W DOC AIRBUS | AMM A320F

Installation of the NF Speed Probe [PW11]


TASK 77-11-22-400-801-A
Installation of the NF Speed Probe


WARNING: BE CAREFUL WHEN YOU DO WORK ON THE ENGINE AFTER SHUTDOWN. THE ENGINE CAN STAY HOT FOR A LONG TIME. IF YOU DO NOT OBEY THIS INSTRUCTION, INJURY CAN OCCUR.
WARNING: BE CAREFUL WHEN YOU USE CONSUMABLE MATERIALS. OBEY THE MATERIAL MANUFACTURER'S INSTRUCTIONS AND YOUR LOCAL REGULATIONS.
ZONE: 400
FIN: 4066KS ** ON A/C NOT FOR ALL
1. Reason for the Job
Self explanatory
2. Job Set-up Information
 A. Fixtures, Tools, Test and Support Equipment
REFERENCE
QTY
DESIGNATION
No specific
1
ACCESS PLATFORM 1M(3 FT)
No specific
1
PLIERS - JAWED, SOFT
No specific
1
RETENTION PIN TEST TOOL
No specific
Torque wrench: range to between 22 and 16 lbf.in (0.25 and 0.18 m.daN ) T
No specific
Torque wrench: range to between 100 and 90 lbf.in (1.13 and 1.02 m.daN ) T
No specific
Torque wrench: range to between 130 and 110 lbf.in (1.47 and 1.24 m.daN ) T
M8196914-02
1
CONTACT INSERT EXTRACT TOOL
OR
OR
M8196917-01
1

 B. Consumable Materials
REFERENCE
DESIGNATION
(Material No.P03-001)
lubricant, aircraft turbine engine
(Material No.P06-053)
Sealing Ring Lubricant
(Material No.P06-054)
Antigalling Compound
 C. Work Zones and Access Panels
ZONE/ACCESS
ZONE DESCRIPTION
400
POWER PLANT, NACELLES AND PYLONS
FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR, 452AR
FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR, 462AR
 D. Expendable Parts
FIG.ITEM
DESIGNATION
IPC-CSN
4
PACKINGS
EIPC 77-11-22-04-090
 E. Referenced Information
REFERENCE
DESIGNATION
TASK 71-00-00-720-811-A
Test No. 3A - Idle Power Test
TASK 71-00-00-860-832-A
Procedure to Prevent Engine Motoring and to Stop the Electrical Supply to the EEC
TASK 71-13-00-010-802-A
Opening of the Fan Cowl Doors
TASK 71-13-00-410-802-A
Closing of the Fan Cowl Doors
TASK 72-11-01-400-801-A
Installation of the Inlet Cone
TASK 72-11-03-400-801-A
Installation of the Fan Blades
TASK 72-21-02-400-803-A
Installation of the Structural Guide Vane
TASK 72-21-08-400-801-A
Installation of the Fan Exit Liner Segments
TASK 73-21-00-710-807-A
Test No.6 - EEC Operation Test (Idle Test)
TASK 73-25-34-400-802-A
Installation of the Engine Interface Unit (EIU)
TASK 78-30-00-040-805-A
Deactivation of the Thrust Reverser System for Ground Maintenance
TASK 78-30-00-440-805-A
Reactivation of the Thrust Reverser System after Ground Maintenance
TASK 78-36-00-010-802-A
Opening of the Thrust Reverser Cowl-Doors
TASK 78-36-00-410-802-A
Closing of the Thrust Reverser Cowl-Doors
3. Job Set-up
Subtask 77-11-22-941-051-A ** ON A/C NOT FOR ALL
A. Safety Precautions
   (1) Make sure that you did the procedure to prevent engine motoring and to stop the electrical supply to the Electronic Engine Control (EEC)
(Ref. AMM TASK 71-00-00-860-832).
Subtask 77-11-22-010-052-A ** ON A/C NOT FOR ALL
B. Get Access
   (1) Make sure that the fan cowl doors are open (Ref. AMM TASK 71-13-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR.
   (2) Make sure that the ACCESS PLATFORM 1M(3 FT) is in position.
Subtask 77-11-22-040-051-A ** ON A/C NOT FOR ALL
C. Deactivation of the Thrust Reverser for Maintenance
WARNING: YOU MUST DEACTIVATE THE THRUST REVERSER BEFORE YOU DO WORK ON OR AROUND IT. IF YOU DO NOT, THE THRUST REVERSER CAN OPERATE ACCIDENTALLY AND CAUSE AN INJURY AND/OR DAMAGE.
   (1) Make sure that you did the deactivation of the thrust reverser system for maintenance (Ref. AMM TASK 78-30-00-040-805).
Subtask 77-11-22-010-053-A ** ON A/C NOT FOR ALL
D. Get Access
   (1) Make sure that the right thrust-reverser cowl-doors is open (Ref. AMM TASK 78-36-00-010-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR.
4. Procedure
Subtask 77-11-22-420-050-A ** ON A/C NOT FOR ALL
A. Installation of the NF Speed Probe
CAUTION: REMOVE THE PROTECTION COVERS FROM THE OPENINGS AS NECESSARY TO PREVENT ENGINE DAMAGE.
   (1) Make sure that you remove all the necessary COVER - PROTECTION to prevent damage to the engine.
   (2) Make sure that you wipe clean all the parts and tools to remove contamination and to prevent damage to the engine.
   (3) Install the NF speed probe (1) to the No. 1 and No. 1.5 bearing support assembly as follows:
     (a) Apply P03-001lubricant, aircraft turbine engine or Sealing Ring Lubricant (Material No.P06-053) to the two new packings (4).
     (b) Apply Antigalling Compound (Material No.P06-054) to the threads of the three bolts (2).
NOTE: For new or refurbished bolts with baked on lubricant, do not do the wet application.
     (c) Install the two new EIPC 77-11-22-04-090 PACKINGS (4) to the NF speed probe (1).
     (d) Install the NF speed probe (1) with the two bolts (14).
     (e) Put the NF speed probe cable through the strut and fan intermediate case.
     (f) Install the cushion (5) if necessary.
     (g) TORQUE the two bolts (2) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
T equally and in small increments.
     (h) Attach the NF speed probe (1) with the bolt (2) and clamp (3).
     (i) TORQUE the bolt (2) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN )
T.
   (4) Install the NF speed probe (1) on the compressor intermediate-case (CIC) bulkhead as follows:
     (a) Apply Antigalling Compound (Material No.
P06-054) to the threads of the two bolts (17).
NOTE: For new or refurbished bolts with baked on lubricant, do not do the wet application.
     (b) Move the protective braid of the harness back and install the backshell to the cable end.
NOTE: The backshell is not installed to the connector (14) at this time.
     (c) Use the M8196914-02 CONTACT INSERT EXTRACT TOOLM8196917-01 to install the white wire with blue stripe to hole No. 2 on the connector (14).
     (d) Use the M8196914-02 CONTACT INSERT EXTRACT TOOLM8196917-01 to install the white wire to hole No. 3 on the connector (14).
     (e) Install the backshell approximately two full turns onto the connector (14).
     (f) Make sure the protective braid is not under the backshell clamp.
     (g) Install the eyelet into backshell clamp screw (15) and put the harness wires in position in the clamp.
     (h) TORQUE the two nuts (16) to between 22 and 16 lbf.in (0.25 and 0.18 m.daN ) T.
NOTE: The clamp saddle bars must touch on the backshell ears.
     (i) Do a contact retention test (push test) on pin No. 2 and No. 3 with the RETENTION PIN TEST TOOL or equivalent tool:
CAUTION: DO NOT USE TOOLS TO PULL ON THE CONNECTOR PINS. IF YOU DO NOT OBEY THIS INSTRUCTION, DAMAGE TO THE PINS CAN OCCUR.
       1 If the pin(s) are pushed back into the connector (14), disassemble the backshell, remove the wires with the
M8196914-02 CONTACT INSERT EXTRACT TOOLM8196917-01 and do step 4 (b) again.
     (j) TORQUE the backshell hex nut to between 130 and 110 lbf.in (1.47 and 1.24 m.daN ) T.
     (k) Do a continuity check of the pin No. 2 to ground (connector shell) which must read infinity (00).
     (l) Do a continuity check of the pin No. 3 to ground (connector shell) which must read infinity (00).
     (m) Do a continuity check of the pin No. 2 to pin No. 3 which must read within 30 ohms.
     (n) If the continuity check does not check properly, disassemble the backshell, remove the wires with the
M8196914-02 CONTACT INSERT EXTRACT TOOLM8196917-01 and do step A. (4)(b) again.
     (o) Install the connector (14) to the compressor intermediate-case (CIC) bulkhead with the two bolts (17).
     (p) TORQUE the two bolts (17) to between 100 and 90 lbf.in (1.13 and 1.02 m.daN ) T.
   (5) Connect the wiring harness (WC04) connector (P44) to the NF speed probe receptacle (J44) as follows:
     (a) Examine, align and engage the connector.
     (b) Push lightly inward on the connector while you tighten the coupling ring.
     (c) Use the PLIERS - JAWED, SOFT and tighten the connector against the receptacle.
     (d) Make sure that you can feel the ratchet feature.
     (e) While you tighten, push the connector in and from side to side.
     (f) Tighten the connector until the PLIERS - JAWED, SOFT slip on the connector ring.
   (6) Install the NF speed probe cable on the spring clips as follows:
     (a) Start at the middle of the NF speed probe cable.
     (b) Put the NF speed probe cable into position and push it into the spring clips as you keep a 0.50 in. (12.70 mm) minimum distance from all other engine hardware.
     (c) Make sure that all the spring clips are engaged with the NF speed probe cable.
     (d) Make sure the tension in the NF speed probe cable is sufficient to prevent loose or tight conditions.
   (7) Install the appropriate structural guide vane (
Ref. AMM TASK 72-21-02-400-803).
   (8) Install the appropriate fan-exit liner segments (Ref. AMM TASK 72-21-08-400-801).
   (9) Install the fan blades (Ref. AMM TASK 72-11-03-400-801).
   (10) Install the inlet cone (Ref. AMM TASK 72-11-01-400-801).
   (11) Examine the assembly for unwanted objects, damage and correct assembly.
   (12) Make sure that you install all the necessary COVER - PROTECTION to prevent damage to the engine.
5. Close-up
Subtask 77-11-22-860-050-A ** ON A/C NOT FOR ALL
A. Put the aircraft back to its initial configuration.
   (1) Make sure that the work area is clean and clear of tools and other items.
   (2) Close the right thrust-reverser cowl-doors (Ref. AMM TASK 78-36-00-410-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
452AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
462AR.
Subtask 77-11-22-440-050-A ** ON A/C NOT FOR ALL
B. Do the reactivation of the thrust reverser system after maintenance (Ref. AMM TASK 78-30-00-440-805).
Subtask 77-11-22-410-051-A ** ON A/C NOT FOR ALL
C. Close Access
   (1) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-802):
     (a) FOR [4020KM1] (POWER PLANT-DEMOUNTABLE, ENG 1)
437AL, 438AR
     (b) FOR [4020KM2] (POWER PLANT-DEMOUNTABLE, ENG 2)
447AL, 448AR.
   (2) Remove the access platform(s).
   (3) Remove the WARNING NOTICE(S).
   (4) Make sure that all the circuit breakers shown in the paragraph Procedure of the engine interface unit installation are closed. If they are not, close them in the recommended sequence
(Ref. AMM TASK 73-25-34-400-802).
Subtask 77-11-22-720-050-A ** ON A/C NOT FOR ALL
D. Tests
   (1) Do the test N°3 - Idle power test (Ref. AMM TASK 71-00-00-720-811).
   (2) Do the test N°6 - EEC - Idle test (Ref. AMM TASK 73-21-00-710-807).
[Rev.10 from 2021] 2026.04.01 03:18:44 UTC