isolation coupling is disconnected (Ref. AMM TASK 29-23-00-860-001).
(2) Make sure that the aircraft electrical circuits are energized (Ref. AMM TASK 24-41-00-861-002).
(3) Make sure that the flight configuration precautions were obeyed (Ref. AMM TASK 32-00-00-860-001).
(4) Make sure that the Green hydraulic system is depressurized (Ref. AMM TASK 29-10-00-864-001).
(5) Make sure that the reservoir of the Green hydraulic system is depressurized (Ref. AMM TASK 29-14-00-614-001).
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged:
Subtask 32-31-47-941-051-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
C. Safety Precautions
(1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
Subtask 32-31-47-560-050-A (1) Make sure that the WARNING NOTICE(S) are in position to tell persons not to pressurize the Green hydraulic system:
- On panel 40VU in the cockpit
- On the ground service panel of the Green hydraulic system.
D. Preparation for Installation
(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to
4. Procedure(1) Clean the component interfaces and the adjacent area.
(2) Do an inspection of the component interfaces and the adjacent area.
(3) Make sure that the parts retained from the removed component are clean and in the correct condition.
(4) Obey the hydraulic safety procedures (Ref. AMM TASK 29-00-00-910-002).
(5) Apply Phosphate Ester Hydraulic Fluid-General Power - - (Material No.02ABA1) to
- The new AIPC 32-31-03-48-030 PACKING (6) or the new AIPC 32-31-83-50-080 PACKING (6)
- The threads of the reducer tee (3)
- The check valve (5).
Subtask 32-31-47-420-051-A
A. Installation of the Check Valve 2537GM
(1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Put the packing (6) on the check valve (5).
(3) Install the check valve (5) in the manifold (7).
(4) TORQUE the check valve (5) to between 6.83 and 6.26 m.daN (50.37 and 46.17 lbf.ft )
.
(5) Put the reducer tee (3) in position and connect the connector (4). Do not tighten at this time.
(6) Connect the connectors (1) and (2) to the reducer tee (3) and the check valve (5).
(7) TORQUE the connector (4) to between 5.3 and 4.8 m.daN (39.09 and 35.40 lbf.ft )
.
(8) TORQUE the connector (1) to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft )
.
(9) TORQUE the connector (2) to between 2.94 and 2.6 m.daN (21.68 and 19.17 lbf.ft )
.
(10) Identify all the connectors with Top Coat Polyurethane-- Decorative Furnishing (Material No.04JMD9) .
Subtask 32-31-47-865-052-A (1) Remove the PLUG-BLANKING from each disconnected line end.
(2) Put the packing (6) on the check valve (5).
(3) Install the check valve (5) in the manifold (7).
(4) TORQUE the check valve (5) to between 6.83 and 6.26 m.daN (50.37 and 46.17 lbf.ft )
. (5) Put the reducer tee (3) in position and connect the connector (4). Do not tighten at this time.
(6) Connect the connectors (1) and (2) to the reducer tee (3) and the check valve (5).
(7) TORQUE the connector (4) to between 5.3 and 4.8 m.daN (39.09 and 35.40 lbf.ft )
. (8) TORQUE the connector (1) to between 3.2 and 2.9 m.daN (23.60 and 21.39 lbf.ft )
. (9) TORQUE the connector (2) to between 2.94 and 2.6 m.daN (21.68 and 19.17 lbf.ft )
. (10) Identify all the connectors with Top Coat Polyurethane-- Decorative Furnishing (Material No.04JMD9) .
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s):
Subtask 32-31-47-860-052-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 49VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | H12 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/CTL | 1701GK | R35 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R34 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | HYDRAULIC/G HYD/PUMP ENG1/MONG | 1702GK | R33 |
C. Preparation for Test
(1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(2) If the flight configuration precautions were obeyed, put the aircraft back to the serviceable condition (Ref. AMM TASK 32-00-00-860-002).
(3) Remove the container.
(4) Remove the WARNING NOTICE(S).
(5) Remove the access platform(s).
(6) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(7) If necessary, fill the reservoir of the Green hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
Subtask 32-31-47-720-050-A (1) Connect the PTU isolation coupling (Ref. AMM TASK 29-23-00-860-002).
(2) If the flight configuration precautions were obeyed, put the aircraft back to the serviceable condition (Ref. AMM TASK 32-00-00-860-002).
(3) Remove the container.
(4) Remove the WARNING NOTICE(S).
(5) Remove the access platform(s).
(6) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(7) If necessary, fill the reservoir of the Green hydraulic system to the correct level (Ref. AMM TASK 12-12-29-611-001).
D. Do the functional test of the MLG normal extension and retraction system (Ref. AMM TASK 32-31-00-720-002).
(1) Open the right MLG door (Ref. AMM TASK 32-12-00-010-001).
(2) Make sure that there is no hydraulic fluid leakage from the check valve 2537GM.
5. Close-up(1) Open the right MLG door (Ref. AMM TASK 32-12-00-010-001).
(2) Make sure that there is no hydraulic fluid leakage from the check valve 2537GM.
Subtask 32-31-47-410-051-A
A. Close Access
(1) Apply corrosion protection to the check valve 2537GM, the connectors and the adjacent areas (Ref. AMM TASK 51-75-13-916-002).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Apply corrosion protection to the check valve 2537GM, the connectors and the adjacent areas (Ref. AMM TASK 51-75-13-916-002).
(2) Make sure that the work area is clean and clear of tools and other items.
(3) Close the right MLG door (Ref. AMM TASK 32-12-00-410-001).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
Check Valve 2537GM