Operational Test of the ACT Automatic Transfer System
TASK 28-28-00-710-004-A
Operational Test of the ACT Automatic Transfer System
Self explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
B. Work Zones and Access Panels
C. Referenced Information
3. Job Set-up
Subtask 28-28-00-860-060-A ** ON A/C NOT FOR ALL
Subtask 28-28-00-860-062-C ** ON A/C NOT FOR ALL
5. Close-up
Subtask 28-28-00-860-061-C ** ON A/C NOT FOR ALL
[Rev.10 from 2021]
2026.04.01 07:22:22 UTC
Operational Test of the ACT Automatic Transfer System
WARNING:
OBEY THE FUEL SAFETY PROCEDURES.
1. Reason for the JobSelf explanatory
2. Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
| REFERENCE | QTY | DESIGNATION |
|---|---|---|
| No specific | 1 | AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY |
| No specific | 1 | GAGE 5 BAR (75 PSI) - PRESSURE |
| 98D28108658000 | 1 | TOOL-PRESSURE TEST,ACT |
| ZONE/ACCESS | ZONE DESCRIPTION |
|---|---|
| 151BC |
| REFERENCE | DESIGNATION |
|---|---|
| TASK 24-41-00-861-002-A | Energize the Aircraft Electrical Circuits from the External Power |
| TASK 24-41-00-861-002-A-01 | Energize the Aircraft Electrical Circuits from the APU |
| TASK 24-41-00-861-002-A-02 | Energize the Aircraft Electrical Circuits from Engine 1(2) |
| TASK 24-41-00-862-002-A | De-energize the Aircraft Electrical Circuits Supplied from the External Power |
| TASK 24-41-00-862-002-A-01 | De-energize the Aircraft Electrical Circuits Supplied from the APU |
| TASK 24-41-00-862-002-A-02 | De-energize the Aircraft Electrical Circuits Supplied from the Engine 1(2) |
| TASK 25-55-11-000-002-A | Removal of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 25-55-11-400-002-A | Installation of the Ceiling Panels in the Aft Cargo-Compartment - FR47/FR59 |
| TASK 27-80-00-866-005-A | Retracting the Slats on the Ground |
| TASK 28-00-00-910-001-A | Fuel Safety Procedures |
| TASK 28-46-00-710-001-A | Test of the Tank High-Level Sensing-System |
| TASK 31-60-00-860-001-A | EIS Start Procedure |
| TASK 31-60-00-860-002-A | EIS Stop Procedure |
| TASK 32-00-00-860-001-A | Flight Configuration Precautions with Electrical Power |
| TASK 32-00-00-860-001-A-01 | Flight Configuration Precautions without Electrical Power |
| TASK 32-00-00-860-002-A | Ground Configuration after Flight Configuration with Electrical Power |
| TASK 32-00-00-860-002-A-01 | Ground Configuration after Flight Configuration without Electrical Power |
| TASK 32-69-00-860-802-A | Simulation of Flight with False Targets (With Aircraft on Ground) |
| TASK 52-30-00-860-001-A | Open the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
| TASK 52-30-00-860-002-A | Close the FWD or Aft Cargo-Compartment Door with the Yellow Electric Pump |
Subtask 28-28-00-860-060-A ** ON A/C NOT FOR ALL
A. Aircraft Maintenance Configuration
(1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(4) On the ECAM control panel, push the FUEL pushbutton switch.
(a) On the lower ECAM DU the FUEL page comes into view.
(5) On the lower ECAM DU, make sure there is 300 +100 kg or -0 kg (661.3866 +220.4622 lb or +0.0000 lb) fuel in each installed ACT.
(6) On the lower ECAM DU, make sure that the fuel quantity:
(8) Do the High Level Sensing Test (Ref. AMM TASK 28-46-00-710-001).
(9) On refuel/defuel control panel 800/801VU, make sure that the door is closed.
Subtask 28-28-00-865-055-A ** ON A/C NOT FOR ALL (1) Obey the fuel safety procedures (Ref. AMM TASK 28-00-00-910-001).
(2) Energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-861-002).
(3) Do the EIS start procedure (upper ECAM DU and lower ECAM DU only)
(Ref. AMM TASK 31-60-00-860-001).
(4) On the ECAM control panel, push the FUEL pushbutton switch.
(a) On the lower ECAM DU the FUEL page comes into view.
(5) On the lower ECAM DU, make sure there is 300 +100 kg or -0 kg (661.3866 +220.4622 lb or +0.0000 lb) fuel in each installed ACT.
(6) On the lower ECAM DU, make sure that the fuel quantity:
- of the center tank is 3300 +100 kg or -100 kg (7275.2526 +220.4622 lb or -220.4622 lb).
- of the wing tanks on each side is 1400 +100 kg or -100 kg (3086.4708 +220.4622 lb or -220.4622 lb).
NOTE: A fuel failure message can come into view on ECAM display, if the necessary fuel quantity in the Wing Tanks and in the Center Tank is too much out of the necessary limits for the test.
(7) Open the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-001). (8) Do the High Level Sensing Test (Ref. AMM TASK 28-46-00-710-001).
(9) On refuel/defuel control panel 800/801VU, make sure that the door is closed.
B. Make sure that this(these) circuit breaker(s) is(are) closed:
4. Procedure| PANEL | DESIGNATION | FIN | LOCATION |
|---|---|---|---|
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT1/REFUEL & SPLY | 33QU | L29 |
| 121VU | ACT LOW LVL R | 51QJ | M29 |
| 121VU | ACT LOW LVL L | 52QJ | M28 |
| 121VU | ACT XFR VALVE MAN CTL | 30QH | N29 |
| 121VU | ACT1/CTL & SPLY | 9QH | P29 |
| 121VU | ACT PUMP SUPPLY | 25QH | Q29 |
| ** ON A/C NOT FOR ALL | |||
| 121VU | ACT2/REFUEL & SPLY | 34QU | L28 |
| 121VU | ACT2/CTL & SPLY | 10QH | P28 |
Subtask 28-28-00-860-062-C ** ON A/C NOT FOR ALL
A. Preparation for the Test
(1) In the aft cargo-compartment, remove the access panel from ceiling panel 151BC, to get access to the test ports of the ACT pressurization system (Ref. AMM TASK 25-55-11-000-002).
(2) Connect an AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY pressure maximum to test port T1.
(3) Connect a GAGE 5 BAR (75 PSI) - PRESSURE maximum to test port T2.
(5) Do the flight-configuration precaution procedure (Ref. AMM TASK 32-00-00-860-001).
Subtask 28-28-00-710-054-B ** ON A/C NOT FOR ALL (1) In the aft cargo-compartment, remove the access panel from ceiling panel 151BC, to get access to the test ports of the ACT pressurization system (Ref. AMM TASK 25-55-11-000-002).
(2) Connect an AIR SOURCE 2 BAR (30 PSI) - REGULATED, FILTERED, DRY pressure maximum to test port T1.
(3) Connect a GAGE 5 BAR (75 PSI) - PRESSURE maximum to test port T2.
NOTE: You can use a pressure gauge of the smaller scale with the steps of 0.01 bar (0.1 psi).
NOTE: You can use the 98D28108658000 TOOL-PRESSURE TEST,ACT as an alternative tool and connect it to the T1 and T2 test ports.
(4) Fully retract the slats (Ref. AMM TASK 27-80-00-866-005). (5) Do the flight-configuration precaution procedure (Ref. AMM TASK 32-00-00-860-001).
WARNING:
WHEN YOU USE COMPRESSED AIR:
B. Test - USE THE CORRECT PROTECTION (FACE SHIELD OR GOGGLES)
- DO NOT POINT THE AIRFLOW AT YOURSELF OR OTHER PERSONS.
NOTE: The fuel transfer rate must be between approximately 30 l/min and 100 l/min, with an ACT pressurization of 220 mbar (3.19 psi) and an aircraft pitch of 2 degrees.
The highest fuel transfer rate, with a maximum positive gravity head, is calculated from these parameters:
The highest fuel transfer rate, with a maximum positive gravity head, is calculated from these parameters:
- A temperature of approximately 40 deg. C,
- ACT(s) full 2992 l (790.3963 USgal),
- Center tank almost empty.
- A temperature of approximately - 40 deg. C,
- ACT(s) almost empty,
- Center tank full 8250 l (2179.4017 USgal).
| ACTION | RESULT |
|---|---|
1.On the Ground Pressure Generator (GPG):
NOTE: The pressurization of the ACT bladder tank forces air out of the drain mast. | |
| 2.Do the Simulation of Flight with False Targets, with the Aircraft on the Ground (Ref. AMM TASK 32-69-00-860-802). NOTE: Let the aircraft in simulated flight mode during the test of the automatic fuel transfer. | |
3.In the cockpit, on the ECAM control panel:
| In the cockpit, on the ECAM DU:
|
| | On the pressure gauge at the test connector T2:
NOTE: If the pressure on T2 connector is more than 0.25 bar (3.626 psi), stop the air supply immediately. |
| | In the cockpit, on the ECAM DU fuel page:
|
| 4.Stop the Simulation of Flight with False Targets, with the Aircraft on the Ground, to make sure that the aircraft goes back to ground mode (Ref. AMM TASK 32-69-00-860-802). | In the cockpit, on the ECAM DU fuel page:
|
5.On the GPG:
| On the pressure gauge at the test connectors T1 and T2:
|
Subtask 28-28-00-860-061-C ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Put the aircraft back to ground configuration (Ref. AMM TASK 32-00-00-860-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Install the access panel on the ceiling panel 151BC (Ref. AMM TASK 25-55-11-400-002).
(5) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(6) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(7) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
(1) Remove the ground support and maintenance equipment, the special and standard tools and all other items.
(2) Put the aircraft back to ground configuration (Ref. AMM TASK 32-00-00-860-002).
(3) Make sure that the work area is clean and clear of tools and other items.
(4) Install the access panel on the ceiling panel 151BC (Ref. AMM TASK 25-55-11-400-002).
(5) Do the EIS stop procedure
(Ref. AMM TASK 31-60-00-860-002).
(6) Close the aft cargo-compartment door (Ref. AMM TASK 52-30-00-860-002).
(7) De-energize the aircraft electrical circuits
(Ref. AMM TASK 24-41-00-862-002).
ACT Principle Diagram