Functional Test of the Normal Extension and Retraction of the Landing Gear
TASK 32-31-00-720-002-A
Functional Test of the Normal Extension and Retraction of the Landing Gear
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Referenced Information
3. Job Set-up
Subtask 32-31-00-941-071-A
Subtask 32-31-00-720-052-A
5. Close-up
Subtask 32-31-00-860-063-A
[Rev.10 from 2021]
2026.04.01 03:59:00 UTC
Functional Test of the Normal Extension and Retraction of the Landing Gear
WARNING:
PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU START A TASK ON OR NEAR:
1. Reason for the Job- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | AR | SAFETY BARRIER(S) |
| No specific | AR | WARNING NOTICE(S) |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 07-11-00-581-001-A | Lifting for Aircraft Maintenance Operations |
| TASK 07-11-00-586-002-A | Lowering of the Aircraft for Maintenance Operations |
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 29-10-00-863-001-A | Pressurize the Green Hydraulic System with a Hydraulic Ground Power-Cart |
| TASK 29-10-00-864-001-A | Depressurize the Green Hydraulic System |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 32-00-00-481-001-A | Installation of the Safety Devices on the Landing Gears |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
Subtask 32-31-00-941-071-A
A. Safety Precautions
(1) Put the SAFETY BARRIER(S) in position.
(2) Make sure that the ground safety locks are installed on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On the panel 400VU:
(5) Put the WARNING NOTICE(S) adjacent to the NLG and MLG to tell persons to keep clear.
Subtask 32-31-00-869-103-A (1) Put the SAFETY BARRIER(S) in position.
(2) Make sure that the ground safety locks are installed on the landing gear (Ref. AMM TASK 32-00-00-481-001).
(3) On the panel 400VU:
- make sure that the landing-gear control-lever 6GA is in the DOWN position
- put a WARNING NOTICE(S) in position to tell persons not to operate the landing gear.
(5) Put the WARNING NOTICE(S) adjacent to the NLG and MLG to tell persons to keep clear.
B. Flight Configuration Precautions
(1) Do the flight configuration precautions (Ref. AMM TASK 32-00-00-860-001).
Subtask 32-31-00-582-050-A Subtask 32-31-00-865-060-A (1) Do the flight configuration precautions (Ref. AMM TASK 32-00-00-860-001).
D. Make sure that this(these) circuit breaker(s) is(are) closed:
Subtask 32-31-00-860-061-A | PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C ALL | |||
| 49VU | L/G/LGCIU/SYS1/NORM | 1GA | C09 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R33 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R32 |
| ** ON A/C ALL | |||
| 121VU | HYDRAULIC/LGCIU/SYS2 | 2GA | Q35 |
| 121VU | HYDRAULIC/LGCIU/SYS1/GRND SPLY | 52GA | Q34 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | LGCIU/BAT SPLY/SYS2 | 59GA | R32 |
| 121VU | LGCIU/BAT SPLY/SYS1 | 58GA | R31 |
E. Aircraft Maintenance Configuration
(Ref. AMM TASK 29-10-00-863-001).
(2) Energize the electrical circuits:
(4) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
Subtask 32-31-00-081-051-A WARNING:
MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM. UNWANTED MOVEMENT OF HYDRAULICALLY OPERATED ITEMS CAN CAUSE SERIOUS INJURY AND/OR DAMAGE.
(1) Pressurize the Green hydraulic system(Ref. AMM TASK 29-10-00-863-001).
(2) Energize the electrical circuits:
- energize the electrical circuits from the external power (Ref. AMM TASK 24-41-00-861-002)
or - energize the electrical circuits from the APU (Ref. AMM TASK 24-41-00-861-002).
(4) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
F. Removal of the Safety Devices
4. ProcedureCAUTION:
REMOVE THE SAFETY STAY BEFORE YOU DO THE LANDING GEAR EXTENSION AND RETRACTION TESTS. DAMAGE TO THE FUSELAGE CAN OCCUR IF THE AIRCRAFT MOVES DURING THE TESTS.
(1) Remove the ground safety locks from the landing gear: - for the NLG, remove the pin-ground lock
- for the MLG, remove the ground lock sleeve from each MLG lockstay actuator.
Subtask 32-31-00-720-052-A
WARNING:
MAKE SURE THAT THE TRAVEL RANGES OF THE LANDING GEAR ARE CLEAR.
A. Functional Test of the Normal Extension and Retraction of the Landing Gear NOTE: During the test procedure, monitor the retraction and extension times:
(1) Do this test: - the retraction cycle (from the first door-uplock open to the last door-uplock closed) is between 10 and 15 seconds
- the extension cycle (from the first door-uplock open to the last door-uplock closed) is between 15 and 21 seconds
- the minimum flow capacity necessary from the ground hydraulic cart is 140 l.min (36.9838 USgal.mn).
| ACTION | RESULT |
|---|---|
| 1.On the panel 402VU, make sure that the LDG GEAR down and locked lights are on (green). | |
2.On the ECAM CP:
| On the ECAM lower DU:
|
3.On the panel 400VU:
| On the panel 402VU:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the panel 402VU:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the panel 402VU:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the ECAM lower DU:
|
4.On the panel 400VU:
| On the panel 402VU:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the panel 402VU:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the ECAM lower DU:
|
| | On the aircraft:
|
| | On the ECAM lower DU:
|
| 5.Do the test procedure again. This is to make sure that the two LGCIUs operate correctly. | |
Subtask 32-31-00-860-063-A
A. Aircraft Maintenance Configuration
(1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) Depressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-864-001).
(3) De-energize the electrical circuits:
Subtask 32-31-00-481-051-A (1) Do the EIS stop procedure (Ref. AMM TASK 31-60-00-860-002).
(2) Depressurize the Green hydraulic system
(Ref. AMM TASK 29-10-00-864-001).
(3) De-energize the electrical circuits:
- de-energize the electrical circuits from the external power (Ref. AMM TASK 24-41-00-862-002)
or - de-energize the electrical circuits from the APU (Ref. AMM TASK 24-41-00-862-002).
B. Install the Ground Safety Locks
(1) Install the ground safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001):
Subtask 32-31-00-586-050-A Subtask 32-31-00-869-104-A (1) Install the ground safety locks on the landing gear (Ref. AMM TASK 32-00-00-481-001):
- for the NLG, the pin-ground lock
- for the MLG, the ground lock sleeve.
D. Flight Configuration Precautions
(1) Put the aircraft back to the ground configuration (Ref. AMM TASK 32-00-00-860-002).
Subtask 32-31-00-942-056-A (1) Put the aircraft back to the ground configuration (Ref. AMM TASK 32-00-00-860-002).
E. Removal of Equipment
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the SAFETY BARRIER(S).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(1) Make sure that the work area is clean and clear of tools and other items.
(2) Remove the SAFETY BARRIER(S).
(3) Remove the WARNING NOTICE(S).
(4) Remove the ground support and maintenance equipment, the special and standard tools and all other items.